SRI DURGA MALLESWARA SWAMY VARLA DEVASTHANAM INDRAKEELADRI: VIJAYAWADA

Slides:



Advertisements
Similar presentations
PROFESSIONAL WORK 1. CORGAN ASSOCIATES, DALLAS, TX CENTERPORT –II TWA
Advertisements

Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Homes.
Muharram 1435H – Parking arrangements Access for ladies & gents Inside the hall Sabeel-e-Hussain.
INTRODUCTION. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced.
IVCF Philippines Campsite Development Project. IVCF Core Value Designing and running camps and conferences that cultivates personal transformation in.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
The Place is surrounded by the famous Tourist and Religious Places like Srirangapatna, Ganjam, Nimishamba, Ranganatittu, Nanjanagoodu Melukote,
2309 S 6 th St A Pictorial Tour. For sale Classic 100 year old home Estate Sale Over 1700 square feet Three + bedrooms Two baths Two car garage on extra.
Building Expansion Project Update ECCC 4.9 Growth Strategy We will continue to grow as a “one site multi congregations & services” church.
Luxury Homes FROM separate entry exits D L F B A Y V I E W.
Better Acute Care in Lothian St. John’s Hospital Welcome to the Project Launch of the Short Stay Elective Surgical Centre.
2008 Goal New Goloka Dhama Dimmocks Mill Road, Hillsborough, NC, To build a nice temple facilities for Sri Sri Radha Golokananda Ji in Hillsborough,
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
Punjab Bye Laws for Commercial Buildings. Punjab Bye Laws for commercial buildings Maximum permissible ground coverage is 40% in commercial. Height- Unlimited,
Senior Architect (WZ)I C.P.W.D.Mumbai MULTIPURPOSE HALL FOR SPORTS AUTHORITY OF INDIA GANDHINAGAR.
DESIGN PRESENTATION APRIL FAÇADE DEVELOPMENT.
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
North-East Northamptonshire Project Highlight Report No. 2 Period October 15 th to October 31 st 2014 Thursday October 30 th 2014.
Florida State University Parking Analysis. Overview The designated site in question The designated site in question Data observed Data observed The “parking.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Tourism In And Around RAJAHMUNDRY
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
School Building ready for Slab casting.. View of the Children's Home.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Room Relationships and Sizes
drawings DRAWINGS DIFFERENT TYPES ? Architects working drawings Block Plan Site Plan General Location Plan Detail Drawing component part drawing.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
World Affair World Affair Start Up Plan And Investment Proposal.
The school is on a small site, in a residential, urban area. The site contained: Play ground Early Years area Car park ‘No go’ a large Victorian building.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
PROVIEW CONSTRUCTION LTD SAI SHARNAM Pictorial walkthrough.
Drop Off and Pick Up Procedures. Front parking lot is reserved for school buses only. If you need to come into the school please enter front.
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
Long List Workshop – Option 1 Clinical Theme & Benefit Hot/Cold split in completed build Trauma/Neurosciences provided as first stage Demolish Barry Building.
Site Selection Trade Area – The geographic area from which the store draws most of its customers Describe our trade area for the Americana Ease of Access.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
KENDRIYA VIDYALAYA DUNGARPUR (RAJASTHAN)
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Diocese of Northampton Scott Tallon Walker Architects
Floor Plans.
Highveld Industrial Park Office Block ‘’E’’ Information Memorandum
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
ET 494: Senior Design Design of a New Hammond Head Start Center
Interior Design Designing Functional Interiors & Floor Plans
Architectural Design Styles of Houses.
INTRODUCTION PRINCIPLES OF PLANNING BASIC REQUIREMENT OF A BUILDING PLANNING LAYOUT OF BUIDING  -RESIDENTIAL -INDUSTRIAL.
KAROL BAGH METRO STATION
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT March 2017 Fast Facts
City of Santa Cruz Accessory Dwelling Unit Development Program
1 Semester Project Design A Multi Story Office Building
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
Building Drawings.
Multi-storeyed Car Parking-cum- Commercial Complex at Nehru Place, New Delhi PROJECT DETAILS : This multistoreyed car parking and centrally airconditioned.
Outline Introduction Desecration of the project Soil Report
Extraordinary General Meeting
CAVE SPRING HIGH SCHOOL SITE PLAN JOB NO NOVEMBER 27, 2017
Part 1 Introduction You choose to….
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Dayrells Plantation tp://.
BUILDING LIGHTING PLAN PHASE II
CHURCHPOINT ROAD BUS LANE BLACK PARKING LOT Freshman HWY 431 Academy
Presentation transcript:

SRI DURGA MALLESWARA SWAMY VARLA DEVASTHANAM INDRAKEELADRI: VIJAYAWADA

PROPOSALS UNDER PLANNING & DISCUSSION

PROPOSALS & SUGGESTIONS FOR DEVELOPMENT WORKS : ACTION PLAN FOR ALL PROJECT TO COMPLETE IN SAID TIME : List of the Drawings, Designs and specifications to be finalise before commencement. Responsibilities and Duties of each person. Bar-chart with dates. Review on progress of work weekly. Precasted sub-way at old Foot bridge place from Durga ghat to hill side at Kanakadurga nagar site. NOTE : 1) Sub-way gives easy flow of traffic on highway. 2) No. of steps will be reduced to pilgrim. 3) Safety to pilgrim.

3) AT KANAKADURGA NAGAR SITE : a) Provision for Tourist buses parking in Ground Floor. b) Admin block construction behind Kanakadurga nagar site. c) Instead of total car parking complex, utilise the 4 floors for pilgrims. d) From Cellar + Ground + 2 floors we can get 250 cars parking. 4) Annadana mandapam behind the main Temple for easy flow of pilgrims (one way). 5) 10’ Footpath on Durga Ghat side and Hillside with railing permanently. 6) Maximum Greenery scheme along the Ramps, Roads, Main complex in front of Raj Gopuram and Around the Temple premises.

S.NO NEME OF THE WORK COST 1) GOLD WORK FOR MAIN TEMPLE (2nd PHASE) 12.00 CRORES 2) PROPOSED 9 STORIED RAJ GOPURAM INFRONT OF MAIN TEMPLE 9.80 CRORES 3) PROPOSED MULTY PURPOSE 8 STORIED COMPLEX 20.00 CRORES 4) PROPOSED ENTRY FLYOVER BRIDGE FROM GOSALA TO RAJ GOPURAM 6.00 CRORES 5) PROPOSED EXIT FLYOVER BRIDGE FROM RAJGOPURAM TO GHAT ROAD 2.50 CRORES 6) PROPOSED PEDESTIER RAMP FROM GOSALA TO Q-COMPLEX AND RAJ GOPURAM 1.25 CRORES 7) PROPOSED YAGASALA AT MALLESWARA SWAMY TEMPLE 0.39 CRORES 8) PROPOSED PRASADAM COUNTERS & REST ROOMS FOR PILGRIMS AT MALLESWARA SWAMY TEMPLE 0.30 CRORES 9) PROPOSED RETAINING WALL & AT 2nd TURNING OF EXTENTION OF ROAD EXISTING GHAT ROAD (PLAN) 2.90 CRORES 10) PROPOSED RETAINING WALL & EXTENTION OF ROAD AT OM TURNING (PLAN) 3.50 CRORES

S.NO NEME OF THE WORK COST 11) PROPOSED 5 STORIED MULTIPURPOSE COMPLEX AND ADMINISTRATIVE BLOCK AT KANAKADURGA NAGAR 13.00 CRORES 12) PROPOSED 4 STORIED PILGRIM COMPLEX AT GOSALA 6.00 CRORES 13) CONSTRUCTION OF SUITS OF JAMMIDODDI (ELEVATION) 2.00 CRORES 14) PROPOSED 3 STORIED COMPLEX FOR KITCHEN AND STORES AT OLD DURGA KALYANA MANDAPAM 0.90 CRORES 15) PROPOSED KALYANA MANDAPAM, DORMITARY HALLS, COTTAGES AND PARKING AT C.V.REDDY CHARITIES. 15.00 CRORES 16) CONSTRUCTION OF OLD AGE HOME AT PORANKI 2.35 CRORES 17) PROPOSED 2 KALYANA MANDAPAMS AT PORANKI. 5.00 CRORES 18) CONSTRUCTIONS OF DORMITARY HALLS & ROOMS AT SEETHANAGARAM. 19) CONSTRUCTION OF SUITS AT PADAKAKANI 0.60 CRORES 20) PROPOSED STAFF QUARTERS AND COMMUNITY HALL AT GUNADALA 7.00 CRORES 21) PROPOSED MEDITATION HALL & DONORS COTTAGE 1.50 CRORES