FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.

Similar presentations


Presentation on theme: "FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager."— Presentation transcript:

1 FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager

2 Outline  RTMC and Related Projects  Future ITS Projects

3 RTMC and Related Projects  I-75 Collier & Lee Counties FMS and Regional Transportation Management Center (RTMC) DB FPN: 416412-1, 416413-1, 414733-1 Under Construction (NTP Jan. 2, 2006) FMS  79 CCTV cameras, 111 microwave detectors, 26 dynamic message signs and 2 roadway weather information system units  Safety barrier cable system ITS improvements  ~98 miles of fiber cable, Ethernet communications  Video wall and integration of all control center and field devices RTMC  Located in rest area off of I-75 and Daniels Parkway  Multiple agencies: FDOT FMS Operations, FDOT MCCO, FHP Dispatch and FHP District  Building construction is almost complete Completion of the Entire Project: Estimated end of this Summer

4 SouthWest Interagency Facility for Transportation (SWIFT) SunGuide™ Center

5 SWIFT SunGuide™ Center

6

7

8 RTMC and Related Projects  SWIFT SunGuide™ Center Facilities Management Contract FPN: N/A Contract to be Advertised: April 2008 Building Management Support Services Contract Project Highlights:  Provides for general maintenance and services for SWIFT SunGuide™ Center including: Air conditioning/heating Elevator and machine room equipment Janitorial services Pest control services Lawn maintenance Fire alarm monitoring and maintenance Security services

9 Future ITS Projects  Charlotte County I-75 FMS Design-Build Construction FPN: 414738-1 Letting Date: Scheduled November 2008 Project Highlights  Extension of the Lee-Collier FMS based on Conceptual ITS Plan for Charlotte County  Includes: Finalize design based on Preliminary Plans Package Fiber optic communication network deployment CCTV camera system (26) DMS system (10) HAR system RWIS Vehicle detection system (32) Integration at the RTMC

10 Future ITS Projects  Manatee County ATMS Design-Build Construction FPN: 416119-1 Letting Date: June 2008 Project Highlights  Finalize design based on Preliminary Plans Package  Construction of ATMS  Upgrade will include: New central hardware and software New controllers and cabinets at 143 signalized intersections 40 CCTV cameras  Existing communications upgraded to fiber with Ethernet communications  Integration at the TMC including video wall, consoles, work stations, and all other ITS equipment

11 Future ITS Projects  Sarasota County ATMS Construction FPN: 420974-1 & 420974-2 New Project – Transportation Regional Incentive Program (TRIP) Growth Management Funds Upgrade Existing Signal System to be Compatible with Manatee County ATMS Requirements Construction Letting to be Determined by Sarasota County County Hiring System Manager

12 Future ITS Projects  City of Winter Haven ATMS Design-Build Construction FPN: 408043-2 Letting Date: March 2009 Construction Funding: 2010/2011  City will advance funds to start construction in Fiscal Year 08/09 Project Highlights  Finalize design based on Preliminary Plans Package  Construction of ATMS  Upgrade will include: New central hardware and software New controllers and cabinets at 48 signalized intersections 15 CCTV cameras  Existing communications upgraded to fiber with Ethernet communications  Integration at the TMC including video wall, consoles, work stations, and all other ITS equipment

13 Questions? Chris Birosak FDOT District 1 (863) 519-2507 Chris.Birosak@dot.state.fl.us