Presentation is loading. Please wait.

Presentation is loading. Please wait.

Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Similar presentations


Presentation on theme: "Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT."— Presentation transcript:

1 Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT

2 CURRENT EFFORTS FOR M.T.F. FINALIZE DETAILS OF FORCED COOLANT FLOW ABSORBER TO BE INSERTED INTO THE LAB G MAGNET. COORDINATE DESIGN OF THE CONVECTIVE TYPE ABSORBER FOR THE SAME LOCATION (KEK COLLABORATION). COMPLETE WINDOWS DESIGN WITH SHOP DRAWINGS FOR FABRICATION (TO BE SUBMITTED TO THE MISSISSIPPI COLLABORATION AT THE END OF THIS MEETING). INITIATE THE INTERFACE RESOLUTION OF UP & DOWN SIDE VACUUM WINDOW DESIGN REQUIREMENTS, (INCLUDING IMMEDIATE AND FUTURE EXPERIMENT PROGRAMS) START INSTRUMENTATION HARDWARE INTEGRATION DESIGN FOR THE IMMEDIATE TEST PLANS.

3 Edgar L. Black MAGNET, CRYOSTAT & ABSORBER LAYOUT

4 Edgar L. Black MTF ABSORBER FORCED FLOW

5 Edgar L. Black WINDOW/ ABSORBER SEAL DETAIL (SECTION OF THE MANIFOLD)

6 Edgar L. Black ABSORBER WINDOW DETAIL

7 Edgar L. Black WINDOW TEST PLATE

8 Edgar L. Black VACUUM VESSEL WINDOW

9 Edgar L. Black CURRENT EFFORTS FOR M.I.C.E. NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH THE RF FEEDS). NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH THE RF FEEDS). INITIATED PLANT LAYOUT COORDINATION FOR THE INSTALLATION AT RAL (COMMUNICATION WITH IOURY) INITIATED PLANT LAYOUT COORDINATION FOR THE INSTALLATION AT RAL (COMMUNICATION WITH IOURY) NEED MORE INFORMATION ON THE PLANT FACILITIES NEED MORE INFORMATION ON THE PLANT FACILITIES

10 Edgar L. Black SFOFO/M.I.C.E. CONFIGURATION

11 Edgar L. Black M.I.C.E. SFOFO

12 Edgar L. Black LOCATION IN QUESTION PARTIAL VIEW OF THE R.A.L. FACILITY

13 Edgar L. Black LOCATION ENLARGED

14 Edgar L. Black FUTURE ACTIVITIES WITH TIME DURATIONS (HRS) 1-FABRICATION OF 21CM WINDOWS AND PRESSURE TEST PLATES. 480 3 OR 5 WINDOWS FOR EACH MATERIAL? 3 OR 5 WINDOWS FOR EACH MATERIAL? 2 - RESOLVE VACUUM WINDOW ISSUES AND COMPLETE THE DESIGN FOR FABRICATION 80 3 -PERFORM PHOTOGRAMETRY MEASUREMENTS OF THE AS BUILT WINDOWS AT FERMILAB.300 5 - SET UP FACILITY AT N.I.U. FOR WATER AND CRYO PRESSURE BURST TESTS AND TEST.80 6 - PERFORM PHOTOGRAMETRY MEASUREMENTS DURING TEST AT N.I.U. 100 7 - FABRICATION OF MANIFOLD ASSEMBLY AND ACCEPTANCE TEST. 200 8 - COMPLETE INFRARED HEAT TRANSFER FLOW WITH THE 15 CM MANIFOLD ASSEMBLY. 60 9 - PROCURE (OR BORROW) VERTICAL CRYOSTAT FOR THE ABSORBERS FLOW TEST. 160 OR 60 10 - SETUP CRYO FLOW TEST SYSTEM (AT FERMILAB OR N.I.U.) AND PERFORM TESTS.320


Download ppt "Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT."

Similar presentations


Ads by Google