AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.

Slides:



Advertisements
Similar presentations
P ROJECT S TATUS S UMMARY. Insert Date Presentation Title Goes Here Sample Project Status/Schedule Summaries In addition to managing a project plan in.
Advertisements

Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
P ROJECT S TATUS S UMMARY. Insert Date Presentation Title Goes Here Sample Project Status/Schedule Summaries In addition to managing a project plan in.
SDM 2012 Student Paper Awards Rob Taylor 10/4/2011.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Senior Design 1 Project Android Pilot Nation Stellar Sea Lions Team –Andrew Olivier –Jordan Fryer –Karen Echon –Jacob Hahn University of Portland School.
Measuring What Matters November 7 th Agenda Review and update of tasks and timeline Review and update of tasks and timeline Role of RTF Role of.
Texas Nodal 1 Nodal Telemetry Outreach and Recent Changes to Focused Input Testing (FIT) NATF Sep 29, 2009 Stacy Bridges, ERCOT.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
Project Name Delete this tip note box: To estimate the length of your presentation multiply each slide by 3 minutes; this gives you the worst case.
QAA Summative Review Staff Briefing Leeds College of Art 8 September 2010.
AGS RSVP Weekly Meeting P. Pile 18 November 2004 AGS RSVP Weekly Meeting, 18 Nov 2004 Useful Links: RSVP Project : C-AD AGS Project:
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
July 9, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
AGS RSVP Weekly Meeting P. Pile 14 Apr 2005 AGS RSVP Weekly Meeting 14 Apr 2005 Useful Links: RSVP Project : C-AD.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Mu2e Cost and Schedule Ron Ray Mu2e Project manager Fermilab PAC Meeting November 3-4, 2008.
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
1 Project Update and Summary of Project Priority List (PPL) Activity May 14, 2015.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
AGS RSVP Weekly Meeting P. Pile 17 Mar 2005 AGS RSVP Weekly Meeting 17 Mar 2005 Useful Links: RSVP Project : C-AD.
1 RSVP Project Director’s Review with Laboratory Oversight Group Attendance Jan 2005 WBS 1.4.5, AGS Project Office (and WBS Beam Development)
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 Project Update and Summary of Project Priority List (PPL) Activity June 11, 2015.
BNL/AGS RSVP Upgrades Project WBS 1.4 – Breakout Session Rare Symmetry Violating Processes Preliminary Baseline Review Brookhaven National Laboratory 6-8.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
AGS RSVP Weekly Meeting P. Pile 30 December 2004 AGS RSVP Weekly Meeting 30 Dec 2004 Useful Links: RSVP Project :
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
1 RSVP Cost and Schedule Review 9 December 2004 AGS Upgrades Philip Pile WBS 1.4 Project Manager.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
AGS RSVP Weekly Meeting P. Pile 16 December 2004 AGS RSVP Weekly Meeting 16 Dec 2004 Useful Links: RSVP Project :
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
NOAA Fisheries Update MAFAC Meeting Paul Doremus DAA for Operations September 23, 2014.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting December 11, 2008 Dean. Hoffer / Elaine McCluskey.
AGS RSVP Weekly Meeting P. Pile 10 Feb 2005 AGS RSVP Weekly Meeting 10 Feb 2005 Useful Links: RSVP Project : C-AD.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
AGS RSVP Weekly Meeting P. Pile 10 Mar 2005 AGS RSVP Weekly Meeting 10 Mar 2005 Useful Links: RSVP Project : C-AD.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
The current status report for IEEE 3D Based Medical Application WG(P /2/3/4) May 19, 2015 Chair: Young Lae Moon, Chosun University Hospital Secretary:
DOE Mini-Review Summary and Management Updates Mark Palmer Fermilab March 15, 2013.
Business Development Working Group Meeting
Introductory Remarks and Meeting Goals
HITSP 2009 TC Timeline Overview
Status of the Planning Working Group’s (PWG) Efforts
SCHEDULE Nov 1st - Assembly Table Complete
Proposed Bay TMDL Schedule
Japan proposal on schedule
Project Kickoff Meeting
Francesco Forti University and INFN, Pisa
Internet Access Control Project Status
Japan proposal on schedule
[Project Name] Objective Benefit Accomplishments Commentary
This Presentation Pack is brought to you by
<month year> doc.: IEEE ptc November 2012
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE P Wireless RANs Date:
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Presentation transcript:

AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office Agenda –Guidance and Upcoming reviews (Pile) –Update on AGS/BOOSTER WBS cost scrubbing & short term spending plan (Brown) –Update on beam development plan (Ahrens) –Status of resource loaded schedules and short term spending plan for Switchyard (Pendzick)

AGS RSVP Weekly Meeting P. Pile 2 December 2004 Preliminary Guidance – our plan (subject to change – we have not yet received guidance from Willis/Kotcher as result of 4-5 Nov AGS Review – no change since 18 Nov meeting) Continue cost scrubbing and schedule development Highest priority to AGS/BOOSTER WBS –Cost scrubbing, what can we postpone until operations phase? etc… –Schedule – in particular a plan to get the AGS/BOOSTER in shape for high intensity beam development --- by beginning of 3 rd year of construction? –Beam development plan that fits within constant effort RHIC budget scenario with 2 beams – i.e. figure on 80 hrs/week and 15 weeks/year Case 1: Beam development during entire 5 year construction period Case 2: Beam development beginning 3 rd year of construction The construction plan should be developed consistent with no beam development in first two years of the project (Case 2 above) –D-line decommissioned –C-Line available beginning of 3 rd year for tests –there’s a risk (small) that we may have to revert back to the original plan (Case 1).

AGS RSVP Weekly Meeting P. Pile 2 December 2004 MilestoneDateStatus, Comments Discussion of Baseline Expectations, Timeline with Experiments September 13Held MECO Magnet ReviewSun-Tue, Oct 10-12Held AGS ReviewThu-Fri, Nov 4-5Held Internal discussion of resource-loaded schedules (RLS) for all projects Thu, Dec 9Includes PO, NSF PM, ALD + experiments. One full day. Simulations & Backgrounds ReviewTue-Thu, Jan 11-13Set, reviewers assembled, held at NYU Initial review of RLS for all projectsTue-Thu, Jan 18-20Reviewed by LOG. Dates TBF. Reviews of other sub-projectsWeeks of Jan 24 – Feb 21Series of LOG-based reviews of RSVP sub-systems Draft versions of PMP, PEP, Conceptual Design Report completed Mon, Feb 14 Operations ReviewWeek of Mar 7 Project startup pre-reviewWeek of Mar 15Comprehensive preparatory review of full project, proposal Project startup reviewWeek of Apr 18Final project startup review, iteration of above. NSF review. Finalize documentation for May submission to NSF Week of Apr 25 Product submitted to NSF/NSBMon, May 2 next significant events AGS/Booster cost and schedule ~complete Case1 and Case2 beam development plans ~complete DRAFT Resource Loaded Schedule available Experiment WBS’s work-in- progress Roadmap to Resource Loaded Schedule understood, some cost scrubbing K0PI0 and MECO Experiment Simulations Review

AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004 Goals and expectations of the meeting: – This meeting is intended to provide the opportunity for an open, frank discussion of the projects' status and outlook – Status report of what is in place with regard to project planning for the three projects – The current confidence of the Project Managers in the estimates they have so far. – Project Managers' plans for how any missing or incomplete items will be tackled over the coming months. Agenda: (Orange Room, Physics, attendance by invitation) – 2 hours each: KOPIO (M. Marx), MECO (M. Hebert) and AGS (P. Pile) Detailed Guidance:

AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004

AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004

AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004

AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Detector Capabilities, Simulations and Backgrounds Review (11-13 Jan 2005 at NYU)

AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Detector Capabilities, Simulations and Backgrounds Review (11-13 Jan 2005 at NYU)

AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Simulation and Background Review Committee –Ed Blucher, University of Chicago –Martin Cooper, Los Alamos –Cy Hoffman, Los Alamos –Patty McBride, Fermilab –Jack Ritchie (Chair), University of Texas, Austin –Mike Shupe, University of Arizona –Bob Tschirhart, Fermilab –Koji Yoshimura, Osaka University Charge and Agenda: RSVP Detector Capabilities, Simulations and Backgrounds Review (11-13 Jan 2005 at NYU)

AGS RSVP Weekly Meeting P. Pile 2 December 2004 Next Meeting 16 Dec 2004 Agenda –TBD