M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review1 Status of RD49 and COTS and objectives of a one-day review RD49 -

Slides:



Advertisements
Similar presentations
CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001
Advertisements

Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Development of a DC/DC converter for low voltage power distribution in LHC upgrades. Stefano Michelis Supervisor: Federico Faccio ELACCO mid-term review.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Applications developed by EN-ICE clients. 2 EN-ICE Workshop – 23 April 2009 Developed by people outside EN-ICE making use of: Our integrated solutions.
Status of 65nm foundry access for Aida June 2013 A. Marchioro CERN/PH-ESE.
A radiation-tolerant LDO voltage regulator for HEP applications F.Faccio, P.Moreira, A.Marchioro, S.Velitchko CERN.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
From Research Prototype to Production
ATLAS – CMS RD collaboration: Pixel readout integrated circuits for extreme rate and radiation The “pixel 65” collaboration 1.
DESY Participation in an External Experiment Joachim Mnich PRC Meeting
1 Radiation tolerance of commercial 130nm CMOS technologies for High Energy Physics Experiments Federico Faccio for the CERN(PH/MIC)-DACEL * collaboration.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
A.Marchioro - CERN/PH1 Accessing 130 nm CMOS Tech for ILC (Public Version) Oct 2006, Munich A. Marchioro CERN, Div. PH 1211 Geneva 23, Switzerland.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
Advanced Semiconductor Technologies for SLHC A. Marchioro / PH-ESE.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
RD 51 & CERN Workshop Upgrade RD 51 & CERN Workshop Upgrade Leszek Ropelewski (CERN), Maxim Titov (CEA Saclay) CERN, November 6, 2009.
M. Letheren, EAB 3 July 2001; MIC group activities1 EP-Microelectronics group Overview of activities & Project Summaries (more info at:
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
Common electronics projects-solutions across experiments and sub-systems
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
Development of Pixel Phase 2 chip. Goals New Pixel Chip needed to go beyond the Phase 1 baseline chip – Should be the solution for Phase 2 pixel – Should.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Status Report on the Muon System Alessandro Cardini / INFN Cagliari (with the help of the whole Muon Group)
Microelectronics User Group Meeting TWEPP 2013, Perugia, IT 26/9/2013.
EUDET-MICELEC Status Report October 2007 A. Marchioro / CERN-PH.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
Motivation for 65nm CMOS technology
Round Table discussion We prepared single slides covering –Power –Control/links –Tracker Architectures –Technologies –Trigger/DAQ –Design Libraries –Frameworks.
CMOS Sensors WP1-3 PPRP meeting 29 Oct 2008, Armagh.
Jan p 11 The aims of the meeting are to prepare ourselves for interacting with STFC as the situation unfolds. Specifically: Review and summarise.
CERN MIC Support for HEP Microelectronics Designers A. Marchioro / CERN-PH EUDET Meeting - December 14 th 2005.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Federico Faccio CERN/PH-MIC
Opto Working Group Meeting Summary Tuesday 8 March 2011 Tobias Flick and Francois Vasey.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
MUX-2010 DISCUSSION : W HAT DO WE NEED NEXT IN HEP.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.
Microelectronics for HEP A. Marchioro / CERN-PH-ESE.
Transport and Handling Manpower Planning S. Prodon – LEAF
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
An·ec·dote /ˈanikˌdōt/ Noun A short and amusing or interesting story about a real incident or person LBL - May 31,2013Support for uT at CERN - A. Marchioro1.
Technology and R&D Summary and next steps Burkhard Schmidt.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Possible contribution of Pisa on pixel electronics R&D
CERN R&D plans and Infrastructures
FF-LYNX (*): Fast and Flexible Electrical Links for Data Acquisition and Distribution of timing, trigger and control signals in future High Energy Physics.
WLCG: TDR for HL-LHC Ian Bird LHCC Referees’ meting CERN, 9th May 2017.
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
Presentation transcript:

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review1 Status of RD49 and COTS and objectives of a one-day review RD49 - Study of the radiation tolerance of ICs for LHC. (LEB 1997) COTS - Project to coordinate the selection, evaluation & procurement of Commercial-Off-The-Shelf (COTS) components for use in the radiation environments of the LHC. (LEB 1999)

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review2 RD49 motivation + objectives Situation in 1997: Rad-hard ASIC technologies were: Expensive (small-volume, hi-rel military & space markets). Disappearing rapidly (end of cold war). Not qualified for LHC radiation levels (except DMILL). Unreliable (low yields, run-to-run variability). RD49 was launched to: Study deep submicron (DSM) approach for rad-tol ASICs. Select a single DSM technology for LHC. Develop demonstrators of LHC-type ASICs.

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review3 RD49 - achievements Proved rad-tol design method. Extreme TID hardness, good SEE immunity. IBM 0.25  m CMOS process selected. Frame Contract for LHC (12 MCHF, until Q4 2003). Export license (USA, EU, Canada, Japan). Support by CERN & RAL (Design kit, library, MPW). LHC baseline designs ( from RD49 demonstrators) 10 authorized “design centres”. (CERN, RAL, INFN, IN2P3, PSI, Heidelberg, FNAL, LBL, UPenn, Columbia) Pixels, APV25, Pascal, GOL, and many more.

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review4 RD49 - what next ? RD49 completed. all R&D objectives surpassed. New common project: Support 0.25  m technology access for LHC. Prepare for obsolescence of 0.25  m process. R&D for future experiments?

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review5 RD49 review – objectives (1) Review support of IBM 0.25  m process: Design kit and rad-tolerant library Rad-soft commercial library Technical and commercial interface to IBM Organization of Multi-Project Wafers (MPWs) Legal issues (restrictions, export licences, etc.) Manpower for support

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review6 RD49 review – objectives (2) Review requirements of expts Baseline LHC programmes: Volumes, procurement schedules, etc. LHC luminosity upgrade & other expts Extreme rad-hardness (e.g. NA60 beamscope) => cryogenic strips --> cryogenic electronics. Low-cost, large-area pad/pixel detectors => R&D on monolithic architectures. (integrating detector on electronics wafer)

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review7 RD49 review – objectives (3) Scenarios for handling future obsolescence of IBM 0.25  m process: IBM frame contract is valid until Q Extensions negotiable (in principle) but: Uncertain life-time of 0.25  m process. HEP is a very small “customer” (or disturbance?) LHC procurement strategies (Buy and store spares. How many?) Set up rad-tol support for a next-generation technology. Criteria for selecting and evaluating next technology. Estimate required resources (manpower, CAE, test equipment). Review challenges and define demonstrators (e.g. large dynamic-range analog circuits in 1 volt technology) Lead time to support a new technology ~ 3 years ?

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review8 COTS motivation + objectives Before ~1999: COTS risks were poorly understood: No risk management strategies. No (or inappropriate) qualification procedures. Preparing production with unqualified components and sub-systems. COTS common project (LEB 1999): Raise awareness of COTS risks. Coordinate effort for selection, qualification, procurement. => Created network:Faccio (RD49), Dentan (Atlas), Stefanini (CMS), Christiansen (LHCb), Formenti (Alice), Rausch (machine)

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review9 COTS achievements Raising awareness COTS workshops; external consultants (Space). One-week Technical Training course. SEE threshold & cross-section measurements made => predictions of SEE rates in ATLAS/CMS. Coordination and sharing of effort ATLAS policy on radiation-tolerant electronics. CMS COTS test protocol (muon boards). Elec. System Reviews consider COTS. Coordination of irradiation runs (Cyclone, Prospero, Pagure). CERN COTS database (sharing test results). “Missing” COTS (voltage regulators) => common spec & development with industry

M. Letheren, LECC 1 June 2001; Status of RD49 and COTS; objectives of one day review10 COTS review - objectives Review and summarize: Qualification procedures. Irradiation facilities. COTS database (CERN and external) Procurement procedures (e.g. qualified lots). Review status of Voltage Regulators: Prototype performance Specs. Versus requirements Required volumes Procurement plans