Cobb County Department of Transportation

Slides:



Advertisements
Similar presentations
Chattanooga CCTV Early Deployment
Advertisements

Ft. Lauderdale Region Counties: Broward.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Intelligent Transportation Systems GDOT ITS Concept of Operations Presentation to ITS GA June 28, 2007.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
Presented by: SAGE KAMIYA, P.E., PTOE
The Iceberg $17 Million $2 Million. RECOMMENDATIONS.
Our Future – A Sustainable UCSF. Sustainability at UCSF is balancing financial resources with institutional needs while considering impacts on society.
Sustainability and the Breuer Building Sustainability and the Breuer Building The Cleveland Green Building Coalition
DASNY MWBE FORUM The event that will change your business CUNY & CUCF + MWBE = Partners in Success OCTOBER ,
Energizing Brownfield Projects Terri Smith Environmental Liability Management, Inc.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
Wong Strauch Architects Denver Advisory Board Presentation Current & Recent Projects.
Leadership in Energy and Environmental Design for Existing Buildings (LEED-EB): Operations and Maintenance Sustainability Activities by the BUILDING OCCUPANT.
Bethany Ramey Trombley Architect, LEED AP ID+C September 10, 2010 UT’s Hearst Student Media Center LEED GOLD Renovation What Starts Here Changes The World.
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
Catherine Elvert City of Palo Alto Utilities Communications Manager.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
PROJECT HIGHLIGHTS Energy efficiency is a key feature of the design of Reagan Education Center. The heating, cooling, and electrical lighting systems exceed.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
City of Brisbane Open Space & Ecology Committee April 27, 2006 Baylands EIR Scoping.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Outline Project Background ITS Architecture Overview GVMC ITS Architecture Deployment Plan.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
ENVELOPE. LIGHTING.
Metro Atlanta Traffic Incident Management “Strategic Vision Update” Presented by Marvin Woodward TIME Quarterly Meeting January 23, 2007.
HERO UNIT Training Module Emergency Services Coordination Coordination.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
Handbook for Developing a Transportation Management Center Operations Manual Sponsored by the TMC Pooled-Fund Study Single.
Georgia’s Intelligent Transportation System
Georgia Association of MPOs November 29, 2012 North Augusta Park and Ride Project.
Welcome 2011 California Statewide Medical and Health Exercise.
1 Transportation Systems Management & Operations A New Paradigm for the 21 st Century Transportation Department Group 3 3 Notches Above the Rest.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
Colorado Front Range Trail Corridor Plan Colorado Front Range Trail Corridor Plan.
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Sustainable DC sustainabledc.org. DC is a Sustainable Leader 230+ LEED certified buildings; 300+ ENERGY STAR®District Government buying 100% green powerLargest.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
Maricopa Association of Governments (MAG) February 5, 2003.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
Avondale City Center & American Sports Centers Amendment No. 2 Sports Facility Construction City Council January 4, 2010.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
5 Keys Accelerate your public sector sales with data, predictive analytics and workflow RUSS MANN, CEO OF ONVIA.
Design – BIM – Build – Operate
Transportation Engineering Business Development Workshop Department M
AIDS Committee of Newfoundland and Labrador
I-280 Corridor Study and I-280/Winchester Blvd Project
Mobility Choice Blueprint
Panama City – Bay County International Airport Project Update
PITT COUNTY SOLID WASTE & RECYCLING
Designers’ Manual Overview and Chapter Contents
CAPITAL PROGRAM OVERVIEW
Florida Transportation Commission FY 2009
Regional & City of Becker Feasibility Studies
2008 UC/CSU/CC Sustainability Conference August 1, 2008
Right of Way Certification
Q2 Updates on 2019 Board Priorities
Q2 Updates on 2019 Board Priorities
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Cobb County Department of Transportation Regional Transportation Management Center

Genesis Joe Fletcher, Traffic Signal Systems Manager, identified a need to build a facility to serve the County’s current and future transportation management functions. This vision was pursued by combining different funding sources. Provide a dedicated resource to replace the existing one-room facility to serve the County’s transportation needs for the next 20 years

Existing Cobb TMC

Functions of TMC Signal Operations Management Camera Surveillance Information Sharing Traffic Data Collection Incident Management Alternate Emergency Management Site

Facility Concept Modeled after TDOT Facility in Nashville Site Visits and Discussion

TDOT Nashville

Design Consultant Selection Good Proposals from Two Firms Gresham Smith and Partners URS

Early Coordination / Input Met with Agency Reps Fire Public Safety 911 Cobb Emergency Management Center (EMC) Property Management GRTA GDOT FHWA Others

Concept Design On Site of Existing Outdated Building 24,000 S.F., 3 Story Facility Basement – Field Operations/Incident Management First Floor – Operations Room Including 9 Consoles and Support Staff Second Floor – Support Staff

Concept Development Visited Several TMC’s in the Metro Area: Gwinnett County City of Atlanta GDOT TMC

Existing Facility

Proposed Facility

Leadership in Energy and Environmental Design (LEED) Decision made by Chairman to Pursue LEED Certification Silver Certification Targeted Construction Waste Diversion Recycled Materials No Irrigation/Low Maintenance Landscaping Reduction in Water Use Waterless Urinals Low-Flow Fixtures ETC.

Design Process Design Contract Executed Dec., 2006 Design Finalized Feb., 2009

Cost Estimates Consultant Estimates - $6 Mill.+ Independent Contractor Cost Estimate – $6 Mill.+

Contractor Selection Process Construction Management at Risk Desirable But Not Allowed Under Current Laws Governing GDOT Traditional Low Bid 8 Submitted Bids Low Bid - $4.4 Mil. – Hogan Construction

Schedule Demolition Started on June 15, 2009 Completion Slated for April of 2010 Building Occupation May 2010

Current Progress

Questions