I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No. 0495-029-123, P101, C501 CITIZEN’S INFORMATION MEETING UPC 105130 NOVEMBER 19, 2013.

Slides:



Advertisements
Similar presentations
Capital Beltway HOT Lanes Project Project Update March 2009.
Advertisements

Capital Beltway HOT Lanes Project Project Update April 2009.
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
Spotsylvania County Public-Private Transportation Act Spotsylvania County Infrastructure, LLC (SCI) June 2008.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Mike Baumann Statewide Utility Engineer January 22, 2015.
Current Construction Projects Major Projects Pinellas County.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
STA Safety Project PID #76439 December 12, 2006.
PROJECT 123(14) LOR PID INTERCHANGE IMPROVEMENT PARTNERING RE-CONNECT MEETING NOVEMBER 19, 2015.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
11 Ina Road Traffic Interchange Project Update Marana Chamber of Commerce Business Connection Luncheon May 18, 2016 Greg Byres, PE, Senior Urban Project.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
MD 30 (Hanover Pike) at Mt. Gilead Road
Existing Interchange CC 215 Single bridge I 15
Four Winds Condominium Association August 2, 2017
The I-465 West Leg Reconstruction Project
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
The Oakton Condominium Association September 12, 2017
General Tab Project, Cost Schedule, and Work Limits Roadway Character
US26: Cornelius Pass Rd -185th Ave
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Construction Management & Inspection
Highway 169 Bridge Replacement & Pavement Resurfacing
I-69 Southwest/I-610 West Loop Interchange Reconstruction
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Contract 60X10 Informational Meeting Weber I-55
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Walker Street Reconstruction Project 25% Design Public Hearing
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Metropolitan District | mndot.gov
Naval Complexes Meeting April 15, 2019
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013

Location Map

Proposed Shoulder Use  Northbound Inside Shoulder (no work on Southbound)  All traffic will be allowed to use shoulder lane in peak periods (no flexible delineators)  AM and PM peak hours to alleviate traffic queues and improve merging  Static and dynamic signing, lane markings, and overhead lane-use system included

Typical Section

Pavement Work  Mill and overlay, restripe Northbound I-495 within project limits  Reconstruct outside shoulder to full depth pavement  Widen right shoulder at Georgetown Pike Interchange to provide emergency pull off  Pavement joint repairs for improved ride and longer pavement life

Structures  No major bridge work anticipated.  Sound wall/retaining wall impacts under evaluation.  Pier protection will be upgraded at overpasses within project limits  Overhead dynamic and static sign structures along median barrier and outside barrier

Concept of Operations  Advance DMS signs, static signs, overhead lane control signs, and striping to delineate shoulder lane  Light gray color for shoulder lane to provide contrast  Additional camera coverage and traffic detectors along Northbound I-495

Other Items  During construction, no lane/shoulder closures during peak hours.  Minor drainage work anticipated  Median barrier modifications to upgrade to meet current standards  No right-of-way or utility relocations anticipated

Schedule  Citizen’s Information Meeting - November 19, 2013  NEPA Document - January 2014  Notice to Proceed for Construction - May, 2014  Open for traffic - December, 2014