Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang TRD Conference Duke University Bari, Sep Design and Construction of the ATLAS Barrel TRT Chiho Wang Duke University.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Status of Gain Mapping at Duke.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
ATLAS TRT Barrel Design Review, 1998 Barrel TRT Electronics Cooling Chiho Wang Duke University.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Compressor Replacement – ODU
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
W. EbensteinDOE annual review Duke UniversitySeptember, 1998 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Straw man layout for ATLAS ID for SLHC
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Test beam straw prototype production status
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Service channels between Tracker and PP1
Acceptance test at Duke
BSS Prep work at CERN and Acceptance of Parts
End-cap Mechanics FDR Overview of the Project
Jack Fowler Duke University Spain Workshop
Barrel TRT Module Cooling
Module Production and Testing at Duke
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
Radiation Laboratory Meeting
Schedule after Shutdown
Presentation transcript:

Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang

Chiho Wang Duke University 2 Barrel TRT  3 types of modules: u Type 1: inner layer (329 straws) u Type 2: middle layer (520 straws) u Type 3: outer layer (793 straws)  32 modules each type.  Total of 96 modules to be installed on BSS (Barrel Support Structure)

Chiho Wang Duke University 3 TRT Barrel Integration  Tasks: u Install capacitors on modules (Duke) u Prepare modules for installation (Duke/IU) u Install modules in BSS (Duke/IU) u Install front end electronics (Penn+) u Install services: HV, cooling & gas manifolds. (Duke/IU)

Chiho Wang Duke University 4 A brief history  Jun 28 – 1 st type 1 installed  July 21 – Type 1 virtually complete except for 2: u 1 cooling sleeve problem u 1 HV problem (M1.35)  Aug. 2 – type 1 complete u Fixed cooling sleeve u Gave up M1.35, used M1.26  Aug. 6 – 1 st type 1 electronics installed, with readout & LV/cooling DCS interlock.  Aug. 11 – 1 st type 2 installed  Sep. 8 - M1.26 replaced with M1.35 (complete finally!)  Sep. 17 Type 2 virtually complete except for 2 modules  Sep. 17 snap shot (mechanical): u Type 1 - complete u Type modules installed, waiting for 2 modules u Type modules in SR ready to be installed.

Chiho Wang Duke University 5 Module placement in BSS u Evenly distribute dead channels … u Observe constrains or preferences on HV feeding side due to anomaly in HV kapton. Type 1 Dead Channels Type 2 Dead Channels

Chiho Wang Duke University 6 Module preparation  Capacitor installation u Insert capacitors u Check capacitor connectivity u Check HV traces u HV test: caps + wires u Seal capacitors u Inspect seal and rework as needed u HV test: caps. + wires

Chiho Wang Duke University 7 Module preparation  Pre-installation u Check ground wire u Check cooling sleeve u Check mounting holes u Custom make active gas transitional fittings u Leak test active gas fitting u Glue purging gas gasket u Apply HV kapton protection tape u Glue thermal sensors as needed (4 modules each type)

Chiho Wang Duke University 8 Module installation  Procedures & tests u Fold HV kapton and cover with protection plates u Insert module & fix one corner u Set module z position to middle of BSS u Fix module 2 nd corner & attach set screws u Check purging gas flow Type L/min < 10% loss Type L/min < 15% loss Type L/min < 20% loss u Unfold HV kapton & check traces u Attach & glue active gas fittings u Plug & seal unused active gas inlets. u Leak test active gas volume (1mB/B/min) u Install protection boards u HV test u Check active gas path for obstruction (flow rate test)

Chiho Wang Duke University 9 Non-routine module work  Components modification u Peek cooling tubes for module cooling reduced from 0.123”-0.127”  0.116”-0.120” (done) u De-magnetization of active gas inlet plugs (started on type 2 modules) u Fuse box brackets dimension change u Fuse box screws changing from Nylon to Ultem  Module repair: u Wire removal (2 bad wires + some retroactive decisions from acceptance group) u HV trace repair (1) u Cooling sleeve replacement (3) u Re-glue detached shell & divider (1) u Tension plate socket replacement (2)

Chiho Wang Duke University 10 Other then modules  Data Base: Access data base in use for progress tracking.  MTF: Migration in progress.  Remaining BSS work: Outer cylinder shielding.  Gas/Cooling manifold: Finalizing drawings

Chiho Wang Duke University 11 Electronics installation (Penn)  Protection boards u All type type 2 installed. In steady progress.  FE assembly u 1 type 1 installed. 23+ more being assembled  Working on software & data base, preparing for installation  DCS (Krakow) for HV, LV, Cooling, Interlock … ready.

Chiho Wang Duke University 12 Schedule  Mechanical: u Driven by module availability. Expecting to receive: All type 2 (2 more modules) by the end of Sep. All type 3 (25 more modules) by the end of Nov. u Expect to finish module installation mid Dec.  Electronics: u All type 1 boards produced and being processed & tested u Hope to finish board production in Nov. and finish installation Mar. 05  Service manifold installation & sector test March – May 05  Hand over to SCT in June 05

Chiho Wang Duke University 13 Summary  ~2/3 of the modules installed!  Procedures are understood and becoming routine.  Module installation expect to finish by the end of the year  Electronics installation started.