QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
Dealer Certification Section 2: Building the Network Physical Planning & Documentation Power Sources & Distribution Voltage Drop Calculations Copyright.
INSTALLATION. PURPOSE To learn the basic steps of installing DS200 systems.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
1PPS Timing and Reference Distribution Subsystem Wes Grammer NRAO March 15-17, 2012EOVSA Preliminary Design Review1.
ZTF Interconnecting Scheme Stephen Kaye
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Electrical Considerations Eargle, Ch. 8 (partial).
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
Xbox-3 LLRF Ben Woolley Stephane Rey & Heiko Damerau.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Design and Fabrication of a Q-BPM Calibration Tone Generator for the ATF2 Ian Bullock August 14, 2008.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
‘Rig’ components Audio Amplifier/Speaker Stimulator DC Strain Gauge Amplifier AC Amplifier AM Amplifier Analog Oscilloscope Power Supply.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
© Nokia 1255_RF_Training / Jan 2006 / CFSCompany Confidential 1255 Technical Training RF Troubleshooting Presentation NMP-CDMA, San Diego Jan, 2006.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Tests of STO IF Components S. Weinreb April 15, 2009 Two 1-2 GHz IF amplifier plates and one 5 GHz converter plate for the Texas test flight have been.
V. Bobillier1 Cable installation status.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
NLC - The Next Linear Collider Project Nano beams in the ATF extraction line Marc Ross Linear collider challenges: Energy Emittance source Stability ATF.
Prototype Sensor Status and Measurements u Sensor Response Measurements u Mechanical Response u Noise Expectations u DAQ Status.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Broadcasting devices. Broadcasting devices overview USB Power Monitor, type channel, 4-line display, USB, Digital out, Opto out WEB Power Monitor,
WFM electronics Alexandra Andersson. F. Peauger – CTF3 committee – 11/02/10  Wakefield Monitors implemented in two accelerating structures TD24 (tank.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
30GHz system improvements Jan Kovermann RF meeting
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Mauro Citterio - Mi meeting
Cosmic Microwave Technology, Inc.
NSG 4070 Signal generator and immunity test system Dr. Heinrich
LAPP BPM Read-out Electronics
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
Christian Veelken last updated 11/09/06
The ELENA BPM System. Status and Plans.
MONITORING & METERING.
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
AM-7026 Down Converter-Receiver
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
CECOM LAR Operation Course
RPC Electronics Overall system diagram Current status At detector
Building a 2 KW SSPA for 23cm
Preparation for Installation at ESS
Presentation transcript:

QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant –IF signal cable plant –Analog read back cable plant –SIS Signal assignments

DC power distribution DC power supply BPM signal patch panel VME crate Analog signal interface Cable Feed through RF amplifier pwr supply Cal Tone Generator Cable Feed through SLAC supplied Cable Feed through 6446 MHz LO Locking box QBPM Rack Layout 40 Rack units required Existing unit 5 Units 2 Units 4 Units 2 Units 3 Units 9 Units 2 Units 4 Units 1 Unit Still to be designed Need 15V at 5 amps Could use existing Nanobpm VME crate but should buy a new VME 64x crate Also need a new CPU

LO power budget/ cable plant 33 dbm max amp output 29.5dbm after splitter 7m of LDF4-50 cable = 1.4 db plus 0.25 db per connector=1.9db loss 27.6dbm 26.88dbm 13.5m of LDF4-50 cable = 2.71 db plus 0.25 db per connector=3.25db loss 23.63dbm 20.13dbm after splitter 20m of LDF4-50 cable = 4 db plus 0.25 db per connector=4.5db loss dbm 1db loss in these cables 17.6dbm 26.88dbm 16.6dbm 27.6dbm 16.6dbm 10m of LDF4-50 cable = 2db plus 0.25 db per connector=2.5db loss 24.3dbm All 8 way splitters have 10db loss All cables from 8 way to down mix boxes should have no more than 2db loss These cables should be made from LDF db/meter

Some where in this location is an ideal location for QBPM electronics 42 db gain 33dbm amp with 2way splitter 8 way splitters 10db directional couplers 2 way 3 db splitter LDF4-50 cable or equivalent LDF2-50 cable

8 way splitter LDF4-50 cable or equivalent 6 way splitter LDF2-50 cable

8 way splitters LDF4-50 cable or equivalent LDF2-50 cable Some where in this location is an ideal location for QBPM electronics

Downmix boxes Downmix boxes and hybrids to be mounted on to the steel plate fixed to the side of the concrete magnet supports Downmix boxes to be on 25mm standoffs (SLAC supplied) Hybrid Downmix box standoffs

Put a connector on the drain wire as shown for grounding the connector shell if needed DC Power Distribution

DB9 male connector

SIS QBPM channel assignments SIS1SIS1 QD10X Y QD10X X QF11X Y QF11X X QD12X Y QD12X X QD16X Y QD16X X SIS2SIS2 QF17X Y QF17X X QD18X Y QD18X X QF19X Y QF19X X QD20X Y QD20X X SIS3SIS3 QM16FF Y QM16FF X QM15FF Y QM15FF X QM14FF Y QM14FF X QM13FF Y QM13FF X SIS4SIS4 QM12FF Y QM12FF X QM11FF Y QM11FF X QD10AFF Y QD10BFF X QF9AFF Y QF9BFF X SIS5SIS5 SF6FF Y SF6FF X QF9AFF Y QF9AFF X QD8FF Y QD8FF X QF7FF Y QF7FF X

SIS6SIS6 QD6FF Y QD6FF X QF5BFF Y QF5BFF X SF5FF Y SF5FF X QF5AFF Y QF5AFF X SIS7SIS7 QD4BFF Y QD4BFF X SD4FF Y SD4FF X QD4AFF Y QD4AFF X QF3FF Y QF3FF X SIS8SIS8 QD2BFF Y QD2BFF X QD2AFF Y QD2AFF X SF1FF Y SF1FF X QF1FF Y QF1FF X SIS9SIS9 RC1FF RC1X RC3FF RC2FF SISSIS SIS QBPM channel assignments SD0FF Y SD0FF X QD0FF Y QD0FF X

Parts to buy to complete RF BPM system RF BPM LO and CAL cable plant –500 ft of Andrews LDF4-50 or equivalent LO from source to splitters. With a loss/meter at 6400MHz of 6.5 db/30m. 44 L4NM-C type N male connectors for both ends. Flare tool Andrews part# Cable preparation tool Andrews part# MCPT-L4 –1000 ft of Andrews LDF2-50 or equivalent for LO from splitters to electronics. With a loss/meter at 6400MHz of 10.2 db/30m. 156 L2PNM-HC type N male connectors. – Two 2 way 3db splitters that will work at 33dbm power levels. Pulsar Microwave PS /3N or equivalent –Two 6 way splitters with Type N female connectors. Pulsar Microwave PS /1N or equivalent –Conformal cable and connectors for LO and CAL jumpers. The length of these cables have to be adjusted for the single pulse calibration setup. 20 meters of conformal cable or equivalent. 80 female N connectors 80 male SMA connectors.

21 slot VME crate and controller –Controller type yet to be determined. 2000m of 6 conductor wire for analog read back. –Wire should be either 18 or 20 gauge with foil shield and drain wire. 40 male 9 pin D connectors and pins. –D Connector cases should be metal for shielding purposes. 15 V 5amp rack mount power supply for tunnel LO and CAL amplifiers. Parts to buy to complete RF BPM system (cont)

Installation Plan Install equipment in the rack Pull in: LO and CAL cables (still to be purchased) DC power cables ( now at SLAC) Analog signal cables (still to be purchased) IF signal cables ( now at SLAC) Adjust LO phases for single pulse calibration operation. Test data acquisition software.