MIP Release 4.1 Service Pack 02 Overview and User Guidance.

Slides:



Advertisements
Similar presentations
Support.ebsco.com Creating Profiles in EBSCOadmin Tutorial.
Advertisements

OIP Order Information Portal
Publishing Sitecore how-to. 2 Who is this guidance for? Those with admin access. If you dont see the Publish button under the Publish tab, most of this.
Shared Space Admin Demo March Admin demo introduces - Adding users Moderating users Moderating resources Adding communities and sub groups.
Technical Update Jonathan Wood – SIMS Product Manager (Technical and Releases)
Digital Course Support PRESENTER [First & Last Name] [Title] SAM Getting Started.
Special Education Student Information System Project New York City Department of Education | Special Education Student Information System Project 1 SESIS.
MIP Workbench: Revisions FEMA Learning Management System FEMA REVISION LEAD.
MIP Workbench: Revisions FEMA Learning Management System Audit Lead.
MIP Workbench: Revisions FEMA Learning Management System FEE ADMINISTRATION ROLE.
Submitting access to scripts (ATS) requests via Interchange A step-by-step guide to support the submission of access to scripts requests for 14–19 qualifications.
National Oceanic and Atmospheric Administration User Group Presentation – Release 2.10 October 5, 2006.
Performance Management Reviews Training Positions.
ShelterPoint™ Data-Entry Workflows.
Welcome to Travel Incorporated’s Concur ‘Experienced User’ Webinar.
Customer Forum OTech’s New Web Publishing Service Web Services Section – April 29, 2015.
Smart Connect – Supplier Portal Training Module 1 – System Overview.
Making an eReport to the Child Protection Helpline
INTERNATIONAL LABOR STANDARDS
Lunch and Learn: MIP Data Center Migration March 10, 2011 and March 11,
MIP Workbench: Revisions FEMA Learning Management System PROJECT ADMINISTRATION ROLE.
September 10, Agenda Welcome Updates Reminders New CT.gov Site Questions & Comments.
CHQ Learning Management System. 2 Learning Management System General Dynamics Private l Leveraging an existing AIS training website and vendor, to provide.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
PERS of Mississippi – Payroll and Plan Service Center Training December 2013 RETIREMENT SERVICES.
ITS NCID Next Generation (NG) Project Overview February 24, 2010.
Project Overview Project Name: Client Information Management & Retrieval System M.S. Project : CS University of Bridgeport Student Name: Gandhi Tejas J.
What’s New in SkillPort 7 Presenter Name Title. SkillPort 7 – a whole new look and feel! Complete redesign of the SkillPort User Interface –Both Student.
BOLD 2.0 Navigation Help Guide Note: BOLD will be inaccessible from 9:00 pm ET on Friday, June 1, to 7:00 am ET on Monday, June 4, so that the upgrade.
Retail Training Manuel 2 Overview  One stop, secure, and easy-to-use web-based tool that incorporates rate, quote, and bind functions  Enables agents.
Brava for Open Text ECM SharePoint Connector Copyright © Open Text Corporation All rights reserved. Slide 1.
CONFIDENTIAL H. Balogh, K. Toal RDN Release 27 Features April 9, 2014.
Cigarette Distributing Agent’s Report. Log in with the user id and password provided through the EDS registration process and click on the Login button.
MIP Workbench: Revisions FEMA Learning Management System PROJECT LEAD.
Approved Provider Training April 16, NJAES Office of Continuing Professional Education Today’s Agenda:  Welcome – Jim Morris  Overview of NJLMN.
New Payroll Tools and Closeout Submission Trends ORS Quarterly Meeting September 16, RACI Michelle Rigsbee & Valerie Abbott Campus Closeout Implementation.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
OLDC Version 3.0 October 18, How to Connect (Telephone Conference) The Deployment Teleconference consists of a telephone conference and a Bridgit.
MIP Workbench: Revisions FEMA Learning Management System REVISION RESOURCE MANAGER.
Data Segmentation for Privacy November 16 th, 2011.
Classifications Schemes and Class Scheme Items in the Curation Tool: Interface Design Audrey Lipps, User-Centered Design
Civilian Human Resources Training Application System Release IV Overview Training History 30 September 2008 Assistant G-1 for Civilian Corps Supporting.
HR Information System Upgrade CASUAL TIMESHEETS. HR Information System Upgrade – Casual Timesheets 2 Welcome to today’s session on CASUAL TIMESHEETS Your.
DHHS COE Meeting Agenda February 11, 2010 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
Overview: Ethics 450 Congrats on your new app! This application will provide FDCCI participants with an easy way to track their data center consolidation.
Lunch and Learn: Update on the Decommissioning of FEMA’s DFIRM Tools July 19,
PMIS Introduction to Request New Catalog Item Training Presentation US Department of Health and Human Services.
May 31 User Interface Design for HTML Pages Updated 4/14/06.
SMART Fiscal Year End 2016 and Other Updates for SHARP/SMART Presented by OCFO - Statewide Payroll and Accounting Team 1.
HIOS Portal Release Issuer Training.  Provide an Overview of HIOS Portal Release 20 Enhancements  Outline CMS Portal UI Changes  Provide an Overview.
Preparing for SAP BusinessObjects 4.x Tim Rodine, TCR Solutions.
3 rd Party Registration & Account Management SMT Update To AMWG May 24, 2016.
PMIS Introduction to Sunflower Release 2.9 New Features And Custom Enhancements Training Presentation US Department of Health and Human Services.
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
© 2014 RENTPAYMENT | 1 HOMEOWNER USER GUIDE. 10 © 2015 DUESPAYMENT | 2 TABLE OF CONTENTS Welcome To DuesPayment 3 DuesPayment Support 4 Main Menu 9 Make.
Conceptual Overview For Understanding the New Paradigm Provided by: Web Services Section.
Quick Info Tables: Unsubmitted Transactions Transactions with Alerts
2017 Gymnastics Online (GOL) Phase 1 – Club Admin Portal: Minor enhancements April 2017.
Document Flow Manager 4.10 CEVA Business Users
Shared Space Admin Demo
MY AGED CARE - Changes to the PROVIDER PORTAL USER INTERFACE
MY AGED CARE - Changes to the PROVIDER PORTAL USER INTERFACE
Importing Supplier Contract Documents for Agency Library Administrators CORE-CT Finance Upgrade Implementation
Gregory Smith November 2012
Patents e-Commerce Update: Public and Private PAIR
To the ETS – Accounts Setup and Preferences Online Training Course
Patents e-Commerce Update: Public and Private PAIR
Connect Training Series
Presentation transcript:

MIP Release 4.1 Service Pack 02 Overview and User Guidance

2 Contents  Welcome and Housekeeping  Introduction  Changes to the Workbench  Changes to Process Admin  Available Resources  Questions

3 Introduction  The purpose of this release is to reverse the changes introduced into the MIP in Release 4.1 (R4.1), to enable the smooth transition of Amendments, Revisions and Studies to the new workflow server that Release 4.1 implemented.  Service Pack 02 (SP02) returns the user interfaces for the MIP Workbench home page and Process Admin home page back to their appearance/functionality prior to the August 19, 2011 MIP Release 4.1 deployment.  The target deployment date for MIP R4.1 SP02 is the weekend of April 14th.  Scheduled downtime for the deployment of SP02 will be as follows: Beginning: Friday, April 13 at 6:00 p.m. EDT Ending: Monday, April 16 at 6:00 a.m. EDT

4 Changes to the Workbench  The additional Work Items - Legacy tab will be removed from the MIP Workbench Home section.  All projects will be accessible through the Work Items tab, as was the case prior to August 2011.

5 Before SP02 Before SP02, projects on the Workbench were divided between the Work Items and Work Items – Legacy tabs. Users could utilize the Case Number Locate field to determine which tab held a specific project.

6 After SP02 After SP02, projects on the Workbench will no longer be divided between two tabs, and will all be contained inside Work Items.

7 Changes to Process Admin  The Process Admin Home, Process Admin, and Process Admin–Legacy tabs that are displayed upon selecting Process Admin from the main menu will be removed.  When selecting Process Admin from the main menu, users will be sent to the familiar Project Search and Process Admin entry form.

8 Before SP02 Before SP02, projects in Process Admin were divided between the Process Admin and Process Admin – Legacy tabs.

9 After SP02 After SP02, projects in Process Admin will no longer be divided between two tabs, and will all be contained inside Process Admin.

10 Available Resources  This presentation and MIP R4.1 SP02 FAQs can be found at on the MIP Rel. 4.1 Service Pack 02 Resource Page link. Rel. 4.1 Service Pack 02 Resource Page  For technical questions, please contact  For general questions about MIP R4.1, please contact

11 Questions?

12