BI day 2000 08/12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Chi-Cheng Lin, Winona State University CS412 Introduction to Computer Networking & Telecommunication Theoretical Basis of Data Communication.
The EMMA Turn-by-Turn BPM System A. Kalinin ASTeC Daresbury Laboratory STFC EMMA Commissioning Workshop Daresbury Laboratory, 21 May 2009.
1 IF Receiver for Wideband Digitally Modulated Signals Direct Instructor: Doctor Ronen Holtzman, Microwave Division, Elisra Electronic Systems Ltd. Supervising.
1 Dr. Un-ki Yang Particle Physics Group or Shuster 5.15 Amplifiers and Feedback: 3.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Bandpass Sigma-Delta Modulator Michael Vincent Brian McKinney ECEN5007.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Frequency to Voltage Converter and Voltage to Frequency Converter Where an instrumentation system is based mainly on capturing voltage signals (analogue.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Key Specifications for Tevatron BPM Hardware Architecture Choices Jim Steimel.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Collaboration Proposals HERMANN SCHMICKLER, MELBOURNE
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Chi-Cheng Lin, Winona State University CS 313 Introduction to Computer Networking & Telecommunication Theoretical Basis of Data Communication.
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Network Analyzers From Small Signal To Large Signal Measurements
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Tools for Discovery CAEN solutions for Diamond Detectors June 24 th 2011, Viareggio Giuliano Mini.
Gain & Noise Comparison for Mini-Circuits, Wenteq and U. Penn Amplifier Changguo Lu, Kirk McDonald 8/20/2013.
SPECTRUM ANALYZER 9 kHz GHz
8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
M.Gasior, CERN-BE-BI8th DITANET Topical Workshop on Beam Position Monitors, January 2012, CERN 1 BPM Signal Processing with Diode Detectors Marek.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Collimator BPM electronics – Results from the lab, SPS and LHC
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
CERN LECC 2006, September, Valencia, Spain Acknowledgements: Eva Calvo Giraldo, AB/BI Rhodri Jones, AB/BI Greg Kasprowicz, AB/BI Thilo Pauly, ATLAS.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
Very Forward Detectors Workshop on beam position monitoring and detector alignment.
Specifications of Tevatron BPM Upgrade Jim Steimel.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
M.Gasior, CERN-BE-BILHC Optics Measurement and Corrections Review, June Diode ORbit and OScillation (DOROS) System Marek GASIOR Beam Instrumentation.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
The LHC Beam Position System Ad-hoc Working Group on LHC Experiment-Machine Parameter and Signal Exchange 26 th March 2002 Rhodri Jones (SL/BI)
M. Gasior, CERN-AB-BIFP 420 BPM Workshop1 Signal Processing for BPMs Marek GASIOR CERN-AB-BI.
G.F. Tassielli - SuperB Workshop XI LNF1/11 02/12/2009 Status report on CLUster COUnting activities G. F. Tassielli on behalf of CLUCOU group SuperB Workshop.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
Beam Secondary Shower Acquisition System: Front-End RF Design
Communication 40 GHz Anurag Nigam.
A General Purpose Charge Readout Chip for TPC Applications
Analog FE circuitry simulation
R&D activity dedicated to the VFE of the Si-W Ecal
ALPS SPS BPM Read-out Electronics RF Front-end – revised
Status of the MOPOS BI TB – 26th June 2014.
EMC Electronics and Trigger Review and Trigger Plan
> 50 dB ≤ 500 MHz Non-intercepting beam position measurement
BESIII EMC electronics
Limits on damping times
Beam Current Monitoring with ICT and BPM Electronics
Undulator Cavity BPM System Status
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
HL-LHC HEL BPM.
Presentation transcript:

BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution  Beam measurements  Conclusions

BI day /12/00 2 Present situation - No Bpm’s in TT2 - 7 BPM’s in TT10 - TLPOS electronics:  Is not conceived to measure heavy ions and LHC beams  Requires gain switching  Obsolete components  Difficult maintenance

BI day /12/00 3 Proposals  Studies & specifications  G.Arduini & M.Giovannozzi  Steering optimization requires:  6 BPM’s in TT2  14 BPM’s in TT10  Electronics in BA269 (50%) & BA1 (50%)  Reduced cost for cables & G.P. equipment's  Active electronics present in the tunnel  Inconvenience: BPCL-1006 difficult to access (on opposite side of the custom door)

BI day /12/00 4 BPM layout  BPCK replaced by BPCL  from TI12 & 18 and TT70  Electrodes  Placed on hor. & vert. axes  Aperture ± 66.5 mm

BI day /12/00 5 Beam Types  Fix target protons  2000 bunches spaced by 5 ns, 1.7 ns wide  Heavy ions for Fix target  16 bunches spaced by 131 ns, 15 ns wide  LHC  single / 84 bunch spaced by 25 ns, 2.1 ns wide  Heavy ions for LHC  4 bunches spaced by 125 ns, 2.4 ns wide  Special beams  1,8,16 bunches spaced by 262 ns, 15 ns wide

BI day /12/00 6 Dynamic & frequency spectrum f 0 = 22.8 MHz f 0 = 200 MHz

BI day /12/00 7 LP Filter LP Filter A B Logamp I to V Converter Diff. Ampli Position = K * V out Logamp I to V Converter Logarithmic normalization A spectral line is selected, compressed by a logarithmic amplifier, filtered and applied to a differential amplifier. The position response is Pos.  [log(A/B)] = [log(A)-log(B)]  (V out ) where V out is the voltage difference between the log-amp outputs BP Filter BP Filter

BI day /12/00 8 New generation circuits use several cascaded limiting amplifiers, with fix gain and wide bandwidth. Full wave rms detectors are applied among each stage and by summing theirs output signals, a good approximation to a logarithmic transfer function is obtained. Input dynamic range : >90 dB Input noise: < 1.5 nV/  Hz Non conformance lin.:<  0.3 dB Limiter Bandwidth:D.C. to >2 GHz Video Bandwidth: D.C. to 30 MHz Logarithmic amplifier description

BI day /12/00 9 Beam signals (Heavy Ions) H = 500 ns/div V = 200 mV/div Output Level = dBV for 2*10 10 charge/16 bunches H = 500 ns/div V = 20 mV/div  1.8 mm/div Resolution= 85  m (V plane) for 1  s integration time H = 500 ns/div V = 20 mV/div  1.8 mm/div Resolution= 85  m (V plane) for 1  s integration time 1  s 22 MHz BP filter

BI day /12/00 10 Calibration signal (Sgl LHC bunch)  H = 200 ns/div  V = 200 mV/div  Output level = dBV for 1*10 10 p/bunch  H = 100 ns/div  V = 10 mV/div .9 mm/div  Resolution = 45  m over 100 ns integration time 22 MHz BP filter 100 ns

BI day /12/00 11 Calibration signal (Fix Target) H =.5  s/div V = 200 mV/div Output Level = dBV for.2*10 10 p/b and 500 b H =.5  s/div V = 10 mV/div .9 mm/div Resolution = 25  m for 1  s integration time Single channel (-D) Difference (position) (U-D) 200 MHz BP filter 1  s

BI day /12/00 12 Position errors & resolutions (rms)  Non-conformity to log function:  Position dependence versus intensity: Zero for a centered beam Up to 250  m for a  11 mm off-center beam  200 MHz channel:  Fix Target: 25  m/ p/b and > 400 bunches  LHC : 40  m/10 10 p/b and 84 bunches  22 MHz channel:  LHC single: 50  m/10 10 p/b  Heavy Ions (Fix Target): 50  m/10 10 Charges/b  Special : ??

BI day /12/00 13 Digitization & Acquisition  Log-amp signals (BW < 4 MHz) are send to the auxiliary buildings, via coaxial cables Mopos  A modified version of Mopos digitizer, with integrator and 14 bit ADC  To improve S/N ratio two integration times are implemented (100 ns and 1  s) Mopos  Acquisition is identical to Mopos system (VME power PC & PMC MACI)

BI day /12/00 14 Timing  Only 1st Log-amp in the beam line offers auto-trigger capability  Individual timing is required for each BPM’s  Fast timing ( SPS injection pre-pulses, rev.frequency)  Extremely long and jitter free delay units  Beam and Calibration timing are different  Slow timing (GMT) to initialize elementary cycle settings

BI day /12/00 15 Calibration  Remotely triggered  Single or 40 MHz LHC bunch simulation  It offers 0 db (center) and -6 dB ratio  +6dB ratio obtained by switching coax. relays  Center position can be cross calibrate with beam, by switching electrodes (coaxial relays)

BI day /12/00 16 Conclusions  A special effort has been done to reduce the cost as much as possible  Investment per channel still extremely low  cables and digital electronics & services represent the largest part of the budget (~78%)  Schedule: TT2 line will be put into operation current 2001 and TT10 after 2001/02 shut- down “Good luck to my successor!”