V. Korbel, DESYECFA-DESY Workshop, NIKHEF1 Readout for the minical and Tile-HCAL prototype, 15’ The VFE RO: The light signals Photo-detectors 1) APD’s.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
R&D for ECAL VFE technology prototype -Gerard Bohner -Jacques Lecoq -Samuel Manen LPC Clermond-Ferrand, Fr -Christophe de La Taille -Julien Fleury -Gisèle.
An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
18/05/2015 Calice meeting Prague Status Report on ADC LPC ILC Group.
Some aspects of the DAQ for the Tile-HCAL Prototype Volker Korbel, DESY, for the CALICE/Tile-HCAL group Montpellier, France, November 2003 Hadr.
The Tile-HCAL Physics Prototype; concept, status, time plan Volker Korbel, DESY, for the CALICE Coll. Montpellier, France, November 2003 Groups involved:
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Fiber-Optic Communications
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
1 H-Cal front-end ASIC Status LAL Orsay J. Fleury, C. de la Taille, G. Martin, L. Raux.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
V. Korbel, DESY , ECFA-DESY, Prague 1 New Results and further Plans for the TESLA Tile HCAL What did we establish so far ? Found: scintillators.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Next generation HCAL prototype Felix Sefkow EUDET electronics meeting UCL, December 5, 2006.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
VFE & PCB Status & schedule of production Presented by Julien Fleury Christophe de La Taille, Julien Fleury, Gisèle Martin-Chassard.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
SKIROC status Calice meeting – Kobe – 10/05/2007.
JRA3 Institute of Physics ASCR Prague
PreShower Characterisations
KLOE II Inner Tracker FEE
ECAL front-end electronic status
ASIC PMm2 Pierre BARRILLON, Sylvie BLIN, Selma CONFORTI,
CTA-LST meeting February 2015
CALICE COLLABORATION LPC Clermont LAL Orsay Samuel MANEN Julien FLEURY
A First Look J. Pilcher 12-Mar-2004
Electronics for the E-CAL physics prototype
Christophe de La Taille, Julien Fleury, Gisèle Martin-Chassard
Christophe de La Taille, Julien Fleury, Gisèle Martin-Chassard
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
STATUS OF SKIROC and ECAL FE PCB
BESIII EMC electronics
SKIROC status Calice meeting – Kobe – 10/05/2007.
On behalf of CEPC calorimeter working group
E. Garutti - Main Meeting
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Scintillator HCal Prototype
Presented by T. Suomijärvi
Presentation transcript:

V. Korbel, DESYECFA-DESY Workshop, NIKHEF1 Readout for the minical and Tile-HCAL prototype, 15’ The VFE RO: The light signals Photo-detectors 1) APD’s (Hamamatsu, ) 2) Si-PM’s (MEPhI) 3) MA-PMs(Hamamatsu) 4) MRS-APD’s(Obninsk) Preamplifiers, shaper charge sensitive (ECAL-LAL, Minsk) voltage sensitive (Prague) the electrical signals 0-3Volt range, dyn. range 1-75 (100) MIPs/cell ns rise 150 ns (95%) buffering and multiplexing digitising calibration and monitoring minical : pre-prototype Tile-HCAL The different photodetectors front end electronics (VFE) time schedule, needs event format and DAQ (P.Daucey)

V. Korbel, DESYECFA-DESY Workshop, NIKHEF2 The light signals produced number of photons by MIP: ~ 150 ph/MIP/tile, loss in fibre-RO: ~20%, tile; = 1/3 cell 1 (absorber plate+tile) deposes ~24 MeV >> in a cell ~ 72 MeV maximal energy deposit/cell ~ 4.5 GeV (in rare tails) ratio maximum/MIP = 65

V. Korbel, DESYECFA-DESY Workshop, NIKHEF3 The photodetectors receive the light from the scintillator tiles of the sampling calorimeter. options studied are: -Si-APD's, with 3x3 to 4x4 mm 2 photo-cathodes, in arrays of individuals or matrix assembly, as in study at Hamamatsu, Japan and -Si-PM's, with 1x1 to 2x2 mm 2 photo-cathode, from MEPhI/PULSAR(Moscow), 576 >>> 1000 pix/mm 2 All systems are in still in development, no dedicated choice can be made at present. The photodetectors

V. Korbel, DESYECFA-DESY Workshop, NIKHEF4 Required gain for pre-amps, 2 options A) for APD’s: 150 photons/tile = 450 photons/cell, ~80% transmission, 80% photo-conversion efficiency: possible intrinsic gain ~ (to be verified) >>> e - / MIP= fC/cell conventional stable intrinsic gain ~ >>> e - / MIP= fC/cell slope/width of photodetector signal: ~ 2-5ns/20-30 ns width required dynamic range: 65! If MIP in cell channel 16 >>> 4.5 GeV: channel 3000, 12 bit ADC, ch 4096 = 3 V and >>>> ch 16 =12 mV preamp gain required: 12 mV/7.2 fC = 1.7 mV/fC 12 mV/1.8 fC = 6.8 mV/fC Resolution: 10 bit ADC: -4.5 MeV/bin 12 bit ADC, -optimal in range: ~ 1 MeV/bin

V. Korbel, DESYECFA-DESY Workshop, NIKHEF5 Required gain for preamps, 2 options B) For the Si-PM's: much less preamp gain is needed SiPM intrinsic gain is ~10 6 a VFE RO-board development is under way at MEPhI and PULSAR (both Moscow), based on the H1-PM preamps. They also look in an alternative pre-amp/shaper concept. more on the photodetectors and pre-amps can be found in: and....../DESY-Zeuthen_ pdf.

V. Korbel, DESYECFA-DESY Workshop, NIKHEF6 more on preamplifiers for APD’s CALICE-ECAL: prototype: ~10 mm 2 preamp chip, modified OPERA type for APD modifications specified and simulated in chip, design ready next week submission of modified design for prototypes 25 x18 ch. delivery in June Use in minical Summer 2003 Minsk/Protvino: 2 types tested with APD and MIP’s 10 preamps available 100 preamps in February 2003, design of 16 channel MPC prototype: (~ 8000 Euro needed??) Prague (I.Polak): voltage amplifier, (probably not optimal for APD’s??), signals seen in DESY test, signal/noise??? agreed to produce 16 channels PT end Febr development financed by Prague DESY trans-impedance type, tested with APD’s, mod. CMS-type, cheap !, P. Smirnov Test of all oreamps from above in minical tests when available in time. Decision on what to use in preprototype: October 2003

V. Korbel, DESYECFA-DESY Workshop, NIKHEF7 Electrical signals from the minical Noise, randoms cosmics LED-pulses CAMAC Read-Out, LC-2249A MA-PM as photodetector now up to 144 channels needed in summer 81 Si-PMs 27 APDs 3 MA-PMs (up to 48 channels)

V. Korbel, DESYECFA-DESY Workshop, NIKHEF8 More on photodetectors Hamamatsu,multianode PM,4  4mm 2 pixel Hamamatsu,APD, 5  5 mm 2 Hamamatsu,APD-array,1  1 mm 2 pixel MEPHI, Si-PM, 1  1 mm 2 pixel Detailed investigation of available photodetectors with 5  5 cm 2 scintillator tiles in test beams MIP peaks clearly separated from pedestals. satisfactory performance none yet tested in high field all will be used in minical to establish performance and get operation experience than decision which to use!! V sensitive pre-amp, Prague pre-amp from MEPhI PM pre-amp, DESY-H1 Q sensitive pre-amp, Minsk

V. Korbel, DESYECFA-DESY Workshop, NIKHEF9 The VFE-ROB-scheme Array of Photo detectors pulse shapers Sample & hold Multi plexer (analog) Trigger/ RO clock LED signals PIN diode for LED monitoring HV for Photo detectors sensitive preamps pedestals Online Gain/HV monitoring? cosmic beam

V. Korbel, DESYECFA-DESY Workshop, NIKHEF10 The Read-Out Boards (VFE-ROB’s) for prototype It is foreseen to place the photodetectors on the surface of a ROB (read-out board), as tight together as possible, on special sockets to be developed, about 108 (6 x 18) pieces on one board. For the Si-PMs probably 3-4 times more have to be placed on a ROB. About ROB's are needed for the Tile_HCAL prototype end ( ??? channels) The signals from the pre-amps, which have to deliver signals of 8mV/fC input charge, have to be shaped (shaping time ~ ns) and stored in sample and hold (S&H) pipelines for a time period of about 1-2 msec. Than a multiplexed read-out, clocked by the DAQ, will empty the pipelines.

V. Korbel, DESYECFA-DESY Workshop, NIKHEF11 Calibration on VFE-ROB’s Cosmic muon calibration: the FE boards should be permanently operational to allow, between test-beam pulses, continuos collection of the low rate cosmic muons penetrating the calorimeter, which are used for real time on-line calibration. They generate their own calibration triggers. Low rate process, for precise calibration of whole chain Preamp calibration: by charge injection, >> dynamic range linearity, high rate process, tests electronic chain only

V. Korbel, DESYECFA-DESY Workshop, NIKHEF12 Electronic calibration Polarisation (-200V) Diode Déclenchement Calibrage Chip VFE I calib LR C injection 6 circuits de calibrage opérant sur 18 diodes chacun Le premier PCB du prototype physique Studies with CALICE-ECAL chip

V. Korbel, DESYECFA-DESY Workshop, NIKHEF13 Photodetector monitoring on VFE-ROB’s LED monitoring: The ROB should also integrate a few light emitting diodes (LED's) with LED-light distribution by clear optical fibres. to all individual photodetectors for stability monitoring, and also to a few stable Si-photodiodes (stable against temperature and bias voltage fluctuations) to monitor the LED light output. The analogue signals of the LED monitoring photodiodes and the Si-PD’s (some?) have also to be amplified, shaped and stored in the same S&H pipeline. LED monitoring has to be triggered in the gaps between the test-beam pulses and during the read-out!

V. Korbel, DESYECFA-DESY Workshop, NIKHEF14 More on VFE-ROB duties The ROB has to integrate the active elements (chips, to be developed) and in tight package all the signal lines up to the S&H and multiplexer, the power lines for the individual photodetectors (~400V for the APD's, or ~30V for the Si-PM's), where each photodetectors operation voltage will be adjusted individually for equal gain on the level of ~0.1V. It is hoped, that we can profit considerably from the design of the ROB prototypes of the CALICE-ECAL at LAL/Orsay. Group strongly interested in taking over VFE and DAQ duties: DUBNA: (I. Golutvin, I. Tyapkin)

V. Korbel, DESYECFA-DESY Workshop, NIKHEF15 On chip Amp Vdc = -200V OPA DC block Detector Charge preampshaperTrack & hold channel architecture, chip ECAL >> HCAL LAL-Oray, F. Richard,dela Taille, offered to us to modify the ECAL-preamp/shaper chip for the requirements of the Tile-HCAL APD’s >>>>>

V. Korbel, DESYECFA-DESY Workshop, NIKHEF16 FLC_HCAL pinout Charge inputs Voltage outputs MUX output Package : CQFP64 64 pins FLC_HCAL chip 1,7mm 2,5mm 25/03/03, LAL pre-amp layout

V. Korbel, DESYECFA-DESY Workshop, NIKHEF17 LAL/Orsay studies for Tile-HCAL pre-amps simulation studies for linearity Linearity preamp Linearity shaper/buffer

V. Korbel, DESYECFA-DESY Workshop, NIKHEF18 LAL/Orsay studies for Tile-HCAL pre-amps output signal shapes Output signal shaper Output signal preamp

V. Korbel, DESYECFA-DESY Workshop, NIKHEF19 18 charge inputs/18 voltage outputs/1 MUX output Gain= 6.7mV/fc  450 fC max input charge (70 MIP) 2.8V dynamic range below 1% non-linearity 25/03/03, LAL FLC_HCAL characteristics, next steps DESY will order 25 of such prototype chips at the 7.April 2003 >>> 25 x 18 =450 preamp channels delivered in mid June 2003 DESY gets test-board from LAL line driver prepared to run 30 channels for APD-minical studies (July-September 2003) If prototype chips are ok, we have enough channels to equip the APD-cells ( , to be decided in May) of the prototype calorimeter!

V. Korbel, DESYECFA-DESY Workshop, NIKHEF20 Draft of conclusions from the DUBNA meeting We need: ~ 1000 RO-channels at beginning of 2004 for the 1m 3 prototype test --APD’s (Hamamatsu) and Si-PM’s (MEPhI) will be used --photodetectors and preamps have to be optimised soon! --The size of APD’s will be ~3x3 mm 2 the gain required was specified, the combined gain of APD and preamp should result in 2-8 fC/MIP, the electronic noise should be below 4-5 sigma of MIP, the capacity of the APD’s will be ~ 25 pF, the stability of the MIP signal should be in the range of 1%, shaping time has to fit to the minimum bunch distance (180 ns), dynamic range required between MIP(4 bit) and max. signal is >/~65

V. Korbel, DESYECFA-DESY Workshop, NIKHEF21 Draft of conclusions from the DUBNA meeting Due to the short time available we probably have to proceed in 2 stages: 1. Use CALICE-ECAL VFE board with minimal modifications keep 108 channels/board keep ECAL preamps, noise,shaping,... modify implementation/arrangement of photodetectors on board modify photodetector power supply add LED monitoring for all channels Design a versatile VFE concept allowing use of different competing elements (preamps, HV distribution, monitoring..) 3. When useful VFE boards available for first 1000 channel tests: and more experience gained, (probably year later) implement optimal preamps (capacity, noise, gain), shaping optimise power supply and individual adjustment optimise online LED stabilisation

V. Korbel, DESYECFA-DESY Workshop, NIKHEF22 The VFE-ROB-scheme, APDs Array of single APDs or matrices pulse shapers Sample & hold Multi plexer (analog) Trigger/ RO clock LED signals PIN diode for LED monitoring HV, V dV/V~10 -4 charge sensitive preamps pedestals Online/Offline Gain/HV monitoring? cosmic beam Charge injection DAC