Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Advertisements

Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP04.2.
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective ATC 02.6 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
The European Organisation for the Safety of Air Navigation Objective AOP04.1.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
ESARR 5 and language proficiency for ATCOs European Organisation for the Safety of Air Navigation ICAO – EUROCONTROL EUROPEAN SEMINAR ON LANGUAGE PROFICIENCY.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Juan Vázquez Sanz EUROCONTROL SRU
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Workshop on preparations for ANConf/12 − ASBU methodology
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Safety Management in Europe
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Workshop on preparations for ANConf/12 − ASBU methodology
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Workshop on preparations for ANConf/12 − ASBU methodology
ROMATSA – SAFETY, EFFICIENCY AND ENVIRONMENTAL PERFORMANCE IN ATM
Presentation transcript:

Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR

ESSIP Plan 2013 / Objective ATC Comprehensive Explanation (1/2)  Implementation of ground-based Short Term Conflict Alert (STCA) safety net  ECAC – wide applicable  Requires implementation by all ATC units that provide surveillance (= radar) services to General Air Traffic (GAT) within En-route airspace, in the Terminal Area (TMA) and or Control Zone (CTR).  Military applicability: The Objective is applicable to military ANSPs that provide radar service to GAT traffic (Note: currently there are 8 MIL ANSPs across the ECAC region).

Comprehensive Explanation (2/2)  STCA checks the extrapolated track positions based on radar data (current track position) and performs a linear extrapolation using the detected ground speed and predicts or establishes an actual conflict between a/c.  A conflict is declared if a/c tracks are separated less than the minimum separation thresholds.  Some Flight Plan (FP) data like Cleared Flight Level (CFL) can be used to suppress false alarms.  STCA requires appropriate presentation of predicted/actual conflicts to the tactical controllers and ATC supervisor. ESSIP Plan 2013 / Objective ATC 02.23

Link to European ATM Master Plan  [CM-0801] – Ground Based Safety Nets (TMA, En Route) ESSIP Plan 2013 / Objective ATC 02.24

Most important SLoA(s)  ASP01 “Implement STCA systems and associated procedures in line with EUROCONTROL Specification and related guidance material in En-Route airspace, applicable TMAs and Military ATC units providing radar services.”  ASP03 “Develop safety assessment for the changes, notably ATC systems and procedures that will implement STCA – level 2 functionality and associated procedures.” together with:  REG01 “Conduct safety oversight of changes. Verify that a safety assessment is conducted and review the safety assessment report before acceptance.” ESSIP Plan 2013 / Objective ATC

Finalisation Criteria & Closed Questions  REG01 – The introduction of the change into service was accepted and a notification of acceptance has been provided to the ANSP.  ASP01 – STCA function is implemented, documented and in operational use.  ASP03 – The Safety Assessment report including safety arguments for the changes has been delivered to the NSA and a notification of acceptance was received.  STCA implemented at ACC level?  STCA implemented in all TMAs / Towers within CTRs that provide radar services?  STCA parameters tuned to the operational environment (traffic, suppression of alarm in pre-defined areas, look-ahead time, warning time)?  Safety assessment done and accepted by NSA?  Notification of acceptance received from NSA? ESSIP Plan 2013 / Objective ATC 02.26

Supporting Material  EUROCONTROL Specification for Short Term Conflict Alert, updated Edition 1.1, dated May 2009  EC-Regulation (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services and amending Regulation (SU) No 691/2010  EC-Regulation (EU) No 1035/2011 of 17 October 2011 laying down common requirements for the provision of air navigation services and amending Regulations (EC) No 481/2008 and (EU) No 691/2010.  Relevant ESARR documents  Safety assessment methods ESSIP Plan 2013 / Objective ATC 02.27

ESSIP Report 2012  18 States reported LATE.  Implementation delays / not achieved due to:  implementation of a new ATC System  Implementation and/or validation/verification of STCA before putting into operation delayed  Implementation of STCA in TMA area delayed  Need to implement STCA to avoid impact on safety and achievement of expected safety benefits ESSIP Plan 2013 / Objective ATC 02.28

Contacts  Objective Coordinator: FEIJT, Ingrid  DNM Objective Expert(s): BAKKER, Ben DROZDOWSKI, Stanislaw ESSIP Plan 2013 / Objective ATC 02.29