1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.

Slides:



Advertisements
Similar presentations
Acquisition Planning and Adequate Market Research National Oceanic and Atmospheric Administration Acquisition and Grants Office Oversight and Compliance.
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Roadmap for Sourcing Decision Review Board (DRB)
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Alternative Project Delivery
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
David Pindroh Procurement Overview LUSI DOE Review 8/19/08 – 8/21/08 p.1 LCLS Ultrafast Science Instruments (LUSI) David Pindroh – LCLS Procurement Manager.
David McGiven FAC: Construction Management Procurement October 2006 Facility Advisory Committee (FAC) Construction Management.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Project Support Update Diane Hatton, Project Support Division Director NSLS-II Project Advisory Committee Meeting May 24-25,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
United Nations Procurement Division
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
YOUR PROPOSAL CAN LEAD TO CONTRACT AWARDS
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
City of Houston Temporary Employee Services Program Analysis Fiscal Affairs Committee Brief November 8, 2010 Omar C. Reid Human Resources Director.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
OIRM Business Process Planning Overview for Business & Operations Advisory Committee May 27 – 28, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Procurements Thomas C. Nehring, PE Lead Electrical Engineer Conventional Facilities Advisory Committee - Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Anthony Guadagni NSLS-II Procurement Manager March 25, 2009.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
1 BROOKHAVEN SCIENCE ASSOCIATES Beamline Development and Facility Usage.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
Construction Management At Risk Process
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David Dale Procurement Manager CFAC Status Meeting May 8, 2008.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Management System Consulting Services Chris Teague, CPSM June 17,
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
2016 SAME Small Business Conference - Atlanta
Request for Proposal - Best Value
Department of Community Development
Request for Proposal - Best Value
PROJECT DELIVERY METHODS
Linac Coherent Light Source Procurement
Details supporting the increase
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Conventional Facilities
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Procurement Staffing Acquisition Strategy Advance Procurement Planning DOE Approval Requirements Major Equipment Procurement Process Ring Building Construction Schedule Procurement Challenges Summary

3 BROOKHAVEN SCIENCE ASSOCIATES Procurement Staffing

4 BROOKHAVEN SCIENCE ASSOCIATES Acquisition Strategy NSLS-II Acquisition Strategy Document In accordance with DOE Directive M DOE Approved Procurement System NSLS-II Project Team includes: Dedicated Procurement Manager Dedicated procurement staff Procurement quality support Use of Full and Open Competition with Qualified Sources to the maximum extent possible

5 BROOKHAVEN SCIENCE ASSOCIATES Procurement Strategy Advance Procurement Planning Procurement Planning and Communication Procurement forecast thru FY12 developed Advance Procurement Planning (SNS model) Procurements over 100k or Risk Significant Procurement schedules include consideration for procurement methods and approval requirements Procurement schedule and status reports to track procurement activities (SNS model) Close Communication with Project and Technical Staff Communication with Procurement Counterparts from other DOE Laboratories

6 BROOKHAVEN SCIENCE ASSOCIATES DOE Approval Requirements DOE-BHSO Advance Notice for sole source procurements > $100K Buy American Act waivers > $100K Procurements > $5M DOE- CH Procurements > $10M-25M DOE-HQ Procurements > $ 25M

7 BROOKHAVEN SCIENCE ASSOCIATES Major Equipment Procurement Procurements Utilize Request for Proposal “ Best Value ” (RFP) Method Specifications supported by Functional Requirements Schedule and Contractor Performance - Integral Part of Proposal Evaluation Criteria Evaluation criteria developed through close coordination with Control Account Managers Procurements Publicly Announced on the FedBizOps Website Maximize competition Develop New Sources

8 BROOKHAVEN SCIENCE ASSOCIATES Fiscal Year 07 Major Procurements Description Amount Award A/E Ring Bldg $11M 9/05/07 C/M Agent $956k 9/12/07 A/E Chilled Water $996k 9/12/07

9 BROOKHAVEN SCIENCE ASSOCIATES Fiscal Year 08 Major Procurements Description Amount RFP Award Comments Title III A/E Services 3.6M 5/08 9/08 CM Construction 6.5M 5/08 9/08 Site Preparation 1M 8/08 10/08

10 BROOKHAVEN SCIENCE ASSOCIATES Fiscal Year 09 Major Procurements Description Amount RFP Award Comments Ring Building 191M 10/08 2/09 FY 07 Planning Chilled Water 15M 10/08 3/09 FY 08 Planning Vacuum Chambers 14M 1/09 6/09 FY 08 Planning Storage Ring Mag 18M 2/09 8/09 FY 08 Planning

11 BROOKHAVEN SCIENCE ASSOCIATES Fiscal Year 10 Major Procurements Description Amount RFP Award Comments Linac 9.8M 10/09 10/10 FY 09 Planning SR Vacuum Pumps 7.9M 12/09 6/10 FY 09 Planning Compact Booster 17M 10/09 3/10 FY09 Planning

12 BROOKHAVEN SCIENCE ASSOCIATES Fiscal Year 11 Major Procurements Description Amount RFP Award Comments SR Corrector PS 6M 3/10 10/10 FY 10 Planning SR Multiple PS 4.9M 3/10 10/10 FY 10 Planning Process Water 4.8M 9/10 2/11 FY 10 Planning SR RF Cryogenics 4.8M 6/10 10/10 FY 10 Planning

13 BROOKHAVEN SCIENCE ASSOCIATES Fiscal Year 12 Major Procurements Description Amount RFP Award Comments Damping Wiggler 7M 9/11 2/12 FY11 Planning IV Undulator 7M 9/11 2/12 FY 11 Planning EPU 3.6M 11/11 2/12 FY 11 Planning

14 BROOKHAVEN SCIENCE ASSOCIATES Conventional Construction Schedule 10/07 A/E Delivers Title I 10/07 Draft Request for Proposal (RFP) developed 11/07 Draft RFP to DOE BHSO 12/07 DOE Procurement Validation Review 1/08 Recommendations incorporated 2/08 Draft RFP issued to industry 4/08-5/08 Industry Feedback 8/08-9/08 DOE reviews /approves RFP and proposed contract 10/08 RFP Issued 2/09 Contract Award

15 BROOKHAVEN SCIENCE ASSOCIATES Procurement Challenges FY 08 Establishing Advance Procurement Plans for FY 08 and 09 Site Clearing, Planned Award 10/08 Completion of A/E Design, Planned completion 8/08 General Construction Ring Building Planned RFP 10/08

16 BROOKHAVEN SCIENCE ASSOCIATES Summary Acquisition Strategy has been developed Procurement Integrated into the Project Team with dedicated Procurement Management Procurement Staff in place Advance Procurement Planning Process Procurement schedule includes consideration of procurement methods and required approvals Procurement Plan for critical path conventional construction established