The CCB, TTC and so forth Paul Padley, Mike Matveev.

Slides:



Advertisements
Similar presentations
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
Advertisements

Selection Board PRR G. Avoni, I. Lax, U. Marconi INFN Bologna PRR, 13/6/06.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
CSC Endcap Muon Port Card Status Mikhail Matveev Rice University.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
PPIB and ODMB Status Report Rice University April 19, 2013.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
FPGA IRRADIATION and TESTING PLANS (Update) Ray Mountain, Marina Artuso, Bin Gui Syracuse University OUTLINE: 1.Core 2.Peripheral 3.Testing Procedures.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Gregory PawloskiAugust 22, 2002 MPC Testing Progress.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Status of the CSC Track-Finder Darin Acosta University of Florida.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
J. Christiansen, CERN - EP/MIC
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
TTCrx Issues M.Matveev Rice University December 17, 2009.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
US Status of GbE Peripheral Crate Controller Ben Bylsma EMU meeting Fermilab, October 21, 2005 Section 1: Hardware Section 2: Firmware Development.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
DAQMB Status – Onward to Production! S. Durkin, J. Gu, B. Bylsma, J. Gilmore,T.Y. Ling DAQ Motherboard (DMB) Initiates FE digitization and readout Receives.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US Peripheral Crate VMEbus Controller Ben Bylsma EMU – ESR CERN, November 2003.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Calorimeter CROC PRR CERN Calorimeter ReadOut Card PRR Tests of the CROC Calo CROC PRR – Tuesday 19 December 06.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
DAQ and TTC Integration For MicroTCA in CMS
Production Firmware - status Components TOTFED - status
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
University of California Los Angeles
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
Irradiation Test of the Spartan-6 Muon Port Card Mezzanine
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
University of California Los Angeles
Effect of an ALCT SEU Much-overlooked good stuff
University of California Los Angeles
Sector Processor Status Report
Presentation transcript:

The CCB, TTC and so forth Paul Padley, Mike Matveev

Current CCB Status 5 CCBs were built in 2001 and distributed 15 more sets of boards have been manufactured 10 of these boards have been stuffed and tested Remaining boards will be built in April..May

CCB Plans Current board is “Preproduction Prototype” However we will not consider it fully tested until it has been used in a structured test beam with TTC system. At this time we are still getting firmware change requests and we will for some time.  (perhaps even in 2008?)

TTC Software Status Karol Bunkowski of Warsaw visited and installed and wrote software Windows GUI application Console application A Rice graduate student is learning the code by porting to Linux  A point of discussion, should the TTC be in a separate 6U crate, as this is how it will be in the end. (ie don’t port to Dynatem?)

CCB, Phos 4, TTCrx

CCB Irradiation Test Conducted at the UC Davis 63 MeV proton beam facility J. Roberts in January 2002 by J. Roberts with Rice undergrad Altera EPF10K100ABC356 PLD (uses LUT for logic functions and SRAM configuration elements) and EPC2 EPROM under test Both devices were accessible remotely over long JTAG cable Mezzanine card with PLD and EPROM

Test Information Neither TTC, nor VME systems were involved in a test Design under test was running at 40 Mhz (dynamic mode) 16-bit Pseudo-Random Bit Stream (PRBS) generators were used to produce test patterns Two streams of test patterns passed through a pipeline registers and were compared at the end Error signal was transmitted to control room for counting

Test Results PLD Altera PLD was irradiated with a dose up to 1 kRad 20 SEU were observed, with an average dose of 50 Rad to get an error Cross Section of SEU ~2.5x10 -9 cm 2 (consistent with ALCT test results obtained in 2000) No Single Event Latch-ups

Test Results EPROM Altera EPROM was irradiated with a dose up to 26 kRad No errors in read-back configuration up to 25.6 kRad Read-back failed at 25.8 kRad Cross Section of SEU < 5x cm 2

Interpretation SE upsets in SRAM configuration seem to be the dominant effect during PLD irradiation (consistent with other published results). All errors were recoverable by remote configuration from EPROM. No power cycling required. For Altera EPF10K100ABC356 the worst case SEU rate at full LHC luminosity would be 2.5x10 -9 cm 2 x neutrons/cm -2 / 5x10 7 sec = 5x10 -6 sec -1 (one SEU per Altera PLD in ~60 hours) Report is available on the web at:

Solution 1 Reload Altera PLD from EPROM periodically (just like everything else in crate) Altera can decode “Hard Reset” and issue to itself, after it has issued it to the crate Configuration time ~120 milliseconds

Issues with Solution 1 CCB inactive during reconfiguration Some minor modifications needed on CCB and mezzanine cards

Solution 2 Use existing UCLA-built mezzanine card based on Xilinx XCV600E Faster reconfiguration (25 ms) SEU rate one order of magnitude less? (based on OSU and UCLA tests)

Issues with Solution 2 Significant changes in CCB main board Must convert firmware to Xilinx from Altera Still need to reconfigure periodically

Solution 3 Build new mezzanine card based on one time programmable fpga (Actel A54SX32 for example) Expected SEU rate is three orders of magnitude less than Altera (based on tests for Atlas) One SEU per fpga in 5 years

Issues with Solution 3 Not reprogrammable so when do you port a design into antifuse version? New mezzanine design (6 months engineering) Suggestion from Gena Use PLD for start of running at low luminosity. Switch to non-reprogrammable logic when luminosity increases (Costs ~$100,000 to make such a switch)

PHOS4 features CERN designed 4-channel delay ASIC with 1 ns delay precision Radiation Hard Programmable (write-only) over I2C bus

Issues with PHOS4 The PHOS4 is intended for use with non-interruptable clock source (since the chip utilized DLL circuitry) If clock is interrupted, then the behavior is unpredictable  wrong delays  “dead-looking” channels  no direct way to identify what is wrong with the chip  Only power cycling can help Lack of dedicated “reset” pin Delay settings are not readable back via I2C bus We have suggested that the chip be redesigned

Clock Interruptions? In our opinion, the clock should never be interrupted (except on power cycling) TTC tree is designed so clock won’t be interrupted A question to CMS/LHC is “How often can we expect the clock to be interrupted?”

Interruptions What to do if interruptions are a problem?  PHOS4 can be simply removed from the CCB boards (all 4 socketed) and clocks wired directly to LVDS transmitters no individual slot-to-slot and module-to- module clock adjustments no extra effort to program I2C same PCB layout, minimal on-board changes

Another Question All clock lines in the custom peripheral backplane are point-to-point LVDS of the same length. Do we really need to adjust the 40Mhz clock from slot to slot and from module to module?

Another Alternative If fine clock adjustments on the backplane are still needed  PHOS4 can be replaced with another device, for example, 3D7408 proposed by OSU 1-channel commercial CMOS programmable delay chip This device has 45/55 output duty cycle instead of 50/50 at 40Mhz (tested at Rice). Is it acceptable for DMB/TMB/ALCT? layout changes on a CCB board required Radiation tolerance?

TTC Issues

Trouble Reported At the last CMS week (and continuing) reports from many groups that they can not drive optical links with a TTC derived clock At the last CMS week (and continuing) reports from many groups that they can not drive optical links with a TTC derived clock (Sorry, but nobody [but us] is documenting what they are doing, so I can’t point you to anything written on the topic) (Sorry, but nobody [but us] is documenting what they are doing, so I can’t point you to anything written on the topic) Our report is at Our report is at

The Issue TTC group has specified that they will deliver clock good to 50ps rms. TTC group has specified that they will deliver clock good to 50ps rms. Groups using CERN GOL (not us) claim TTCrx can’t drive their links Groups using CERN GOL (not us) claim TTCrx can’t drive their links Reports of jitter measurements ~500ps Reports of jitter measurements ~500ps At last CMS week microelectronics group agreed to improve TTCrx At last CMS week microelectronics group agreed to improve TTCrx ( time scale?) ( time scale?)

Our Measurement Mezzanine CardECP CECP B TTCrx ASIC operating voltage+5.0V+3.3V+5.0V Clock40Des1 jitter, ps (no BC, no L1A) Clock40Des1 jitter, ps (BC commands + L1A) New TTCrxOld TTCrx

Our Test CCBCCB TTCVITTCVI BIT3BIT3 TTCVXTTCVX OPTOOPTO OPTOOPTO TTCrx ERROR 1 m 100 m VME 9UVME 6U COPPER CABLEOPTICAL CABLE OLD AND NEW TTCrx BOARDS WERE TESTED WITH Mhz CLOCK SOURCE FROM TTCvx MODULE Mhz CLOCK WAS MULTIPLIED BY 2 BY AV9170 CHIP NO ERRORS OBSERVED IN PRBS TEST FROM ONE OPTOBOARD TO ANOTHER AT Mhz (BER < c -1 ) 40 Mhz Clock multiplier PC

Our Result Clock jitter is lower for the newest TTCrx ASIC (Version 3.1, 12/01) Clock jitter is lower for the newest TTCrx ASIC (Version 3.1, 12/01) Jitter increases if broadcast commands and L1A are transmitted from the TTC system Jitter increases if broadcast commands and L1A are transmitted from the TTC system Jitter distribution for ASIC Ver.3.1 looks “normal” (unlike previous version) Jitter distribution for ASIC Ver.3.1 looks “normal” (unlike previous version) Clock jitter is lower if the new ASIC is powered from +5V Clock jitter is lower if the new ASIC is powered from +5V Jitter introduced by any of two TTCrx ASICs and other components in the clock distribution circuitry at our testing setup is tolerable for TLK2501 transceivers operating at Mhz using prototype MPC-SR link Jitter introduced by any of two TTCrx ASICs and other components in the clock distribution circuitry at our testing setup is tolerable for TLK2501 transceivers operating at Mhz using prototype MPC-SR link

DAQMB test A further test is interesting: driving EMU DAQ link with TTC derived clock. A further test is interesting: driving EMU DAQ link with TTC derived clock. Requires TTCrx, TTCvi, TTCvx and software Requires TTCrx, TTCvi, TTCvx and software

TTCrx Mezzanine Card Status Only one new board (borrowed from Wisconsin) is available so far for EMU electronics. Being used for CCB testing at Rice Some TTCrx changes have been requested from CERN designers: - low profile connectors (otherwise the board doesn’t fit the CCB) - better ID/reset scheme (separate SubAd[7..0] and Data[7..0] output busses from ID input bus) Next versions of the TTCrx ASIC and mezzanine card are expected (later in 2002?- 2003?) with lower clock jitter and other improvements

TTCvi and TTCvx Status One set of TTCvi and TTCvx modules is being used for CCB testing at Rice Originally designed at CERN for Atlas. Apparently, CERN will build the next version of the TTCvi. Several CMS- specific requirements have been defined for the TTCvi upgrade. Also, the TTCvx should provide 80.16Mhz clock source rather than 80.00Mhz

Conclusion There are many issues that EMU will need to address as a group that impact integration in the peripheral crate and with the TTC system