Data Analysis Needs Assessment Improvement Plan Implement & Monitor ●Set annual goals ●Identify a strategy ●Set quarterly goals ●Determine interventions.

Slides:



Advertisements
Similar presentations
Non-Classroom Teacher Evaluation Guidelines. The single most influential component of an effective school is the individual teachers within that school.
Advertisements

Goals-Based Evaluation (GBE)
Title I Schoolwide Providing the Tools for Change Presented by Education Service Center Region XI February 2008.
Top ten non compliance findings from the Office for Exceptional Children from their Special Education Onsite Reviews.
1 Why is the Core important? To set high expectations – for all students – for educators To attend to the learning needs of students To break through the.
Using Targeted Interventions to Support School Improvement Presenter: Kathleen Smith Director Office of School Improvement.
REGIONAL PEER REVIEW PANELS (PRP) August Peer Review Panel: Background  As a requirement of the ESEA waiver, ODE must establish a process to ensure.
Welcome What’s a pilot?. What’s the purpose of the pilot? Support teachers and administrators with the new evaluation system as we learn together about.
PDC Procedures – Individual Growth Action Plan The Individual Growth Action Plan (IGAP) is a plan each individual completes describing professional.
Aligning Academic Review and Performance Evaluation (AARPE)
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
Student Learning Objectives (SLOs) Measuring Teacher Effectiveness Through the Use of Student Data SLO Process – Step 4 Monitoring Progress and Refining.
5-Step Process Clarification The 5-Step Process is for a unit, topic, or “chunk” of information. One form should be used for the unit, topic, etc. The.
Including Student Growth in Educator Evaluation Day 3 Monitoring and Adjusting February,
LOUGHBOROUGHCOLLEGE Business Support Self Assessment
PRESENTED BY THERESA RICHARDS OREGON DEPARTMENT OF EDUCATION AUGUST 2012 Overview of the Oregon Framework for Teacher and Administrator Evaluation and.
Making Connections. Data Analysis Needs Assessment Improvement Plan Implement & Monitor ●Set annual goals ●Identify a strategy ●Set quarterly goals ●Determine.
Elementary & Middle School 2014 ELA MCAS Evaluation & Strategy.
 In Cluster, all teachers will write a clear goal for their IGP (Reflective Journal) that is aligned to the cluster and school goal.
School Improvement Planning Today’s Session Review the purpose of SI planning Review the components of SI plans Discuss changes to SI planning.
Including Student Growth in Educator Evaluation Day 3 Monitoring and Adjusting January, 2014.
Evaluation Team Progress Collaboration Grant 252.
Teacher Evaluation and Professional Growth Program Module 4: Reflecting and Adjusting December 2013.
South Western School District Differentiated Supervision Plan DRAFT 2010.
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
NOVEMBER 6, 2014 Harlingen CISD PBMAS Intervention Planning.
Texas Accountability Intervention System Part 2 September 23, 2013 Education Service Center, Region 2 Electronic handouts:
SAISD Focus/Priority Training Samantha Gallegos, Coordinator III
4- Step Middletown’s Response to Intervention process.
Reform Model for Change Board of Education presentation by Superintendent: Dr. Kimberly Tooley.
One Common Voice One Plan February 11, 2010 Office of Educational Improvement and Innovation and Office of Field Services.
Texas Accountability Intervention System (TAIS). Data Process Reporting State Districts & Campuses IR or Met Standard Indexes & Safeguards Federal (ESEA.
Data Analysis Processes: Cause and Effect Linking Data Analysis Processes to Teacher Evaluation Name of School.
Welcome to today’s Webinar: Tier III Schools in Improvement We will begin at 9:00 AM.
Northwest ISD Target Improvement Plan Seven Hills Elementary
Aligning Academic Review and Performance Evaluation AARPE Session 5 Virginia Department of Education Office of School Improvement.
June 2015 Good morning and welcome! 1.Open template and begin to review; and 2.Be sure you have your 2015 accountability data out, ready for easy.
Student Learning Objectives 1 SCEE Summit Student Learning Objectives District Professional Development is the Key 2.
TEACHER EVALUATION IMPLEMENTATION DAY: STUDENT GROWTH AND GOAL SETTING September 25, 2015 Shorewood High School 9/25/15 1.
Welcome to PD Forum FY 11. Professional Development Support Structure SchoolsDistrict Support Department PD Team (Administrator, PD Contact, & PD Team.
© 2014, KDE and KLA. All rights reserved. PROFESSIONAL GROWTH AND SELF-REFLECTION.
1 One Common Voice – One Plan School Improvement Module 3 Study: Analyze Data Set Goals and Measurable Objectives Research Best Practice.
School-Wide Positive Behavioral Interventions & Supports: New Team Training Evaluation Day 2.
1 One Common Voice – One Plan School Improvement Stage 3 Plan: Develop School Improvement Plan.
“ Let us not be content to wait and see what will happen, but give us the determination to make the right things happen”- Horace Mann 2014 MCAS Overview.
Accreditation (AdvancED) Process School Improvement Activities February 2016 Office of Service Quality Veda Hudge, Director Donna Boruch, Coordinator of.
Setting Your Goals For TTESS Memorial HS Training September 11, 2015.
UPDATE ON EDUCATOR EVALUATIONS IN MICHIGAN Directors and Representatives of Teacher Education Programs April 22, 2016.
Purpose of Teacher Evaluation and Observation Minnesota Teacher Evaluation Requirements Develop, improve and support qualified teachers and effective.
ABC School Data Wall Our priorities for District Goals – 1) Ensure individual students continuously exhibit academic and personal.
Campus Turnaround Plan Webinar FEBRUARY 22, 2016 TEXAS EDUCATION AGENCY.
SCHOOL-WIDE POSITIVE BEHAVIORAL INTERVENTIONS AND SUPPORT: ADDRESSING THE BEHAVIOR OF ALL STUDENTS Benchmarks of Quality KENTUCKY CENTER FOR INSTRUCTIONAL.
Campus Turnaround Plan Webinar MARCH 23, 2016 TEXAS EDUCATION AGENCY.
Mason County Schools Policy 5310 August 11, 2016.
Middle School Training: Ensuring a Strong Foundation of Supports
SOESD’s Teacher Evaluation & Support System
RAMP up your Counseling Program
TAIS Overview for Districts
PBMAS TAIS TRAINING Gretchen Kroos Jim Phillips
Educator Effectiveness Regional Workshop: Round 2
Webinar: ESSA Improvement Planning Requirements
IMPROVEMENT PLANNING Facilitator Talking Points:
Instructional Coaches District BE/ESL Department
Mason County Schools Policy 5310 August 11, 2016.
Strategic Planning Final Plan Team Meeting
Instructional Coaches District BE/ESL Department
Illinois SMART School Academy
IMPLEMENTATION & MONITORING
Aligning Academic Review and Performance Evaluation (AARPE)
Presentation transcript:

Data Analysis Needs Assessment Improvement Plan Implement & Monitor ●Set annual goals ●Identify a strategy ●Set quarterly goals ●Determine interventions Purpose

Making Connections

Annual Goal Problem Statement Root Cause Strategy

Annual Goal Problem Statement ELLs have a 50% pass rate in reading ELL student group will have 60% pass rate on 2016 STAAR reading Root Cause Strategy Does the annual goal resolve the problem statement? YES

S.M.A.R.T. Specific Measurable Attainable Results- Based Time- Bound

ELL student group will have 60% pass rate on 2016 STAAR reading Can you find all of the SMART elements in this annual goal?

ELL student group will have 60% pass rate on 2016 STAAR reading SPECIFIC ELL student group will have 60% pass rate on 2016 STAAR reading

MEASURABLE ELL student group will have 60% pass rate on 2016 STAAR reading

ATTAINABLE ELL student group will have 60% pass rate on 2016 STAAR reading 10% increase

ELL student group will have 60% pass rate on 2016 STAAR reading RESULTS-BASED ELL student group will have 60% pass rate on 2016 STAAR reading

TIME-BOUND ELL student group will have 60% pass rate on 2016 STAAR reading

Let’s Kahoot  Select one person at your table to be your team representative  Go to on your laptop or smart phonehttps://kahoot.it/  Enter Game Pin:  Get ready to have some fun!

ANNUAL GOAL PROBLEM STATEMENT

Annual Goal Work 1.Create an annual goal that is aligned to and resolves the problem statement you identified. 2.Verify annual goal is a SMART goal. 3.Write annual goal on your team’s poster.

T I P S Ensure the annual goal is aligned to the PROBLEM STATEMENT Check to see the goal is written in a S.M.A.R.T way

Data Analysis Needs Assessment Improvement Plan Implement & Monitor ●Set annual goals ●Identify a strategy ●Set quarterly goals ●Determine interventions Purpose

Annual Goal Problem Statement Root Cause Strategy

Annual Goal Problem Statement ELLs have a 50% pass rate in reading ELL student group will have 60% pass rate on 2016 STAAR reading Root Cause Strategy Lack of teacher understanding for the instructional strategies needed to meet linguistic needs of ELLs Implement sheltered instruction campus-wide

Strategy HOW to get from this… to this… to THIS!

IS broad and over-arching Strategy Structures Systems Models Processes

IS NOT narrow and specific TRAINING

Annual Goal Problem Statement Root Cause Strategy Lack of teacher understanding for the instructional strategies needed to meet linguistic needs of ELLs Implement sheltered instruction campus-wide Does the strategy directly address the root cause?

Quality Check Focuses on broad, over-arching approaches such as systems, structures, models, processes. Customize to address identified root cause on your campus. Ensure that you have the capacity and resources to implement strategy with fidelity.

Strategy Work 1.Discuss and consider the strategy your campus will implement to address root cause. 2.Ensure it is a broad, over-arching method or approach. 3.Write strategy on your team’s poster. 4.Can enter annual goal and strategy into template.

T I P S Strategies are a BROAD way to close the gap and achieve the annual goal.

Data Analysis Needs Assessment Improvement Plan Implement & Monitor ●Set annual goals ●Identify a strategy ●Set quarterly goals ●Determine interventions Purpose

A Quarterly Goal IS a target for the implementation of the strategy IS NOT breakdown of annual goal

Quarter 2 Goal= 10% Quarter 3 Goal= 10% Quarter 4 Goal= 10% Annual Goal = Increase Scores by 10%

Q 1 Goal= 2.5% Q 2 Goal= 2.5% Q 3 Goal= 2.5% Q 4 Goal= 2.5%

Q 1 Goal= 2.5% Q 2 Goal= 2.5% Q 3 Goal= 2.5% Q 4 Goal= 2.5%

A Quarterly Goal IS a focus on stakeholder behaviors IS NOT equal to annual goal Problem Statement Annual Goal Increase performance of students served through special education by 8%

A Quarterly Goal IS focused on results IS NOT focused on process

A Quarterly Goal IS Sense of urgency SMART Point for celebration Specific S

A Quarterly Goal ISA Quarterly Goal IS NOT A target for strategy implementation A breakdown of annual goal A focus on a change in stakeholder behavior Equal to annual goal (4 th quarter) Results-based (Outcome of implementation) Process-based (Summary of completed tasks) SMART Urgent Point for celebration

Strategy- Host a Dinner for a Group of Friends Q1 Q2 Q4 Q3

Strategy Implementation = Stakeholder Behaviors

Administrative TeamTeacher-LearningTeacher-PracticeStudent-LearningInstructional Coaches District BE/ESL Department Design training plan and calendar Teachers will understand how to incorporate all four language domains into lessons Teachers will incorporate language objectives into lesson plans Students are making growth in language proficiency levels Conduct walkthroughs Provide training Design walkthrough protocol Teachers will understand linguistic instructional strategies Teacher will incorporate multiple language domains into daily lessons Students’ academic vocabulary increases Provide feedback Do walkthrough to monitor implementation and calibrate with campus admin Conduct walkthroughs Teachers will incorporate linguistic instructional strategies Provide follow-up support training Provide feedback to campus leadership team Provide feedback to teachers on walkthroughs Evaluate strategy implementation Provide coaching and resources Assist admin team in designing training plan and calendar Attend training Evaluate strategy implementation Annual Goal: ELL student group will have 60% pass rate on STAAR reading assessment in spring 2016 Root Cause: Lack of teacher understanding for appropriate instructional strategies to meet ELL needs. Strategy: Implement sheltered instruction strategies campus-wide

Administrative TeamTeacher-LearningTeacher-PracticeStudent-LearningInstructional Coaches District BE/ESL Department Design training plan and calendar Teachers will understand how to incorporate all four language domains into lessons Teachers will incorporate language objectives into lesson plans Students are making growth in language proficiency levels Conduct walkthroughs Provide training Design walkthrough protocol Teachers will understand linguistic instructional strategies Teacher will incorporate multiple language domains into daily lessons Students’ academic vocabulary increases Provide feedback Do walkthrough to monitor implementation and calibrate with campus admin Conduct walkthroughs Teachers will incorporate linguistic instructional strategies Provide follow-up support training Provide feedback to campus leadership team Provide feedback to teachers on walkthroughs Evaluate strategy implementation Provide coaching and resources Assist admin team in designing training plan and calendar Attend training Evaluate strategy implementation Annual Goal: ELL student group will have 60% pass rate on STAAR reading assessment in spring 2016 Root Cause: Lack of teacher understanding for appropriate instructional strategies to meet ELL needs. Strategy: Implement sheltered instruction strategies campus-wide

Stakeholder Brainstorm 1.Find the blank stakeholder behavior brainstorm resource 2.For each stakeholder, brainstorm all the needed actions/behaviors needed to implement strategy. 3.Then, regardless of stakeholder, order the actions in the order they need to be done.

Grouped Stakeholder Behavior Quarter Goals and Interventions Q3 Q2 Q1 Q4

Admin and ICs attend training Design training plan and calendar with assistance from BE/ESL dept. Design walkthrough protocol BE/ESL dept. delivers training to staff Teachers will learn how to incorporate all four language domains into lessons. Teachers will incorporate language objectives into lesson plans. Teachers will incorporate all four language domains into lessons. Admin and ICs will conduct walkthroughs with BE/ESL dept BE/ESL department will provide feedback to admin team Admin and ICs provide feedback to teachers ICs provide coaching and support ICs provide follow-up training Teachers will understand linguistic instructional strategies and how to incorporate into lessons. The language proficiency levels of ELLs will increase. Teachers will incorporate linguistic instructional strategies into lessons. JUNE/ JULY Q1 Aug Sept Oct Q2 Nov Dec Jan Q3 Feb Mar Q4 April May June Students’ academic vocabulary increases. Evaluate strategy implementation. Staff survey Data review Identify training needs for Intervention groups based on assessment results

Admin and ICs attend training Design training plan and calendar with assistance from BE/ESL dept. Design walkthrough protocol BE/ESL dept. delivers training to staff Teachers will learn how to incorporate all four language domains into lessons. Teachers will incorporate language objectives into lesson plans. Teachers will incorporate all four language domains into lessons. Admin and ICs will conduct walkthroughs with BE/ESL dept BE/ESL department will provide feedback to admin team Admin and ICs provide feedback to teachers ICs provide coaching and support ICs provide follow-up training Teachers will understand linguistic instructional strategies and how to incorporate into lessons. The language proficiency levels of ELLs will increase. Teachers will incorporate linguistic instructional strategies into lessons. JUNE/ JULY Students’ academic vocabulary increases. Evaluate strategy implementation. Staff survey Data review Identify training needs for By the end of the 1 st nine weeks, 100% of teachers are including appropriate language objectives in their lesson plans to provide students the opportunity to work in multiple language domains. Intervention groups based on assessment results Q1 Aug Sept Oct Q2 Nov Dec Jan Q3 Feb Mar Q4 April May June

A Quarterly Goal Is Focused on Results By the end of the 1 st nine weeks, 100% of teachers are including appropriate language objectives in their lesson plans to provide students the opportunity to work in multiple language domains. By the end of the 1 st nine weeks, 100% of teachers are including appropriate language objectives in their lesson plans. 100% of teachers received training in sheltered instruction. Results- focused with student impact Results- focused Process- focused

Admin and ICs attend training Design training plan and calendar with assistance from BE/ESL dept. Design walkthrough protocol BE/ESL dept. delivers training to staff Teachers will learn how to incorporate all four language domains into lessons. Teachers will incorporate language objectives into lesson plans. Teachers will incorporate all four language domains into lessons. Admin and ICs will conduct walkthroughs with BE/ESL dept BE/ESL department will provide feedback to admin team Admin and ICs provide feedback to teachers ICs provide coaching and support ICs provide follow-up training Teachers will understand linguistic instructional strategies and how to incorporate into lessons. The language proficiency levels of ELLs will increase. Teachers will incorporate linguistic instructional strategies into lessons. JUNE/ JULY Students’ academic vocabulary increases. Evaluate strategy implementation. Staff survey Data review Identify training needs for By the end of the 1 st nine weeks, 100% of teachers are including appropriate language objectives in their lesson plans to provide students the opportunity to work in multiple language domains. By the end of the 1 st semester, students are working in at least two language domains in 80% of classes observed. By the end of March, 80% of teachers are incorporating vocabulary strategies into lessons to improve students’ academic vocabulary. Intervention groups based on assessment results Q1 Aug Sept Oct Q2 Nov Dec Jan Q3 Feb Mar Q4 April May June

Key Points to Remember Developing Quarterly Goal Consider the timing of the quarter Ensure you have identified the data source you will use to measure Quarterly goals are checkpoints toward implementation Ensure quarterly goals are following the “Is” column

Admin and ICs attend training Design training plan and calendar with assistance from BE/ESL dept. Design walkthrough protocol BE/ESL dept. delivers training to staff Teachers will learn how to incorporate all four language domains into lessons. Teachers will incorporate language objectives into lesson plans. Teachers will incorporate all four language domains into lessons. Admin and ICs will conduct walkthroughs with BE/ESL dept BE/ESL department will provide feedback to admin team Admin and ICs provide feedback to teachers ICs provide coaching and support ICs provide follow-up training Teachers will understand linguistic instructional strategies and how to incorporate into lessons. The language proficiency levels of ELLs will increase. Teachers will incorporate linguistic instructional strategies into lessons. JUNE/ JULY Students’ academic vocabulary increases. Evaluate strategy implementation. Staff survey Data review Identify training needs for By the end of the 1 st nine weeks, 100% of teachers are including appropriate language objectives in their lesson plans to provide students the opportunity to work in multiple language domains. By the end of the 1 st semester, students are working in at least two language domains in 80% of classes observed. By the end of March, 80% of teachers are incorporating vocabulary strategies into lessons to improve students’ academic vocabulary as reflected by walkthroughs. Intervention groups based on assessment results By mid-June, campus leadership will review multiple data sources to determine the effectiveness of strategy and to identify barriers to address through planning. Q1 Aug Sept Oct Q2 Nov Dec Jan Q3 Feb Mar Q4 April May June

Key Points to Remember Fourth Quarter The fourth quarter has both implementation and evaluative components. Fourth quarter goals could have either an  implementation focus (PBIS example) or  an evaluative focus (sheltered instruction example). Regardless of the focus of the goal, you may have implementation intervention activities and evaluative implementation activities.

Quarterly Goal Development 1.Group stakeholder behaviors by quarter. 2.Choose one quarter and develop a quarterly goal. 3.Verify against Is/Is Not chart. 4.Record quarterly goal in template.

T I P S REMEMBER quarterly goals will be different based on quarterly interventions and targets. Quarterly goals are CHECKPOINTS for your STRATEGY IMPLEMENTATION Quarterly goals should be RESULTS-BASED goals

Quarterly planning video at Guidance documents at Documents Stakeholder graphic organizer

Data Analysis Needs Assessment Improvement Plan Implement & Monitor ●Set annual goals ●Identify a strategy ●Set quarterly goals ●Determine interventions Purpose

Potential Challenges in Interventions and Data Sources Use data components to measure implementation of interventions; Be aware of interventions vs. strategies. Align interventions in order to accomplish quarterly goal; Remember to: Align data sources to the interventions; and

Stakeholder Actions Interventions

Design walkthrough protocol BE/ESL staff delivers training to staff and administrative team sets expectation for language objective to be included in lesson plans Teachers work on language objectives during planning in PLCs and include in lesson plans and lesson plans reviewed and feedback given individually and through PLCs Admin team and IC conduct walkthroughs with BE/ESL district support to provide feedback on implementation and to ensure inter-rater reliability Design walkthrough protocol BE/ESL dept. delivers training to staff Teachers will learn how to incorporate all four language domains into lessons. Teachers will incorporate language objectives into lesson plans. Teachers will incorporate all four language domains into lessons. Admin and ICs will conduct walkthroughs with BE/ESL dept.

Stakeholder actions Interventions

Data Sources Must connect to your interventions

Key Points to Remember Interventions No magic in 4 interventions Multiple behaviors could be combined to develop one intervention One behavior could result in multiple interventions Sometimes additional details will need to be added to a behavior in order to develop an intervention Multiple data sources could be used to measure the impact of an intervention

Intervention Development 1.Using stakeholder brainstorm and behaviors grouped for the quarterly goal you developed, determine intervention activities. 2.Set data sources for these interventions. 3.Record interventions in template.

T I P S Determine the SPECIFIC ACTIONS that will be taken to accomplish quarterly goals.

Purpose ●Review data by quarter ●Determine level of impact ●Ensure quarterly reporting ●Adjustments to the plan ensure success Data Analysis Needs Assessment Improvement Plan Implement & Monitor

Annual Goal

Strategy

Annual Goal Strategy

Potential Challenges in Implementation and Monitoring Plans are living and working documents. Remember that: Plans are not written in stone.

Potential Challenges in Implementation and Monitoring Remember, Plans must be monitored

Potential Challenges in Implementation and Monitoring than to continue in the wrong direction. AND that: It is best to adjust,

Quarterly Check-In Expectations Set inter-quarter dates to discuss progress Don’t wait until mid-year submission to reflect and make adjustments Presenter Talking Points:

Q3Q2 Q1 Q4 Initial Submission (Nov 10) Mid-Year (Feb 10) TEA Determined End-of-Year (June 10)

PAIRED CAMPUSES Requirements Requirements Each Paired Campus Submitted a Targeted Improvement Plan A Single Targeted Improvement Plan Will Be Submitted for Both Campuses Expectations: Evidence of data from both campuses in data analysis Evidence of strategies for both campuses Evidence of leadership from both campuses participating in planning

T I P S Determine what kind of data will be collected to reflect levels of IMPLEMENTATION and IMPACT. Quarterly reporting is based on COLLABORATIVE data collection and analysis.

T I P S The monitoring plan can serve as an “EARLY WARNING” to inform adjustments and corrections.

Monitor Support

Helpful Resources Know and use your Support Specialist Stay tuned to the TCDSS website: Access the Guidance Documents and Planning Resources Work with your PSP Region One:

PMI Homepage

TCDSS Homepage

Where are Support Specialists Located in ISAM?

Thank you for your attention and have a great year!

Q3Q2 Q1 Q4 Mid-Year (Feb 10)Initial Submission

Q3Q2 Q1 Q4 Mid-Year (Feb 10)Initial Submission

Q3Q2 Q1 Q4 Mid-Year (Feb 10)Initial Submission