John Coughlan Tracker Week October 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web 0 FED Status Production Status Acceptance Testing.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

John Coughlan et al.Rutherford Appleton Laboratory14th May 20023rd CMS Electronics Week Tracker Front-End Driver Progress Report 3rd CMS Electronics Week.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Questionnaire Response
Tracker Strip and Pixel FEDs John Coughlan Tracker Readout Upgrade Meeting September 12 th 2007.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
CMS Annual Review September 2004Geoff Hall1 Tracker Off-detector Electronics On-detector electronics production approaching completion procuring spares.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Instrumentation Department John Coughlan Rutherford Appleton Laboratory14 November 2002 CMS Tracker Readout Effort Requirements in Instrumentation Department.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
J. Coughlan et al. 1st October 2003 LECC 2003 Amsterdam The CMS Tracker Front-End Driver 9 th Workshop on Electronics for LHC Experiments Amsterdam J.A.Coughlan,
Status of NA62 straw electronics Webs Covers Services Readout.
Tracker Week 11th February CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Tracker Week 21st April CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK.
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
TEL62 update Franco Spinella INFN-Pisa 28/3/2012 CERN- TDAQ WG.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
M. Adinolfi – University of Oxford – MAPMT Workshop – Imperial College 27 June Status of the PINT chip M. Adinolfi University of Oxford.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – TOTEM Front End Driver VME64x Host Board OptoRX Firmware.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Integration with ATLAS DAQ Marcin Byszewski 23/11/2011 RD51 Mini week Marcin Byszewski, CERN1.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Production Firmware - status Components TOTFED - status
VELO readout On detector electronics Off detector electronics to DAQ
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
University of California Los Angeles
Front End Driver (FED) Crates and Racks +Tracker PSU racks
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

John Coughlan Tracker Week October FED Status Production Status Acceptance Testing

John Coughlan Tracker Week October FED Production Summary 1 st batch of 50 FED boards are almost all at RAL 2 nd batch of 50 at test at Assembly Plant, many already at RAL. 3 rd batch of 50 in production in progress. Board Quality of boards at RAL is good and is improving as we iron out minor faults. Test Crates & Software at Assembly Plant are working very well. 40 FEDs sent to CERN last week + 70 SLINK 6U VNE Transition cards at CERN already (to be tested with final DAQ link before completing production).

John Coughlan Tracker Week October Stage 1. Testing at Assembly Plant First Stages of Test are done at Assembly Plant. After standard Assembly QA procedures. Carried out by trained Assembly Plant Operatives using RAL/Imperial Test Equipment. 1. LHC Crate with Boundary Scan Test – For Digital circuitry incl BGAs 2. LHC Crate with Custom VME Test – For Analogue circuitry History of Test Results are stored in HTML files. Summary stored in EPROM on FED. LabView over Std FED Software

John Coughlan Tracker Week October FED Testing OptoRx VME 34 x FPGAs Custom Analogue Test TTC JTAG Boundary Scan Test Throttle SLink 96 ADC channels

John Coughlan Tracker Week October Stage 2. Testing at RAL Using FED Tester units and SLINK FEDKits… ORx Input Test SLINK and VME Fast Readout Test Throttle signal Test TTC Test Timing Calibration Test Power full crate (16 FEDs) for 24+ hours. Water Cooling for Rack installed to run 16 FEDs. FED Testers 16 FEDs FED under Test SLINK FEDKit Transition Cards are at Rear

John Coughlan Tracker Week October Testing so far… 1 st Batch of 50 FEDs received at RAL… Assembly Plant Tests: Company needed RAL help with ~ 6 boards. Others identified and corrected with minor repairs; solder bridges, couple ADCs replaced. 2 boards had a BGA rework. Quality of boards received at RAL is very good. Assembly testing has weeded out previous faults. Few minor issues, couple of dry joints, led wrong way round, missing air deflectors, TTC couplers. 2 boards replaced 1.5V DC converter, power up problem. Under investigation. Remaining 4 boards failing RAL acceptance Tests: No common failures. e.g. 1 with bad TTC ; 1 SLINK errors ; 1 warped board ; 1 no ORx channel ouput None of which would expect to find at Assembly test. Concerns: One LHC Final Crate Power Supply blew. But no FEDs were damaged. Long lead time on Xilinx FPGA ACE controller chip (~150 in hand, alternative sources being investigated).

John Coughlan Tracker Week October FED Firmware Improvements VME Interface Firmware is working stably with CAEN VME bridge (new Driver for SMP). VME Block Transfer Read Speed increased. from ~ 6 MBytes/sec to ~ 14 MBytes/sec (using CAEN with 16 FEDs in crate) to improve much further we will need go to MBLT64 (Mux 64 bit transfers) Fake Events (Raw Data or Zero Suppressed) is working. “Zero-Suppressed-Lite” mode (minimal data volume) is working. Clock Skews to ADCs improved, now providing v. smooth 25 x 1 nsec steps. should help with timing calibration Next : Spy Channel with Frame Trigger

John Coughlan Tracker Week October Other Items Production boards are only intended for large scale Tracker commissioning and USC. 24 Pre-Series FEDs have been delivered to date for use in LSA / DAQ tests. Pre-Series are identical to Production boards. “Vertical Slice” Test. Test of Production FED with other Production Tracker/CMS Electronic systems needed. Stage 3. Acceptance testing at CERN 904. Test delivered FEDs in 904 crates. Aim to test and install: “FED + Transition card + SLINK Transmitter CMC” as unit ?

John Coughlan Tracker Week October Summary + 70 SLINK Transition cards at CERN Board production is progressing to plan. Good working arrangements between Assembly company and RAL Test effort. 40 FEDs delivered and a further ~ 20 FEDs ready to send.

John Coughlan Tracker Week October Spare Slides

John Coughlan Tracker Week October Close up

John Coughlan Tracker Week October ADC Clock Skewing Improved Presently

John Coughlan Tracker Week October Temperatures in Full Crate