Petalet-Stavelet; 13 July 2015. Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.

Slides:



Advertisements
Similar presentations
1 Liverpool Production Status Week of 23 February 2007.
Advertisements

Installation of. Congratulations for choose this GSM car alarm system for your car. Taking a few minutes to watch this Installation Guide and read the.
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
ATLAS Module building at Glasgow
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
David Nelson STAVE Test Electronics July 21, ATLAS STAVE Test Results Version 1 David Nelson July 21, 2008.
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
Configuring a PC. Installing the Mother board To Install the Mother board, fit it into the computer casing. You will then need to Insert 24 pin ATX power.
Getting started with Microsoft.NET Gadgeteer Comberton Village College Gadgeteer Club.
Important information & instructions for doing web upgrade :  User needs to backup all his data before doing web upgrade as the same will get deleted.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
Profitable Growth B3X Number one to the customer! GT540 Web upgrade Guide Important information & instructions for doing web upgrade :  User needs to.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
Guide Demo Program installation SOP ePAD SW PM. Before you start Check “Guide” version is latest ( or ) * follow next page Latest version.
Motherboard (Main board)
Setting up the Ricoh C305 Press F5 to start the Presentation
S Pyatt Dummy module with copper on glass sensor An adhesive tape has been identified that is suitable for dummy module building. This tape can be stuck.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
A division of The Logical Choice And they all rolled over, in SchoolLogic Al Pahl, Product Evangelist.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
21 Nov 2013 Juergen Thomas: ATLAS Tracker Upgrade: Hybrid Production and Test Setup at Birmingham 1 ATLAS Tracker Upgrade: Hybrid Production and Tests.
July 7/ SPC Tutorial 1 Washington WASHINGTON UNIVERSITY IN ST LOUIS A Smart Port Card Tutorial --- Distribution John DeHart Washington University.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
WP3_Bham; 10July 2014; John Wilson1 Gluing: more investigations (Simon and Sam) New clamping method provides a good base for systematic studies. Sketch.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
WP3_Bham; 29May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs the glue thickness is controllable. i)Room temp curing.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Andy Blue Glasgow Update. Andy Blue WP3 Strip Meeting Environmental Chamber Installed into cleanroom –Working on controlling scans via Ethernet connection.
WP3; 15 Jan 2015; John Wilson.1 Birmingham Update All back and operational after Christmas! Simon in contact with Dario Ariza at DESY re gluing (Boron.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
WP3_Bham; 15May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs i) Room temp curing the glue thickness is controllable.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
Bluetooth To RS-232 –One To One MACHINE PC One to one - plug and play, do not modify program Bluetooth -masterBluetooth -slave.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
→ need to guide UV light into gap; also beware temp effects
Glue curing studies (contd)
+ Steve Worm (since Monday)
ITK Strip Module Meeting; 12st October 2015
HIC Assembly - Liverpool
ATLAS ITK WP3 WP3 Bi-weekly meeting
Group meeting, 2nd Sept, 2013; JAW
Update from Birmingham
Quick Start Guide   Installation GM Pro 7.4 5/10/2019.
Presentation transcript:

Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil. Bleed but bond pads not affected. 2 nd hybrid glued successfully – no bleed. Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon ship. i)batch to batch variations? Storage problem? Surface contamination? ii)check bonder settings. Difficult to determine source + history of patterned glass but no indication of anything untoward. On 2nd hybrid, patterned glass ASICs cleaned with alcohol. Back to basics with bonder settings; test on 2 nd hybrid 1st two rows used to test/set up; rows 3+ 4 bonded well. With same settings, return to attempt rows 3 and 4 of “bad” 1 st hybrid. 11

Atlys+ABCN250-Hybrid at B'ham (1) (Juergen, AndyC, SimonH) John Wilson, Phil Allport, Simon Pyatt, Sam Edwards, Juergen Thomas, James Broughton, Kostas Nikolopoulos, Andy Chisholm, Simon Head 16 th July 2015, WP3 Meeting Now updated s/w on clean-room PC: We should be ok now ! -NMASK (sawtooth) works for whole hybrid (Birmingham-assembled Stave09, ‘B1_H6’) (see screenshot from 'ScanData') -Can do 'StrobeDelay(0.25) then 3PointGain(1fC)' test with all 20 chips ok (results on next slides) (Note: On Monday, we showed setup with second PC, outside clean-room, Liverpool hybrid ‘L1’, there can access one row with NMASK (10 chips) and run tests with 9 chips. One only partially responding chip (row 0 chip 6) marked by Liverpool)

Atlys+ABCN250-Hybrid at B'ham (2) (Juergen, AndyC, SimonH) John Wilson, Phil Allport, Simon Pyatt, Sam Edwards, Juergen Thomas, James Broughton, Kostas Nikolopoulos, Andy Chisholm, Simon Head 16 th July 2015, WP3 Meeting Main changes since last time: 1)Updated ITSDAQ s/w version to r3315 (built in MS VisualStudio10 Pro/Express) 2)Atlys ethernet connection: Clean- room PC has 2-ethernet PCI card fitted (one to HSIO, one to Atlys). Other PC changed to USB3.0- Ethernet dongle ('StarTech USB31000S‘, tip from RichardT), before was 2nd ethernet plug on PC mainboard. 3)No LVDS driver board 4)Short (15-30cm) cables used (some fitted with 3M connectors) 5)Always run ‘NoBCCSetup’ 6)Atlys f/w has been for a while the recommended: va056

Atlys+ABCN250-Hybrid at B'ham (3) (Juergen, AndyC, SimonH) John Wilson, Phil Allport, Simon Pyatt, Sam Edwards, Juergen Thomas, James Broughton, Kostas Nikolopoulos, Andy Chisholm, Simon Head 16 th July 2015, WP3 Meeting  Should be all-good with clean-room test system  Could run ABC130 hybrid when they become available (2/3 chips ?)  Second PC (outside clean-room, can access 9 chips on ‘L1’ hybrid): For testing s/w developments: Install ITSDAQ ‘trunk’, TortoiseSVN (also: as back-up machine). What happens when we go for Windows 10 ? No worries about second row of chips.  Some notes written during set-up, trying to prepare a Twiki page