Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR 13.10.2015 Sweden FranceIndia Finland GermanyPoland Spain.

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Status of the FAIR Project Boris Sharkov FAIR Scientific Director GSI AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia.
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
exchangeswith AnPHA AnPHA NSAC NSAC + ALAFNA Review status of the fieldReview status of the field Issue recommendations to advance t to advance the science.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
International FAIR Boris Sharkov FAIR / MEPhI Scientific Managing Director, Lomonosov MSU 2015 Sweden FranceIndia Finland GermanyPoland UK Romania Russia.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland Spain.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany PANDA Collaboration, Giessen – 18 March 2014 Status and News from FAIR.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Itzhak Tserruya Weizmann Institute of Science
Status of the FAIR Project
ESS Innovation Procurement Workshop
ESR Slow highly charged ions and antiprotons
Status of the FAIR Project
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
Status of LEB J. Gerl GSI – Darmstadt, Germany NUSTAR Week 2011
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
FAIR – the Universe in the labororatory
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
and collaboration with France
Presentation transcript:

Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain Romania Russia Slovenia UK

UNILAC SIS18 SIS100/300 p-Linac HESR CR & RESR NESR Cryring Rare-Isotope Production Target Anti-Proton Production Target 100 m Facility for Antiproton and Ion Research 2 – new international research laboratory under construction to explore the nature and evolution of matter in the Universe

Beam Intensities: intensities of primary beams: x 100 – x 1000 intensities of secondary beams: x Beam Energies: energies: x 30 Unprecedented Variety of Ions: antiprotons protons to Uranium, radioactive beams Beam Quality: cooled antiprotons intense cooled RIBs Pulse Structure: extremely short pulses (70 ns) to slow extraction (quasi CW) Parallel Operation: (Finally) operation of up to four experiments simultaneously Acc Performance for FAIR Experiments

UNILAC SIS18 SIS100/300 p-Linac HESR CR & RESR NESR Cryring Rare-Isotope Production Target Anti-Proton Production Target 100 m Accelerator Facility Primary Beams /s; 1.5 GeV/u; 238 U /s 238 U 73+ up to 35 GeV/u 3x10 13 /s 30 GeV protons Secondary Beams Storage and Cooler Rings radioactive beams antiprotons GeV/c, stored and cooled Technical Challenges cooled beams, rapid cycling superconducting magnets range of radioactive beams up to GeV/u; up to factor higher in intensity than presently antiprotons GeV 4

Physics at FAIR 5 Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Materials Science & Radiation Biology (Ion & antiproton beams) Materials Science & Radiation Biology (Ion & antiproton beams) Accelerator Physics UNILAC SIS18 SIS100/300p-Linac HESR CR & RESR NESR Cryring Rare-Isotope Production Target Anti-Proton Production Target 100 m QCD-Phase Diagram (HI beams 2 to 45 GeV/u) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) Hadron Physics (Stored and cooled 14 GeV/c anti-protons) Hadron Physics (Stored and cooled 14 GeV/c anti-protons) Nuclear Structure & Astrophysics (Rare-isotope beams) Nuclear Structure & Astrophysics (Rare-isotope beams) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions)

GSI Helmholtzzentrum für Schwerionenforschung GmbH CBM nuclear matter at high densities NUSTAR neutron-rich nuclei APPA ions in extreme electro- magnetic fields PANDA hadron physics with antiprotons 6 4 Research Pillars

Staging ( ) Baseline Technical Report 2005 Boris Sharkov, Karlheinz Langanke7

Staging ( ) Baseline Technical Report 2005 Start Version Phase A 2007 (SIS100) Phase B (SIS300) Boris Sharkov, Karlheinz Langanke8

Staging ( ) Baseline Technical Report 2005 Start Version Phase A 2007 (SIS100) Phase B (SIS300) Modularised Start Version 2009 Module 0Module 1Module 2Module 3Module 4Module 5 SIS100Exp. halls CBM & APPA Super-FRS NuSTAR Antiproton Facility PANDA & options NuSTAR LEB, NESR, FLAIR NuSTAR & APPA RESR PANDA, NuSTAR & APPA “Based on recent cost estimates (2009) and the funding commitments of the FAIR Member States MSV of the Projects comprises modules 0 – 3.” Boris Sharkov, Karlheinz Langanke9

Modularised Start Version (MSV) Downscaling with the MSV 10 APPA CBM/HADES NUSTAR PANDA Modules M0: SIS100 M1: APPA M1: CBM/HADES M2: NUSTAR M3: PANDA, NuSTAR, APPA M0 M1 M2 M3 Cost about 1.6 billion by 2018 (1 billion 2005 Euros)

Baseline 2010 (just before founding of FAIR) Charge for the White Book: „The Modularized Startversion“ Financial ceiling of 1027 M€ State of planning as of October 2009 None of the four scientific pillars to be omitted completely The full version must be still possible Scientific program must be competitive and world class Boris Sharkov, Karlheinz Langanke11 The MSV should enable realization of outstanding forefront research program to all 4 scientific pillars of FAIR After several evaluations by external reviewers and the FAIR Scientific Council ( report to the Council 20 January 2013) MSV: Significant reduction of the initial performance of all experiments (can be recovered later) Modules 0 – 3 confirmed

GSI Helmholtzzentrum für Schwerionenforschung GmbH Workshop, MEPHI, O. Kester Heavy ion accelerator chain SIS18 NuSTAR Collector Ring Super-FRS CBM SIS

GSI Helmholtzzentrum für Schwerionenforschung GmbH Workshop, MEPHI, O. Kester Anti proton accelerator chain SIS18 p-Linac p-bar target Collector Ring HESR APPA SIS 100 PANDA 13

GSI Helmholtzzentrum für Schwerionenforschung GmbH Workshop, MEPHI, O. Kester  GSI accelerators  intense upgrade program UNILAC and SIS18 upgrade for high intensity and high brilliance  FAIR accelerator challenges  SC-magnets production and testing  Beam instrumentation and controls  rf-systems and timing  Beam transport and collimation,  Stochastic beam cooling  Beam physics (talk of Oliver Boine-Frankenheim) 14 Summary

Originally planned FAIR facility Boris Sharkov, Karlheinz Langanke15 Downscaling with the MSV: Blue: Existing Red: MSV Yellow:Postponed, but still feasible

Steering company International Convention International Partners FAIR GmbH SwedenFranceIndiaFinlandGermanyPolandUKRomaniaRussiaSlovenia Wiesbaden,

17 FAIR Members‘ Contributions ( 2005 Kosten) FAIR CountriesTotal declared Contribution (k€) China Finland France Germany Great Britain India Poland Romania Russia Slovenia Spain Sweden Total Not shareholders

Costs of the MSV Boris Sharkov, Karlheinz Langanke18 Total costs (M€)2005 pricesEscalated prices* Experiments Accelerators Acc. coordination personnel Personnel FAIR GmbH Running costs Civil Construction original estimate 78,0 385,0 110,9 38,0 15,4 495,0 83,6 412,5 113,1 43,1 19,8 676,3 Subtotal1.122,31.348,4 less site costs1.027,31.220,9 Civil Construction cost increase227,9 320,1 LEB buildingLEB building6,59,6 Total incl. site costs1.356,81.678,1 Civil construction cost overrun of 320 million € not covered.

Boundary Conditions for the Future Strategy Boris Sharkov, Karlheinz Langanke19 1.MSV is the minimal configuration that allows all scientific pillars to operate 2.the shareholders did not commit to cover additional civil construction cost Both conditions can only be changed by explicit FAIR Council or shareholder decision Council Decision from the 13 th Council session on 7 November 2014 Decision XIII.7.1: The Council takes note of the Report by the FAIR Management on a delay of the schedule and an increase of costs of civil construction and possible de-scoping measures. The Council acknowledges and confirms its responsibility to finish the project according to the Modularized Start Version as described in the Convention.

Task assigned by the FAIR Council Boris Sharkov, Karlheinz Langanke20 Decision XV.0.1 The Council recalls the cost estimate as laid out in the Convention based on 2005 prices. Taking into account the indication of the Review Committee that the completion of the FAIR project will take longer than expected, the Council asks the Management to execute an up-to-date and critical analysis of the cost, the schedule, and the scope and to prepare different scenarios based on (1) a set cost cap or (2) the completion of the full scientific scope of the Modularised Start Version.

Scenarios based on set cost cap Criteria for the selection of scenarios to be examined: technical feasibility reasonable re-planning efforts significant saving potential Criteria for strategy proposal in case of cost cap: preservation of scientific uniqueness of the facility for a broad, cutting-edge research program realization as fast as possible significant saving potential 2116th Council – Item 4a – June 30 / July 1, 2015 Boris Sharkov, Karlheinz Langanke

Scenarios (Part 1) Scenario 1:Without CBM (Module 1)  Scientific consequence: Omission of experiments HADES and CBM  Re-planning effort: small  Saving potential: ca. 50 M€ Scenario 2:Without Module 2 (Super-FRS, R3B, ILIMA, HISPEC/DESPEC, MATS, LASPEC, EXL)  Scientific consequence: Omission of the full NUSTAR program  Re-planning effort: Replanning required  Saving potential: ca. 312 M€ Scenario 3:Without Module 3 (p-linac, pbar-Target, CR, HESR, PANDA, ILIMA, SPARC)  Scientific consequence: Omission of PANDA, massive impairment of SPARC/APPA, NUSTAR (ILIMA and EXL) through omission of the CR und HESR rings  Re-planning effort: significant  Saving potential: ca. 324 M€ 2216th Council – Item 4a – June 30 / July 1, 2015 Boris Sharkov, Karlheinz Langanke

FAIR Modularised Start Version APPA CBM NUSTAR PANDA Experiments M0: SIS100 M1: CBM,APPA M2: NUSTAR M3: PANDA, APPA, NUSTAR M0 M1 M2 M3 Science with the MSV Boris Sharkov, Karlheinz Langanke23

Scenarios (Part 2) Scenario 4:Like Scenario 3 but keeping the CR  Scientific consequence: Omission of PANDA, massive impairment of SPARC/APPA through omission of HESR, impairments for NUSTAR (part of EXL)  Re-planning effort: moderate  Saving potential: ca. 220 M€ Scenario 5:Like Scenario 3 but keeping both CR and HESR (--> 22)  Scientific consequence: Preservation of scientific instrumentation for APPA (SPARC) and NUSTAR (ILIMA, EXL), Staging of physics programs with antiprotons including PANDA is possible since the HESR is included in this scenario  Re-planning effort: moderate  Saving potential: ca. 103 Mio. €. 2416th Council – Item 4a – June 30 / July 1, 2015 Boris Sharkov, Karlheinz Langanke

FAIR Modularised Start Version APPA CBM NUSTAR PANDA Experiments M0: SIS100 M1: CBM,APPA M2: NUSTAR M3: PANDA, APPA, NUSTAR M0 M1 M2 M3 Science with the MSV Boris Sharkov, Karlheinz Langanke25

Observations and Recommendations by SC 1.The Scientific Councils (SCs) reconfirm their earlier assessment that all four FAIR pillars - despite the delay of the project - carry compelling scientific cases with unique discovery potential. 2.Therefore, the SCs consider the FAIR MSV to offer the best science to cost ratio for the FAIR project. 3.The SCs carefully took into account the recommendations by the International Review Committee chaired by Rolf Heuer. The SCs consider the ordering of the experiments as the result of a resource- loaded rather than a purely scientific evaluation.

Observations and Recommendations II 4.In case it is needed to consider scenarios with a - so far unknown - cost cap, the SCs consider the 22 scenario as a viable option, provided that a strategy is developed to realize an antiproton program by The 22 proposal requires an immediate start of the project. Nevertheless, on a six months time-scale, corresponding resource loaded plans should be presented for the 22 scenario with a staged antiproton program. 6.The SCs urge the management to investigate all potentials for cost savings. These discussions should involve representatives from civil construction, accelerators and experiments.

Observations and Recommendations III 7.The SCs congratulate the FAIR collaborations for the continuous progress achieved towards the realization of the experiments. 8.The SCs consider the planned intermediate research program of high importance and quality which also keeps the scientific communities alive. 9.The SCs welcome the steps taken by the Management towards setting up an adequate project organization.

High Level Schedule of the MSV Boris Sharkov, Karlheinz Langanke29 8

Council Decision XVI.4.1 ( July 1, 2015 ) The Council takes note of the scenarios and recognises that a funding gap of 350 M€ exists (in 2022 prices) for the realisation of the MSV. Boris Sharkov, Karlheinz Langanke30 With the aim not to lose more time the Council asks the management to start immediately with the planning of the construction of the facility in a staged approach. The Council will try to find measures to close the funding gap for the realisation of the MSV. A decision on the funding baseline and the respective scope will be taken at the extraordinary meeting on the 29th September 2015.

Boris Sharkov, Karlheinz Langanke31 Decision XVII.6.1 (1)The Council confirms the stepwise approach to the realization of the FAIR project outlined in the Convention, Article 5 (6), starting with the Modularized Start Version (MSV), according to Article 5 (2) of the Convention. (2) The Council states that the target completion date for the Modularized Start Version should be not later than (3) The Council asks the FAIR Management to provide for approval by the Council a suitable document summarizing the reasons for the delay in realization of FAIR and the respective cost increases as well as a reasoned proposal of the MSV construction time scale and financing schedule, in a manner which is communicable to decision makers in all partner countries. (4) Taking into account the prolonged time schedule for the realization of the FAIR Modularized Start Version and the concomitant cost increases, a staged approach is agreed upon for speeding up the start of experiments. (5) The Council asks the Management to prepare for a detailed review of the progress and financial status of the FAIR project not later than 2019.

Boris Sharkov, Karlheinz Langanke32 (6) The Council defines the value of 1,262 M€ (2005 prices) as cost cap for the FAIR Modularized Start Version, not including the exceptional additional site- related costs of 95 M€ (2005 prices), already borne by Germany. (7) In order to enable the Management to expedite contracting of design works, civil construction, and accelerator and detector component construction for all four FAIR experimental areas in the framework of the MSV, the Council asks the Shareholders and the Associated Partner to assure the necessary additional funding as soon as possible (cf. Table 1). Commitments to cover additional 158 M€ (2005 prices) have to be made at the latest by the end of the first half of 2016; commitments to cover another 90 M€ (2005 prices) will have to be made by This additional funding will be required from 2019 onwards for the completion of the MSV, and is to be provided in principle as cash contribution. (8) The Council asks the Management to continuously look for any cost saving measures. (9) The Council asks the Management to continue its effort to attract additional Shareholders to the project who will be able to bring in additional intellectual and financial resources for the project.

Boris Sharkov, Karlheinz Langanke33 (10) The Council takes note that with this approach, a re-definition of the already planned in-kind contributions will not be necessary. (11) The Council understands the necessity that all parties involved do their utmost to continue to provide all experimental groups of the MSV experiments with adequate funding for R&D and detector construction to avoid negative consequences for the experiments due to the delays and the construction staging.

GSI Helmholtzzentrum für Schwerionenforschung GmbH CBM nuclear matter at high densities NUSTAR neutron-rich nuclei APPA ions in extreme electro- magnetic fields PANDA hadron physics with antiprotons 34 4 Research Pillars

GSI Helmholtzzentrum für Schwerionenforschung GmbH Workshop, MEPHI, O. Kester Thanks for your attention 35

Boris Sharkov36 Plasma FAIR/ GSI Quo vadis ? What to do ?