1 RSVP Project Director’s Review with Laboratory Oversight Group Attendance 18-20 Jan 2005 WBS 1.4.5, AGS Project Office (and WBS 1.4.2.6 Beam Development)

Similar presentations


Presentation on theme: "1 RSVP Project Director’s Review with Laboratory Oversight Group Attendance 18-20 Jan 2005 WBS 1.4.5, AGS Project Office (and WBS 1.4.2.6 Beam Development)"— Presentation transcript:

1 1 RSVP Project Director’s Review with Laboratory Oversight Group Attendance 18-20 Jan 2005 WBS 1.4.5, AGS Project Office (and WBS 1.4.2.6 Beam Development) Philip Pile Collider-Accelerator Department 19 Jan 2005

2 2 NSF-DOE MOU NSF-DOE MOU signed 22 July 2004 – some relevant guidance contained in the MOU The AGS Project Office was created as a result of this MOU RSVP activities will not unfavorably impact RHIC research activities as determined by the DOE

3 3 NSF RSVP Project Organization JOINT OVERSIGHT GROUP NSF; DOE NP; DOE HEP; NSERC RSVP PROJECT DIRECTOR and DEPUTY W. Willis, J. Kotcher KOPIO WBS 1.2 M. Marx 1.4.2 Switchyard A. Pendzick 1.4.3 K0PI0 C. Pearson 1.4.4 MECO D. Phillips 1.4.5 Project Office 1.4.1 AGS Booster K. Brown AGS WBS 1.4 P. Pile/A. Pendzick Integrated Project Management Team Laboratory Oversight Group T. Kirk C-AD D. Lowenstein MECO WBS 1.3 M. Hebert BNL ALD HENP T. Kirk BNLDOEDOE BAO

4 4

5 5 AGS Project Office (2/2) RSVP Review Status Sheet

6 6

7 7 Beam Development (2/2) RSVP Review Status Sheet

8 8 Supplemental Information

9 9