Current WGISS/CEOS GEO Tasks and Actions Pakorn Apaphant May 11, 2009 WGISS 27 Toulouse, France.

Slides:



Advertisements
Similar presentations
Page 1 GEO/CEOS-SIT Call to Action Ken McDonald WGISS Vice-Chair.
Advertisements

Natural Disaster Management Project Pakorn Apaphant/Hiromichi Fukui Project and Application Subgroup Proposed to WGISS 23 Hanoi, Vietnam May 21-25, 2007.
WGISS WGISS Plenary: Purpose and Expected Outcomes for WGISS-27 Martha E. Maiden CEOS WGISS-27 Toulouse, France May 11, 2009.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
Makoto Kajii SIT Chair 2010 – th Annual Report on CEOS Implementation of the GEOSS Space Segment Agenda Item accomplishments and lessons.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 Report on Report on CEOS Plenary (Nov. 2005) Ivan PETITEVILLE.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Executive Officers Report Agenda Item 17 Timothy Stryker CEOS Executive Officer Kerry Ann Sawyer.
CEOS Plenary Meeting Lucca, Italy November 8-9, 2011 CEOS Systems Engineering Office (SEO) Annual Report Brian Killough NASA Agenda Item #18.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
CEOS Systems Engineering Office (SEO) Report Brian Killough, CEOS SEO, NASA Agenda Item # rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 Accomplishments and Challenges 2012 ….. report from the chair Kiran Kumar.
WGISS Way Forward on GEO Actions Pakorn Apaphant October 2, 2009 WGISS 28 Pretoria, South Africa.
CEOS WGISS Status: Report to Plenary Martha E. Maiden, Chair Pakorn Apaphant, Vice-Chair George, SA November 11-12, 2008.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitch Goldberg.
Data Democracy Pakorn Apaphant May 11, 2009 WGISS 27 Toulouse, France.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
CEOS Disaster Risk Management Implementation Phase Status Ivan Petiteville (ESA) on behalf of CEOS DRM Team CEOS SIT-28 Meeting Hampton, Virginia, USA.
CEOS Strategy for Carbon Observations from Space – Report of Implementation Study Team Stephen Briggs ESA CEOS Plenary, Agenda Item 21 Tromsø, Norway
CEOS Deliverables Pakorn Apaphant WGISS 28 September 28, 2009 Pretoria, South Africa.
WGISS Disaster Management IG Lorant Czaran, UNOOSA Pakorn Apapanth, Natalia Kussul, Guoqing Li May 14, 2009 WGISS 27 Toulouse, France.
Anticipated Outcomes from CEOS WGs in 2010 Strategic Discussion on what the WGs should seek to achieve 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Slide: 1 CEOS SDCG-3 Meeting|Sydney, Australia| 7-9 February 2013 Space Data Coordination Group Land Surface Imaging Virtual Constellation Ake Rosenqvist,
CEOS Working Group on Calibration and Validation (WGCV) Report Agenda item: 17 Presented by: Pascal Lecomte.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
Status of Current WGISS GEO Tasks and Actions Satoko Horiyama MIURA JAXA Mission Operation System Office of Space Mission Application Directorate (MOSS)
WGISS Way Forward on GEO Actions Pakorn Apaphant May 15, 2009 WGISS 27 Toulouse, France.
CEOS Working Group on Education, Training and Capacity Building (WGEdu) Report to Plenary 2009 Gordon Bridge, outgoing Chair 1 23 rd CEOS Plenary I Phuket,
CEOS Publications & Outreach 1) Newsletter and Brochure 2) CEOS High Profile Doucment CEOS Plenary Doc. 29 Satoko Miura Pakorn Apapant 1 23 rd CEOS Plenary.
WGISS-GEO Session (Cont’) Pakorn Apaphant February 27 th, 2007 The 25 th WGISS Plenary, Sanya, China.
2010 WGISS Expected Outcomes Matha Maiden and Pakorn Apaphant Oct 2, 2009 WGISS 28 Pretoria, South Africa.
Overview of CEOS Virtual Constellations Andrew Mitchell NASA CEOS SIT Team / WGISS NASA ESRIN – Frascati, Italy September 20, 2013 GEOSS Vision and Architecture.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
CEOS Strategic Implementation Team (SIT) Report 2009 Accomplishments and Lessons Learned Agenda Item 9 Mary Kicza SIT Chair NOAA 1 The 23 rd.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
CEOS WGISS Status: Report to Plenary Martha E. Maiden, Chair Pakorn Apaphant, Vice-Chair Phuket, Thailand November 3 - 4, 2009.
WGISS/CEOS in Support of GEOSS Pakorn Apaphant Sep 28, 2009 WGISS 28 Pretoria, South Africa.
Natural Disaster Management Project Pakorn Apaphant Project and Application Subgroup WGISS 24 DLR, Oberpfaffenhofen, German October 15-19, 2007.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
WGCV Report and Actions Pascal Lecomte – Chair Greg Stensaas – Vice chair Marie-Claire Greening - Secretariat 1 23 rd CEOS Plenary I Phuket, Thailand I.
The Global Earth Observation System of Systems (GEOSS) must deliver timely, quality, long- term, global information to meet the needs of its nine societal.
Calendar November 2009 – November 2010 Agenda item: 28 Presented by: Hilcéa Ferreira (INPE) 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
WGISS Response to CEOS Actions Assigned to WGISS Richard Moreno CNES – WGISS chair WGISS-40 Harwell – United Kingdom 28 th September 2015 Committee on.
September, 2008 TASK DA Data Quality Assurance Strategy GEO Task DA-06-02: “This task is led by CEOS and IEEE” GOAL: “Develop a GEO data quality.
U.S. Department of the Interior U.S. Geological Survey LSI Constellation Portal Project WGISS #26, Boulder, Colorado, USA September, 2008 Lyndon R. Oleson.
Page 1 WGISS Response to GEO/CEOS-SIT WGISS-22 Updates Ken McDonald WGISS/Vice-Chair.
2010/11 SIT Chair Vision and Goals Makoto Kajii Japan Aerospace Exploration Agency 1 The 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
SIT-27 Meeting La Jolla, CA, USA March 26-28, CEOS Priorities for 2012 Timothy Stryker CEOS Executive Officer.
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
WGISS 29, Bonn, Germany May 17-21, Pakorn Apaphant, Ph.D. May 17, 2010 WGISS 29, Bonn, Germany WGISS29 Purpose and Expected Outcomes.
WGISS Recommendations to WGISS – Applications Subgroup Karen Moe WGISS Applications Subgroup Chair WGISS-28 Pretoria, South Africa 2 October 2009.
WGISS Recommendations to WGISS – Applications Subgroup Karen Moe WGISS Applications Subgroup Chair WGISS-29 Bonn, Germany 21 May 2010.
PROJECTS & APPLICATIONS SUBGROUP
Introduction to WGISS For GEO ADC
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
WGCV Work Plan Actions K. . Thome NASA WGCV Plenary # 43
WGCV Chair’s Report K. Thome NASA WGCV Plenary # 44
Action Item Status / CEOS Work Plan Status
WGISS Connected Data Assets April 9, 2018 Yonsook Enloe
Carbon Actions for WGCV
LSI-VC Work Plan Updates
Committee on Earth Observation Satellites
WGCV Work Plan Actions K. Thome NASA WGCV Plenary # 44
WGCapD Perspectives of Work Plan –
WGISS Connected Data Assets Oct 24, 2018 Yonsook Enloe
CEOS Working Group on Climate (WGClimate)
Presentation transcript:

Current WGISS/CEOS GEO Tasks and Actions Pakorn Apaphant May 11, 2009 WGISS 27 Toulouse, France

2009 Priorities of CEOS Chair “ Continuity of excellent progress towards GEOSS space Segment implementation ” ……

Topics CEOS Actions in support of the GEO Work Plan Actions to WGISS/CEOS CEOS Tangible Outcomes Guidance to subgroups

CEOS Actions in support of the GEO Work Plan

CEOS-GEO Remapping Meeting Dec 3-4, 2008, Geneva The identification of 16 tasks/sub-tasks that CEOS is co-leading 54 tasks/sub-tasks that CEOS and/or its agencies could potentially contribute to It is very important to showcase CEOS actions and activities in support of GEO Space agency logos where they are supporting GEO will be included

2nd CEOS-GEO Remapping Workshop, Jan 27-28, 2009, Silver Spring CEOS GEO Worktable questionnaires CEOS GEO Action Table Nearly hundred Actionable actions WGISS involves in 8 actions Leading 4 actions Cooperate with WGCV 2 actions (PoC to be identified) 2 Health SBA actions to be discussed (PoC to be identified)

The priority classification rule Category 1 CEOS Actions addressing one of the top priority from GEO SEC or a GEO Task led by CEOS Action either completed or with significant outcomes to be delivered at the latest in October 2009 Category 2 CEOS Actions addressing one of the top priority from GEO SEC or a GEO Task led by CEOS in terms of outcomes, does not fall in category 1 Category 3 CEOS Actions not addressing one of the top priority from GEO SEC or a GEO Task led by CEOS Action either completed or with significant outcomes to be delivered at the latest in October 2009 Category 4 CEOS Actions not addressing one of the top priority from GEO SEC or a GEO Task led by CEOS in terms of outcomes, does not fall in category 1

SIT 23 March 4-5, Cocoa Beach Categorize the CEOS actions Agency Commitments to Actions in category 1 and 2 Development of CEOS 2009 Tangible Outcomes for GEO, G8, and UNFCCC Monthly Telecon with the CEO

Actions to WGISS/CEOS

10 AR-09-02a_30: Virtual Constellations Identify requirements and implement a prototype ACC portal for evaluation and eventual use by the ACC, GEOSS and other AC user communities CEOS Action Category:2 Lead Agency: NASA Participating Agencies: N/A Constellation: ACC Working Group: WGISS POC: Stefan Falke Deliverables: 15 May 09: Initial ACC portal requirements/ design. 15 Sep 09: ACC portal prototype. 18 Nov 09: GEO-6 demo of prototype 31 Dec 09: Plans for portal governance / maintenance.

11 DA-09-01b_2: Data, Metadata, and Products Harmonization Establish a WGISS project to focus its contributions to the subject task and to generate those contributions. The first deliverable of the GEO task is an Assessment of Current Capabilities CEOS Action Category:1 Lead Agency: NOAA Participating Agencies: N/A Constellation: N/A Working Group: WGISS, WGCV POC: Ken McDonald Deliverables:May, 2009: Form WGISS project June, 2009: Develop assignments for assessments Sept. 2009: Complete draft inputs to Assessment Report

12 DA-09-03d_3: Global DEM Update ICEDS information server to provide OGC-compliant access to ASTER 30m DEM data (when it becomes available), together with localized validation DEM data and associated quality information (e.g. gap locations; number of ASTER observations per pixel, etc.). CEOS Action Category:1 Lead Agency: UCL/BNSC Participating Agencies: METI, NASA Constellation: N/A Working Group: WGISS, WGCV POC: JP Muller (Wyn Culip for WGISS) Deliverables:Update ICEDS information server to provide OGC- compliant access to ASTER 30m DEM data (when it becomes available), together with localized validation DEM data and associated quality information

13 DI-06-09_7: Use of Satellite for Risk Management Analyze the response by WGISS members to supply near real-time data to the response agency. Develop a working process model to integrate and make use of existing technologies within WGISS/CEOS. Implement a prototype to demonstrate use of these integrated technologies for the process model for the earthquake scenario. CEOS Action Category:2 Lead Agency: UNOOSA GISTDA Participating Agencies: NSAU, NRSCC Constellation: N/A Working Group: WGISS POC: Lorant Czaran Pakorn Apaphant Deliverables: April 30, 2009 – Working Process to be developed June 30, 2009 – Testing the model September 30, 2009 – Working Process defined at WGISS 28 November 2009 – Document and include in WGISS Report at the CEOS plenary

14 DA-09-01a_10: GEOSS Quality Assurance Quality Quality Assurance Framework for Earth Observation (QA4EO) Implementation CEOS Action Category:1 Lead Agency: ESA/USGS Participating Agencies: CEOS Agencies Constellation: ACC, LSI, OCR, OST, OSVW, PC Working Group: WGCV, WGEdu, WGISS POC: Pascal Lecomte/Gregory Stensaas (?? WGISS) Deliverables: May 09: Work with CEOS WGISS on Cal/Val data access Jun 09: Develop and initiate an implementation plan for QA4EO Sep 09: Organize a community workshop to address implementation of QA4EO Nov 09: Establish outreach activities to promote QA4EO within the user community

15 DA-09-01a_11: GEOSS Quality Assurance Quality CEOS Reference Test Site Data Collaboration and Comparison CEOS Action Category:1 Lead Agency: BNSC/NPL USGS ESA NOAA Participating Agencies: N/A Constellation: N/A Working Group: WGCV, WGISS POC: N. Fox, G. Chander, P. Goryl, and C. Cao (??? WGISS) Deliverables: Jun 09: Work with WGCV Subgroup leads to initiate dialogue with instrument owners relating to the collection of calibration data over CEOS-endorsed sites. Aug 09: Ensure collaboration and coordination for the evaluation of the data and the development of the results over comparative sites as a prototype for an operational EO calibration network. Nov 09: Peer-review the results and post them on the Cal/Val portal. May 10: present information via CEOS/GEO venues. May 10: Publish significant results.

16 HE-09-01_1: Information System for Health Develop a long-term plan to support critical space-based imagery to support modeling, forecasting and monitoring of health issues. CEOS Action Category:4 Lead Agency: CNES Participating Agencies: GEO, UNOOSA, WHO, GMES Constellation: N/A Working Group: WGISS POC:Murielle Lafaye (??? WGISS) Deliverables: Jul 7-9, 2009: Workshop at WMO in Geneva, Prepare a plan of implementation Nov 2010: Earth Observation Handbook for health

17 HE-09-01_2: Information System for Health Demonstrate a global smoke plume and dust forecasting product (IDEA) using multiple satellites and trajectory models for air quality health hazards CEOS Action Category:3 Lead Agency: NASA Participating Agencies: NOAA, ESA, EC, WMO Constellation: ACC Working Group: WGISS, WGEDu POC:Jack Fishman (??? For WGISS) Deliverables: COMPLETE - Developed automated software to acquire, synthesize, create forecast products, and visualize aerosol observations from multiple satellite sensors. COMPLETE - Conducted initial demonstration of prototype aerosol/smoke forecasting products in near-real-time during the 2008 NASA ARCTAS and NOAA ARCPAC field missions. IN PROGRESS - 48hr automated aerosol forecasts have been archived for statistitical analysis. Aeronet aerosol optical depth measurements have been acquired for forecast verification.

CEOS Tangible Outcomes

Troika ’ s Focus The 2009 CEOS Troika agencies have proposed that CEOS efforts for the time period focus on demonstrable Deliverables Consistent with charges and priorities identified by GEO, its Plenary and Ministerial; by G8; and by UNFCCC. Such Deliverables would include, for example enabling access to key products and datasets providing information systems and services to exploit data important new climate data records

Potential key Deliverables associated with CAT 1 and 2 Tasks will be outlined in a document. Other Deliverables may materialize from the over 80 CEOS -GEO actions In connection with Action from SIT Meeting, the SIT Chair, with involvement of the CEOS Executive Officer (CEO), has begun to collate a list of proposed Deliverables for review by the CEOS Chair and Troika Members to be subsequently shared by the CEOS Chair with all CEOS Agencies. CEOS will then coordinate these Deliverables, as appropriate, with GEO, the G8, and UNFCCC A living Document until end of May 2009

Areas of interest Forest Carbon Tracking Global Monitoring of Greenhouse Gases from Space Climate Change Data Sharing GEOSS Quality Assurance Strategy Capacity Building for Water Resource Management: Africa CEOS Virtual Constellations for GEO Global Sea level rise Management of Energy Sources Global Digital Elevation Model (DEM): CEOS Handbook 2008 and the CEOS Mission, Instruments and Measurements (MIM) Database 2009:

Deliverable: Climate Change CEOS Climate Diagnostics Portal available via the CEOS International Directory Network: WGISS will make available metrics, such as the number of visualizations available, the number of visits to the site, etc. Deliverable: Data Sharing Portal for Mid-Resolution Optical LSI Satellite System Information and Enhanced Data Access (Metrics on content and usage can be made available) WGISS can deliver Best Practices including Wenchuan Earthquake experience and flood monitoring sensor web capability, and lessons learned and recommendations for data sharing for disaster mitigation. Deliverables: VCs for GEO The Atmospheric Composition Constellation (ACC) will establish a portal for atmospheric composition data to provide access and user-friendly tools for the chemistry climate community (in collaboration with WMO and hosted by DLR) The Land Surface Imaging (LSI) Constellation will facilitate application of radar data to GEO task on Forest Carbon Tracking and promote operational polarimetric SAR systems

Guidance to subgroups

Action Progress report and update Candidate List of tangible outcomes Recommendation Actions and PoCs for WGISS to DA-09-01a_10 DA-09-01a_11 HE-09_01_1 HE-09_01_2