Presentation is loading. Please wait.

Presentation is loading. Please wait.

An·ec·dote /ˈanikˌdōt/ Noun A short and amusing or interesting story about a real incident or person LBL - May 31,2013Support for uT at CERN - A. Marchioro1.

Similar presentations


Presentation on theme: "An·ec·dote /ˈanikˌdōt/ Noun A short and amusing or interesting story about a real incident or person LBL - May 31,2013Support for uT at CERN - A. Marchioro1."— Presentation transcript:

1 an·ec·dote /ˈanikˌdōt/ Noun A short and amusing or interesting story about a real incident or person LBL - May 31,2013Support for uT at CERN - A. Marchioro1

2 Technologies used in ISSCC papers 2007/2013 A.M. - INFIERI School/Oxford 20132

3 Support for  Technologies at CERN HEPIC 2013 A. Marchioro CERN/PH-ESE

4 Topics History of technology support at CERN Status of the contract and support model – 65nm Commercial and Legal aspects 65 nm Technical aspects IPs in development Collaboration model Continuation of 130 nm support Support for uT at CERN - A. MarchioroLBL - May 31,20134

5 130nm MPW activity CERN participates on MOSIS MPW runs (4 runs/year) and organizes ad-hoc MPWs with the foundry for volume and/or area demanding prototyping. CMOS8RF-DM (3-2-3) is the “regular” metal stack option. Prototyping and Engineering run costs are stable and valid until 2015. LBL - May 31,2013Support for uT at CERN - A. Marchioro5 Production runs not included

6 15 years of foundry support Two reasons for concentrating support on single foundry/process: – The effort required for the RT qualification and support of modern technologies is substantial The effort involved with the RH aspects qualification did not allow for more than two suppliers, one of which was soon dropped – The CERN procurement mechanism is administratively heavy and favors single suppliers Our volume is of little relevance for most foundries but quality support is vital for some non-standard designs A very substantial effort has been necessary to guarantee access of RT ASICs to most HEP players Support for uT at CERN - A. MarchioroLBL - May 31,20136

7 New Commercial Contract Proposal for new foundry contract submitted to CERN FC and approved on March 20 – About same value as previous contract (for both 65nm and new 130nm) – 5 Years – (Current 130nm contract still valid until 2015) Contract details (delivery terms, guarantee, shipping costs, applicable law, etc. etc.) being finalized with IMEC Expecting contract signature by mid-Summer Export conditions could be similar if not identical to the ones with previous foundry – i.e. no “free” circulation of these chips!!! Support for uT at CERN - A. MarchioroLBL - May 31,20137

8 Legal aspects New foundry has “special” confidentiality culture Foundry is now willing to adapt NDA conditions to HEP clients – New procedure requires new NDAs to be issued to all users by IMEC This was already done with Cadence to allow CERN/Cadence/IMEC to work on new design kit Details for extension to all HEP Institutes being finalized with IMEC Support for uT at CERN - A. MarchioroLBL - May 31,20138

9 Technical Aspects (1) Design Kit – Porting on Cadence OpenAccess with flow similar to old 130nm is being done by Cadence (Paris + US) – First release expected for May Result to be qualified and tested at CERN by CERN with demo design – Includes one flavor of digital cells (to be analyzed and eventually slightly modified) from foundry Library, but no RT IO cells Not clear if we can have more than one! Modified library must be returned (and will continue to be owned by the foundry) – CERN has investigated usage of library characterization tool (Altos) but results are still controversial (most cells match data from foundry, others seem to be wrong) – Training courses for new flow to be scheduled from the Summer Support for uT at CERN - A. MarchioroLBL - May 31,20139

10 New M/S Design Kit LBL - May 31,2013Support for uT at CERN - A. Marchioro10 Foundry PDK (on OA) STD Cells Lib + IO Cells (on CDB) Scripts & Flows M/S Kit (on OA) A D M/S Kit (on OA) A D

11 Technical support and distribution model for new foundry FoundryIMECCERN Institute A University B … Lab Z LBL - May 31,2013Support for uT at CERN - A. Marchioro11 First training on new flow to be organized at CERN – Later, to be seen

12 Orders for MPW and Production runs FoundryIMECCERN Institute A University B … Lab Z LBL - May 31,2013Support for uT at CERN - A. Marchioro12 Dedicated admin contact person assigned in CERN-ME All deliveries to CERN (MPW and productions runs), re- shipped from Geneva

13 Warning Normal 65nm MPW runs from the new foundry allow for all process options and splits at a fixed price. Designers tend to like these! Some of these options are very expensive in actual productions runs and people are very surprised when the bill is presented. LBL - May 31,2013Support for uT at CERN - A. Marchioro13 WARNING

14 Technical Aspects: IPs Regular foundry SRAM generator are not suitable for radiation environment Specifications for Hardened SRAM prepared by CERN Three companies contacted and qualified for providing RadTol SRAM generator – Three offers received Winners to be announced soon – First phase of work to start with CERN-WP1 funds by the summer – Expected first delivery for Q1’14 IPs to be distributed for a fee Support for uT at CERN - A. MarchioroLBL - May 31,201314

15 Technical Aspects: IPs Slow 12-bit, 65nm monitoring ADC: – 4 companies contacted, one selected – Work started with company that provided the 130nm slow ADC cell – Architecture is simple Wilkinson (identical to old DCU in CMS) with improved offset cancelation scheme – Project is funded and delivery expected Sep ‘13 – Submit proto by Q4 ‘13 IP available to everybody in community for a small fee Support for uT at CERN - A. MarchioroLBL - May 31,201315

16 Technical Aspects: IPs CMOS IO Pads – Thick-oxide free minimal library with CMOS 1.2V levels and robust ESD structures compatible with design kit using core only devices – Technical details specified in a document by CERN – Specialized subcontractor identified To be executed in 2 nd ½ of 2013 – Project paid for by CERN – Available to users in HEP community for small fee Support for uT at CERN - A. MarchioroLBL - May 31,201316

17 Technical Aspects: IPs PLL for generic applications Specs: – Clock multiplier (40MHz -> 1.6GHz) – Low Power (< 5 mW) – Try SEU robustness through TMR – Offers in hands from three design houses – Typical PLL-IP cost: 35K-60K – Access cost for multi-use to be negotiated and paid for by end-user Support for uT at CERN - A. MarchioroLBL - May 31,201317

18 Technical Aspects: IPs Bandgap reference cell – This cell eventually necessary for all analog designs – Based on experience gained with multiple BG 130nm submission Design to start at CERN in July with EU-Aida funds Submission in November ‘13 – Small funds necessary for proto-chip To be included in IP library for a small fee LBL - May 31,2013Support for uT at CERN - A. Marchioro18

19 Reminder: Bandgap Results in 130 nm 7 Circuits submitted of 4 types Some diode based, some PMOS based Temp stability < 2mV from -20 to 30 deg C Supply stability < 5 mV from 1.0 V to 1.6 V Irradiated to 200 Mrad – Irradiation results not too impressive Neutron irradiation still to be done New structures to be tried in a new run LBL - May 31,2013Support for uT at CERN - A. Marchioro19 A B C D New 0.599 0.608 0.598 Delta_after_Irradiation 0.035 0.037 0.038 0.028 Delta_after_Annealing 0.018 0.017 0.033 0.016

20 Other IP blocks necessary High Speed SLVS cells Optimized STD cells library for pixels? – Characterization and library inclusion I/O Pads optimized for usage with TSVs I/O Pads optimized for bump-bonding Specific CAE tools – working on an early power estimation tool for digital … RT to extreme TID and high flux hadrons validation – Test structures are available – Should this tech not be sufficient for extreme levels, it may require some hard re-thinking of some current projects… Support for uT at CERN - A. MarchioroLBL - May 31,201320

21 Design style Old foundry accepted many violations to the sacred rule-book New foundry will accept NONE! LBL - May 31,2013Support for uT at CERN - A. Marchioro21

22 Collaborations on IP blocks Attempts to share IP blocks between HEP Institutes on voluntary basis have FAILED Perhaps we should be looking at market-driven, self-interest based incentives to stir people to provide what they have made Various proposals could be discussed (outside of this meeting) Support for uT at CERN - A. MarchioroLBL - May 31,201322

23 130 nm second source Prices from new foundry is lower than current prices No sign that old foundry will discontinue supplying CERN Design kit to be re-spinned by Cadence Design Services after work on 65 nm will be completed – Funds are available – Distribution will be free Introduction and distribution for users in Q4 ‘13. – Possibly new training courses to be organized Support for uT at CERN - A. MarchioroLBL - May 31,201323

24 Conclusions CERN is committed to continue foundry support for HEP community for new CMOS generation and also for alternative of the current one – 65nm full support model to converge in second part of ‘13 Some delicate export issues still pending IMEC to become official HEP interface to foundry LBL - May 31,2013Support for uT at CERN - A. Marchioro24

25 SPARES LBL - May 31,2013Support for uT at CERN - A. Marchioro25

26 IP Market LBL - May 31,2013Support for uT at CERN - A. Marchioro26

27 What should a “good” IP block contain Schematic and layout on Cadence DB – Or at least what is necessary to simulate the block within application, pass DRC and LVS Documentation on how-to use Minimal initial support (t.b.d.) No change allowed, if any change necessary, ad-hoc negotiation with creator is required Support for uT at CERN - A. MarchioroLBL - May 31,201327

28 How to charge for IP blocks Several schemes are possible: – Pay once for multi-use – Pay once for single-use – When: At block delivery At submission – How Institute to Institute billing Through common “bank” Our community is complicated by the fact that some project are co- developed by several Institutes but results in a single GDS – Who own such designs? – Who should pay for the IPs? Support for uT at CERN - A. MarchioroLBL - May 31,201328


Download ppt "An·ec·dote /ˈanikˌdōt/ Noun A short and amusing or interesting story about a real incident or person LBL - May 31,2013Support for uT at CERN - A. Marchioro1."

Similar presentations


Ads by Google