SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
1. In Accordance With : 2 Highest Level Lowest Level.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract E4 March 12, 2003.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
Presented by: Kathryn Hodges, NH
Utah’s Use of CMGC & Project Delivery
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
Alternative Project Delivery
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Case Study Water and Waste Water Infrastructure Northern Ireland.
California Department of Transportation District 11 - Internship Angela Inciong- SDSU Civil Engineer Tamina Akram- SDSU Civil Engineer.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
Financing Roads in Great Britain Peter Mackie and Nigel Smith Institute for Transport Studies University of Leeds.
ESTIMATING By Laith Jacob.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Jim Merrill, Welding Engineer, Law Crandell
Slide 1 Caltrans Bridge Construction Forum 2007 Bidding Process and Construction Environment Brian Mapel FCI Constructors Inc. Jeff Abercrombie California.
SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.
The American Recovery and Reinvestment Act of 2009 (ARRA) Federal Highway Administration Wisconsin Division January, 2010 Jason P. Spilak, PE, ARRA Engineer.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Office of Small Business Utilization U.S. General Services Administration GSA Mentor-Protégé Program Anthony “Tony” Eiland Program Manager.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
1 Cold Spring Canyon Bridge Proposed Suicide Barrier Project Information Meeting & Open House Sara von Schwind Caltrans Project Manager.
IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Constructability Workshop Nov. 20, 2002 In Bay.
Washington Suburban Sanitary Commission Small, Local and Minority Business Enterprise (SLMBE) Program.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
SFOBB East Span Seismic Safety Project Dan Ambuhl, Specifications Engineer, Caltrans.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-bid Meeting February 5, 2003.
Contractor Alternate Design Serving the Public’s Best Interest.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project.
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach January 7 & 8, 2003.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Office of Estimating 2015 OCA Leadership Forum.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Business Enterprise Outreach Program 2003.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Winton Emmett, Chief Project Implementation North January, 2016 Division of Local Assistance John Hoole, Chief Project Implementation South.
Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Washington Metropolitan Area District Office Purpose of MP Agreements: The purpose of the mentor/protégé relationship is to: 1. enhance the capabilities.
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
Holly Street Bridge Retrofit and Rehabilitation Project
Pre-Bid/Proposal Meeting
CONTRACT AWARD TO ALTA PLANNING AND DESIGN FOR CONSULTANT SERVICES TO CONDUCT SAFETY OUTREACH AND UPDATE THE SUGGESTED ROUTES TO SCHOOL MAPS FOR THE SAFER.
Light Rail Transit Project
Construction Oversight
FDOT Support Services Programs
FDOT Support Services Programs
2013 Nevada Transportation Conference
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
USFS Acquisition Mechanisms and Potential for Increased Local Contracting A Collaborative effort between USFS Region 5 and the Sierra institute for community.
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Project Development Quality Program QA/QC – What does ODOT need?
Procurement Planning Mani Ram Gelal
Presentation transcript:

SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project

SFOBB East Span Seismic Safety Project SAS Constructability Workshop Self-Anchored Suspension Span consists of a 160-meter single steel tower with a main cable and inclined suspenders supporting two steel orthotropic decks of a 385-meter main span and a 180-meter back span. The workshop will concentrate on identification of Constructability issues for the tower and orthotropic boxes.

SFOBB East Span Seismic Safety Project Participants Contractors that plan to bid SAS/YBI contract steel, fabrication firms that plan to submit estimates steel plate suppliers, and Caltrans Project Manager

SFOBB East Span Seismic Safety Project Purpose is to identify the capacity of the domestic steel market to produce plate steel for orthotropic boxes and tower what is fabricators ability to fabricate and transport pieces what affects contractors ability to bid the project due to the above issues

SFOBB East Span Seismic Safety Project Purpose is to identify contractors Constructability concerns concerns with the tower “pick”

SFOBB East Span Seismic Safety Project Constructability? a noun Constructibility?

SFOBB East Span Seismic Safety Project What can Constructability achieve? public and construction safety improvements cost reductions and enhanced quality improved and shortened project schedule

SFOBB East Span Seismic Safety Project Constructability Construction planning and Constructability analysis which integrates the diverse and quite often conflicting criteria into a coherent solution

SFOBB East Span Seismic Safety Project Constructability optimum use of construction knowledge and experience in planning, design, procurement & field operations to achieve overall project objectives (Caltrans Project Engineer Academy)

SFOBB East Span Seismic Safety Project Constructability bid process design - bid - build considered throughout project delivery up to award

SFOBB East Span Seismic Safety Project Constructability is consideration and resolution of barriers to bids open no bidders risk financing no materials or cost prohibitive materials environmental permitting

SFOBB East Span Seismic Safety Project Constructability is consideration and resolution of barriers to bids open are there responsible bidders is there a competitive bidding process bid process design - bid - build what do we do to make our PS&E package attractive to the bidder?

SFOBB East Span Seismic Safety Project SAS Constructability Workshop bids open January 2003, advertises September 2002, and open for westbound traffic in 2006

SFOBB East Span Seismic Safety Project where are we on May 13, 2002?

SFOBB East Span Seismic Safety Project BUY AMERICA WAIVER APPROVED BY FHWA Tower Saddle (Upper Portion) S-Wire Cable Wrapping MacAlloy Bars

SFOBB East Span Seismic Safety Project What are the necessary production rates for delivery of plate steel, fabrication, erection?

SFOBB East Span Seismic Safety Project lessons learned on other projects that might relate to Constructability of the tower and orthotropic boxes?

SFOBB East Span Seismic Safety Project What next use the roster to keep in touch keep up to date by webpages, dbe, tollbridge, office engineer bullets and power point presentations on toll web page BID IT, BUILD IT