TecnoCut PlateChanger Set Up /1 2009.01.09 videoconferenceG.Sirri - INFN Bologna1 HARDWARE (complete):  both glued / not glued emulsion setup  cabling.

Slides:



Advertisements
Similar presentations
Why to learn OSI reference Model? The answer is too simple that It tells us that how communication takes place between computers on internet but how??
Advertisements

Bern 13 Feb 2006 G. Sirri – INFN BO1 Scan back with dry objective G. Sirri for Bologna group Dry objective with correction collar: ZEISS LD Achroplan (code.
Photolithography Machine Control System Ben Conrad and Mark Edwards Projects in Computer Engineering II December 9, 2003.
Cristiano Bozza – European Emulsion Scanning Group – Nagoya Jan OPERA brick scanning by the European Scanning System.
High Speed Digital Systems Lab Spring/Winter 2010 Part A final presentation Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of.
CCNA 2 v3.1 Module 2.
Elliot Buller Luke Ciavonne Mehdi Mehrpartou Advisor: Dr. Steven Reising.
Hardware-In-The-Loop Testbed Team 186: Douglas Pence, Ken Gobin, Aaron Eaddy, Advisor Sung Yeul Park Department of Electrical and Computer Engineering,
1 Semester 2 Module 2 Introduction to Routers Yuda college of business James Chen
CISCO ROUTER.  The Cisco router IOS  Enhanced editing  Administrative functions  Hostnames  Banners  Passwords  Interface descriptions  Verifying.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Characterizing the Existing Network Designing and Supporting Computer Networks.
How Hardware and Software Work Together
BOLOGNA Scanning Lab INFN - Sezione di BOLOGNA Physics Dep. of Alma Mater Studiorum Università di Bologna M.Pozzato – Ankara – 09/04/02.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Verigy V93000 Service Training
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 6 Switch Configuration.
G.Sirri – INFN Bologna videconf Fiducial Mark Finding with ESS 1/6 VersionDateBinarySourceConfigNote zip same as 62 Recommended.
Input/ Output By Mohit Sehgal. What is Input/Output of a Computer? Connection with Machine Every machine has I/O (Like a function) In computing, input/output,
Status of the PCI Test Stand Hardware status: Three known working PTS’s: 2 at FNAL, 1 at UIUC. Korean group working on one, LBL has one running yet? Adapter.
G.Sirri – INFN Bologna videconf /14 Fiducial Mark Finding with ESS  Lateral Mark Finding [FlexMapX]: Recommended release 42b ( )
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
Home Theater Remote Date: May 16, 2008 Team: Bryan Follis, Mike Schmidt, Dan Grissom, Jesse Butler Advisor: Dr. David Klotzkin Final Presentation.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
Modem A Presentation Department of Computer Engineering,
LNGS 25 May 2005 G. Sirri – INFN BO1 Test of a dry objective with correction collar Dry objectives having an high numerical aperture give aberration when.
Ch.2 – Introduction to Routers
ChibiOS/RT Tools Setup A free embedded RTOS
DB-based DAQ monitoring and Physics analysis tools Emiliano Barbuto European Emulsion Group (LNGS May 2003)
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
Emulsion Gluing Bologna Group Outline: - Adhesive tape - PVC frames - Vacuum supports for emulsion - 2 nd gluing machine.
Bologna Report M. Pozzato on behalf of Bologna Group Cetara Meeting – 13/09/2010.
PLATE CHANGER for OIL microscopes Gabriele Sirri INFN Bologna for INFN Bologna and LNGS.
Status of European Scanning System (Bari, Bern, Bologna, Lyon, Napoli, Neuchatel, Roma, Salerno) The final fast version is ready and working up to 20 cm.
G.Sirri – INFN Bologna 1/19 Lateral X-ray marks finding with ESS  Goal: implementation of the lateral mark finding in the ESS software  First Test: Plate-to-plate.
G. Sirri - Bologna videoconf /9 Lateral X-rays with ESS  Goal: implementation of the lateral mark finding in the ESS software  test version.
What Is ISDN?.
Gluing machine (scanning at the edge…) G. Sirri for Bologna Group.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
POR:NATALIA RESTREPO BUSTAMANTE. hardware refers to all physical parts of a computer system; its components are: electrical, electronic, electromechanical.
Berkeley Nucleonics Instrumentation Since 1963…. Management Team David Brown, President 15 Years, BA Management Mel Brown, Director of Finance 45 Years,
Ch.2 – Introduction to Routers CCNA 2 version 3.0 Rick Graziani Cabrillo College.
Digital Electronics and Computer Interfacing Tim Mewes 5. Computer Interfacing – DAQ cards.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
I.Kreslo / LHEP BERN1 Status of scanning in Bern HW status SW status pi/mu separation ( PSI 2004 ) vertex search (CERN 2004)
European Scanning System: status report. DRY Fill factor 92.4 ± 1.6 % DB-driven Scan-back and Total Scan in Bari OIL Fill factor 93.1 ± 1.2 % Brick #8,
Emulsion handling tools for plate changer oil solution N. D’Ambrosio (LNGS Group) LNGS May 2006.
SIDE SCAN HARDWARE CONFIGURATION
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
SIDE SCAN HARDWARE CONFIGURATION HYPACK Connection Block Diagram GPS, single beam and tide data go into HYPACK ® SURVEY. Sidescan (with optional.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
FlowArm PLTW Programming
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
1 ALARMLINC. 2 OVERVIEW Expanding Situational AwarenessOVERVIEW.
Modem. Introduction: A modem [Modulator -Demodulator] is a device. Data communication means transmitting digital information form one computer to other.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 2 v3.1 Module 2 Introduction to Routers.
Intro to USB-6009 DAQ.
Vinculum II Development Modules
Tape Drive Testing.
CCNA 3 v3.1 Module 6 Switch Configuration
FlowArm PLTW Programming
Key Terms By: Kelly, Jackson, & Merle
HIC testing software
Modem A Presentation Department of Computer Engineering,
Chapter 5: Switch Configuration
Gluing machine A semi automatic machine to glue emulsion plate on adhesive tape (as done by Japanese colleagues) was realized and delivered to Bologna.
1/17/2019.
Lateral X-rays with ESS
Lateral Marks with ESS A test version is available in since the end of September. Several laboratories.
Presentation transcript:

TecnoCut PlateChanger Set Up / videoconferenceG.Sirri - INFN Bologna1 HARDWARE (complete):  both glued / not glued emulsion setup  cabling of the interface [PlateChanger - LNGS level adapter board – NI7344]  cabling and pneumatic connection of the air/vacuum device for the glass window  cabling and pneumatic connection of the oil dispenser  oil dispenser mechanical support (new design by LNGS) additional tools:  frame press to help vacuum on the glass window (new design by LNGS)  compressed air nozzle to help emulsion detachment from the glass window (electrovalve, cabling, pneumatic connection and mechanical support)  compressed air to help emulsion detachment from the cleaning tool surface (electrovalve, cabling, pneumatic connection)  proximity switch to inhibit microscope movements when platechanger arm is over the glass window (switch, cabling, mechanical support) Red: what’s new after last comunication ( )

TecnoCut PlateChanger Set Up / LNGSG.Sirri - INFN Bologna2 FIRMWARE (complete - version 4):  platechanger state can be read outside for synchronization with the software  emulsion counter is removed  an additional input signal is provided to manage the (un)load of the last emulsion plate  provide compressed air to help the emulsion detachment from the cleaning tool surface  provide vacuum when the arm put the emulsion on the cleaning tool surface SOFTWARE (minimal software available):  Basic Digital IO interface complete (through new module FlexStage5)  Scanning process integrated with oil distribution (customized VertigoScan7)  Fiducial Mark Finding integrated with oil distribution (new FlexMapX)  macros to manage the Load/Unload/OilDispense jobs (new module TCPlateChanger) Synchronization with the platechanger to improve reliability at startup, after failures, … (manage problems like: “load” command received when “unload” is expected, restart after software or platechanger crashes, … )

TecnoCut PlateChanger Set Up / LNGSG.Sirri - INFN Bologna3 TEST AND MEASURE:  Full brick load/unload skipping oil (mark finding, area scanning, …) : ok (glued/not glued)  Scanback and totalscan of some bricks (oil distribution included) : (after tuning of mark finding and platechanger alignment tools) not glued: too lateral mark finding failures (focus problems outside the vacuum channel due to oil) glued: ok … but frequent cleaning of separators, suckers, surfaces, …

Conclusions videoconferenceG.Sirri - INFN Bologna4 The hardware and firmware set up can be considered closed for what concerns the requested functionalities. Mark finding improvements useful for not glued emulsions (in progress): manage and/or trace the lateral mark “clone problem” focusing before lateral mark search Now, standard measures are necessary to verify the reliability and stability of the system.