Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Manufacturing Processes lab I Running a lathe machine
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Unit 206: Domestic hot water systems
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
1 HVACR316 – Piping Tubing and Piping. 2 Purposes of Tubing and Piping Provides a path for refrigerant to take Provides a means to return oil to the compressor.
Adjustable Head Strap Instructions Step 1: To adjust the head strap hold goggle as above.
Second Peer Review for New MGI Valves for NSTX-U (Update on Valve Testing) R. Raman, et al. October 29,
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Dial Caliper. The dial Caliper has seven main components: a slide scale, lock screw, thumb adjustment wheel, measuring jaws (inside & out), dial with.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
TUBING AND PIPING.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Notes and questions from a first integration in Catania of the DOM top hemisphere
OU’s 454 reagent cooling system To extend the life of the GS20 reagents for longer than 42 flows, we found it necessary to develop an apparatus for reagent.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Hans Jostlein, Lar Workshop, November 4, Liquid Argon TPC High Voltage Issues.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Installation. Indoor Unit Installation Typical Installation.
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
HV Feedthrough Tests for the LBNE Meeting Status of R&D 8/18/2015HV Feed for BNL Meeting1 Hans Jostlein.
How Big is the Earth A glimpse at the earth’s size and atmosphere. By Vincent Sapone 1.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
TPC Design Concept: From MicroBooNE to LAr20
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
Argontube Detector design Laffranchi Marco, Meregaglia Anselmo, Messina Marcello, Rubbia Andre’ Bern,
Every drawing should include all the information… however, it is not always clear unless you know what you are seeing. L. Tatro CHSE 2011.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Drum brake components • The brake drum
Car A and B leave a town at the same time. Car A heads due north at a rate of 75km/hr and car B heads due east at a rate of 80 km/hr. How fast is the.
Concept Design for LBNF Far detector (LAr single phase)
Ions in LAPD Can we Observe Them in Long Bo ? 3/6/2016 Ions in LAPD Sarah Lockwitz and Hans Jostlein, Fermilab 1 Sarah Lockwitz and Hans Jostlein Fermilab.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
35ton and LAPD cryostats and future DUNE detector development.
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
HV Feedthrough Tests for the LBNE Meeting Status of R&D 6/26/2016HV Feed for BNL Meeting1 Hans Jostlein.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
35 Ton Membrane Cryostat Temperature Profiler Proposal Hans Jostlein Fermilab 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 1.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
CANTY QUICKPORTS™ “How they work”
Installation of the T600 at Fermilab
Warm structure requirements :
V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004
TPC Support and Constraint TPC Support
Voltage tap layout and quench antenna options for the long QXF magnet
Assembly instructions for M-K all bolt together hoppercone kit.
Oil-tight MV fuse CEF-OT with TPC bushings
PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM
LARP Phase II Secondary Collimator RC-1
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Liquid Argon TPC High Voltage Issues
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Presentation transcript:

Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1

Requested Design Changes from 4/4/ /19/2015Long Bo FT and Flanges2 Based on Comments and Requirements from the April 4 presentation: 1.Increase the distance between HV Feed and TPC 1.Increase the distance between central purity monitor and TPC / HV feed 2.Raise the HV FT flange above the insulation atop the big 33 ½”) flange to diminish icing danger

Implementation of new Design Requirements 12/19/2015Long Bo FT and Flanges3 Move the TPC away from the Tank Center. This frees up radial space for the purity monitor and the HV Feed Raise the TPC to the same elevation as the central purity monitor, maintaining the same minimum LAr depth.

12/19/2015Long Bo FT and Flanges4

12/19/2015Long Bo FT and Flanges5

12/19/2015Long Bo FT and Flanges6

Additional Design Features: Bubbles 12/19/2015Long Bo FT and Flanges7 Analyze bubble paths and Bubble Size Control Add a tight fitting seal at the bottom of the PE sleeve. It will sea when cold Conical bottom end of the PE sleeve to prevent bubble aggregation Venting of the space surrounding the 7/8” center tube to its inside Venting the 7/8 tube inside through tiny holes in the contact cup at the bottom. Hole size 0.2 mm requires 2 cm LAr head; we will use 0.5 mm or larger.

12/19/2015Long Bo FT and Flanges8

Additional Design Features: Purging 12/19/2015Long Bo FT and Flanges9 Purge the space surrounding the PE sleeve into the GAr space at the top. Purge the GAr space near the top into an external purge line Purge the GAr space near the TPC Signal Feedthrough into an external purge line

New Feedthrough Design New Features: 1.Top Flange raised above the top insulation 2.Bubble stop insert at bottom of PE Sleeve (See later slide) 3.Inverted cup/ spring contact arrangement (see later slide) 4.Extended to great depth to avoid having an insulated support 5.Bubble and purge management (see later slide) 12/19/2015Long Bo FT and Flanges10

Additional Design Features: HV Contact Area 12/19/2015Long Bo FT and Flanges11 In order to minimize the TPC assembly diameter, thus maximizing the stand-off distances of HV FT and Purity monitor, We invert the usual arrangement: The spring loaded finger is attached to the TPC cathode HV tubing, while the (inverted) cup is welded to the HV FT center tube. This change turns out useful and effective for bubble control (see previous slide)

12/19/2015Long Bo FT and Flanges12

Additional Design Features: Windows 12/19/2015Long Bo FT and Flanges13 We will have two windows, both existing: An 8” CF window and a 6” CF window. These will help during HV FT installation

12/19/2015Long Bo FT and Flanges14

12/19/2015Long Bo FT and Flanges15

12/19/2015Long Bo FT and Flanges16

12/19/2015Long Bo FT and Flanges17 Making the Long Bo High Voltage Fedthrough Cutting grooves into the PE:

12/19/2015Long Bo FT and Flanges18 Making the Long Bo High Voltage Fedthrough Cutting grooves into the PE:

12/19/2015Long Bo FT and Flanges19 Making the Long Bo High Voltage Fedthrough Cutting grooves into the PE:

12/19/2015Long Bo FT and Flanges20

12/19/2015Long Bo FT and Flanges21

12/19/2015Long Bo FT and Flanges22