Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.

Slides:



Advertisements
Similar presentations
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Advertisements

Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
::Manual of Construction::. MENU OF THE MANUAL 03 Cutting the panels 07 Straight duct 08 Elbow 10 End cap 01 Bases of the system 04 Type of strips 05.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
1 David Santoyo Petal Locking Points: AUW Nov 2014 Petal Locking Points.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
Advanced Scroll Ring. Designing the ring Decide on your pattern. You can do one from the previous slide, or you can come up with your own design. Determine.
Hybrid Integrated Circuit
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
The Construction of Vertical Evolution Nigel Howe.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
WP4 – Plans for next 6 months
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
L0 Module Testing and Analog Cable What we built so far: –No.3 First prototype with SVX4 (L1 hybrid) –No.4 with irradiated sensor –No.5 Installed on the.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Stave production.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Dec
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Dummy Modules The next step is to build and test 10 thermal modules for tests and distribution. What do we want to test? Thermal performance and variation.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Stave Tooling & Plans for Future Stave-building (Tim)
Stave Core Electrical Considerations Ned Spencer (UCSC), Sergio Diez (DESY), David Lynn (BNL) Local Support Assembly, AUW Nov
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
Ladder Assembly All tools and jigs produced Glue dispensing works
Are there better ways to build a stave?
status of the second field cage
Ongoing and to do work M.Lenti.
Module/Ladder Assembly
Presentation transcript:

Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015

Petal thermo-mechanical “project”  “Deliverables” at the end of 2016: 14 petal cores of several flavors, 2 of them thermo- mechanical and the rest for module mounting 23 Jan

Facings and bus tapes  Bus tapes at Liverpool, ready for co-curing  T. Jones merged.dxf files of bus tape with CAD files for facesheets: Found a 1.4 mm misalignment of locking point pin, which he was planning to use for alignment: Need to double check this again! Still go ahead for this round of petals? Edges of bus tape (>2 mm of Kapton will still make up for the misalignment. Cutting tool (at DESY) will get overall shape correct Not so much worried about bonding pads, only interested in the power lines for these prototypes 23 Jan

Honeycomb  Both CF and N636 honeycombs in hand at DESY  First petal in CF  Second petal in N636 Issues with N636 grinding due to epoxy content, also observed in the past by Liverpool Several companies even refused to do it!  Both the CF and N636 will be milled in-house at DESY (same approach as petalets) 23 Jan

Pipes  Tool for pipe bending manufactured and already used at DESY successfully  Pipes undergoing brazing of StSt fittings (did that already for the petalets)  Barely enough pipes for 5 petals, would join common order 23 Jan

High T conductivity foam  Allcomp foam in hand at DESY, enough for ~10 petals  Allcomp K9 130 ppi 0.23 g/cc, 20 W/m·K min (measured ~ 0.22 g/cc, 40 W/m·K by Allcomp on our piece)  Gluing of pipe into foam? Pre-sealing foam (BNL’s approach)? Follow petalet approach (glue dispensing with syringe on foam)? No strong preference from my side 23 Jan

E breaks  Will not be included for now 23 Jan

Top and bottom closeouts  Top and bottom closeouts already manufactured at DESY (4 sets)  Diameter for E break too tight! Caused some cracking in several samples Will adjust to 2.3 mm OD in next round, since E breaks will not be included  Slight bending on the longest part We still need to characterize the extent of it  Annealing of PEEK as suggested by our US colleagues  Simplified annealing procedure, since we don’t have a climate chamber (or an autoclave) that goes so high in T  Slowly increase T up to 149 and then to Jan

C-channels  CF C-channels already in hand, maufactured at Liverpool by T. Jones and L. Poley  Just received them, not yet characterized, but they look nice and flat  Were they measured in Liverpool?  Enough for 1 petal  Next set of C-channels to be manufactured in PEEK at DESY, any objections to that? 23 Jan

Locking points  Being worked out at Valencia, see David’s slides for details 23 Jan

Core gluing  Set of tool currently under manufacture or under design  Based on precision pins for alignment among them and the petal facesheets  In manufacture: Main base plate (+ lid) and mirrored base plate  All tools align against this one Top and bottom closeouts gluing tools Facing cutting tool  Finishing the design: Foam gluing tool HC gluing (if any) C-channel gluing tools  No clear solution for locking points gluing, manual procedure for now 23 Jan

Core gluing tools 23 Jan

Dummy sensors, hybrids, ASICs  Dummy sensors  6” (plain) wafers in hand next week at IMB-CNM (Barcelona)  Laser cutting undergoing final tests (straight cuts)  Sandblast cutting being investigated too  Dummy ASICs with heaters  Currently in fabrication at IMB-CNM, delivery in < 2 weeks  Dummy hybrids  A few R0 H1 hybrids already in hand at Freiburg  Tooling for R0 in manufacture at Freiburg  Given the delays due to the accident at the foundry, it doesn’t seem feasible to have all flavors in hand in reasonable timescale for TM  I suggest FR4 dummies once the design of all flavors is finished If agreed, should Zeuthen do it? 23 Jan

DCDC (power board) and EoP dummies  Manufactured in FR4  Status? 23 Jan

Open issues  Mechanical characterization of petal cores  Should we follow Valencia’s recipe from previous core (~2009)? Where? I would rather do it at DESY and Valencia I have to figure out if we have the necessary equipment at DESY  Thermal characterization  Figure it out soon Where? I guess DESY?  Assembly of dummies  Tools?  Manual? I guess this is the more realistic approach  Industry approach for petal core manufacture investigated at Valencia  Will need raw materials for that  DESY can provide N636 HC and (a bit of) Allcomp foam  Other materials? Joint order? 23 Jan