San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project.

Similar presentations


Presentation on theme: "San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project."— Presentation transcript:

1

2 San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project

3 I-80 in San Francisco (5th St. to SFOBB West Anchorage) Project Limits I-80 Project Limits

4 Stage Construction Fremont St. First St. Essex St. Second St. Third St. Fifth St. Fourth St. Harrison St. Howard St. Folsom St. Beale St. Stage 1 18 Months Stage 2 10 Months0 Stage 4 10 Months Stage 5 12 Months Stage 6 6 Months Stage 3 10 Months Year 1 Year 2Year 3Year 4Year 5Year 6

5 Bridge Removal Sound Control Requirements Maintaining Traffic Order of Work Areas for Contractor’s Use Challenging Aspects of the Project

6 Water Pollution Control Measures

7 Erosion Control

8 Traffic Control/Striping

9 (continued)

10 Fencing

11 Bridge Removal

12 Piling

13 Steel Casings

14 Coring & Joint Seal Assembly

15 (continued)

16 Steel

17 Drainage

18 Electrical