Fermilab IB1 Vertical Test Stand Update C.M. Ginsburg (Fermilab) for the VTS group August 31, 2006 16 ft.

Slides:



Advertisements
Similar presentations
1 Hall-D CB+EG Meeting Report George Lolos University of Regina May 22, 2004.
Advertisements

1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
RF Cavity / Coupling Coil Module
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
US Cavities Status and Plan Mark Champion 01 October 2009.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Vertical Test Stand Update C.M. Ginsburg (Fermilab) For the VTS group: C.Sylvester, Y.Huang, R.Nehring, J.Ozelis, T.Peterson, V.Poloubotko, R.Rabehl, I.Rakhno,
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
Fermilab Vertical Cavity Test Facility (VCTF) VTS2&3 Project Status Ruben Carcagno, Camille Ginsburg, and Cosmore Sylvester On behalf of the VTS Group.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.
Vertical Test Stand in IB1 C.M. Ginsburg (Fermilab) for the IB1 VTS Group SRF R&D Meeting 6.July 2006.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
Advance Planning Briefing for Industry 10 October 2008 Mr. Chuck Comaty.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
ANL CRAB CAVITY JEFFERSON LAB LHC-CC08 BROOKHAVEN FEBRUARY 25, 2008 LARRY TURLINGTON.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
SBS Magnet and Support Status Robin Wines June 2013.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
November 12, 2009 PM Process Improvement Plan: Employee Presentation.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE Coupling Coil Test Proposal Ruben Carcagno Fermilab July 9, MICE CC Test Proposal7/11/2011.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
February 13, 2007C.M. Ginsburg (Fermilab-TD)1 Fermilab Vertical Test Facility for ILC cavities Vertical Cavity Test Facility (VCTF) IB1 infrastructure.
LCLS II FNAL Niobium Pre- Procurement Review - Overview Camille M. Ginsburg, FNAL April 17, 2014.
N. Dhanaraj 1 Single Cell Program - Status Single Cell Program - Status March 1, 2007 Thursday.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
650 MHz Cryomodule -- Discussions at RRCAT October 2010 Tom Peterson, with Harry Carter, Camille Ginsburg, and Jim Kerby 19 Nov 2010.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Vertical Test Stand Update
WP High Beta Cavities Delivery
Director’s Progress Review Closeout Meeting
Report to JACoW on ICALEPCS 2007
State Lobbyist Services
Request for Proposals For Banking Services CMU
Progress and Issues with VTS Upgrade
MICE CM31 Schedule summary
CONTRACT DOCUMENTS & CONSTRUCTION
Industrialization of previous projects
2K CB FDR Conclusion:  Project Summary, Procurement Plan / Status
Injector Performance Requirements Conventional Facilities Update
Director’s Progress Review Closeout Meeting
Potential Milestones A timeline to finish in one year
Prototype cryomodule development
How do you prepare a request for proposal (RFP)?
Review plan of the nature reporting – update 6
Undulator and Magnet Production Status 25 October 2006
East Hall under construction
Presentation transcript:

Fermilab IB1 Vertical Test Stand Update C.M. Ginsburg (Fermilab) for the VTS group August 31, ft

31.Aug.2006C.M. Ginsburg VTS ILC/SRF mtg2 Cryostat Procurement Contacted vendors × Ability Engineering (South Holland, IL), American Magnetics (Oak Ridge, TN), Cryofab (Kenilworth, NJ) Cryogenic Plants and Services (Linde), (Tulsa, OK) CVPI (Emmaus, PA) Meyer Tool (Oak Lawn, IL) PHPK (Columbus, OH) xyz company (WI) Plan – Detailed bid evaluation criteria exist – Ron Evans to request more detailed milestone schedule and contingency plan – VTS group to evaluate bids by Tuesday 5.Sep. – Award contract by end of next week The cryostat procurement still drives the schedule – delivery early March 2006 Two bids

31.Aug.2006C.M. Ginsburg VTS ILC/SRF mtg3 RF System Design Dates – RF System Design Review: 24.August – Written report from committee: 30.August Many helpful comments, no show-stoppers, no scheduling issues – VTS response to committee: expect ~8.September Thanks to Review Committee members – Brian Chase – Wolf-Dietrich Moeller – Ralph Pasquinelli (chair) – John Reid – Jim Steimel – Chuck Worel Thanks to Jefferson Lab – VTS RF design based on that from JLab vertical test facility – Thanks Tom Powers for tremendous assistance with design modifications and review documentation/presentation – Formal MOU addendum with JLab approved 28.Aug., for limited assistance on RF system/DAQ from T. Powers and C. Grenoble

31.Aug.2006C.M. Ginsburg VTS ILC/SRF mtg4 Next VTS plans Radiation safety review – in coordination with AD/ES&H – Specify topics for review ASAP – aim for review early October “Final” iteration of radiation shielding design Radiation shielding lid/movement mechanical design Magnetic shielding – Complete detail drawing Cryostat top plate design Cavity suspension cage design Continuing work on cryogenic system modifications