P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.

Slides:



Advertisements
Similar presentations
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
Advertisements

TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
TC meeting P2 planning wks 7&8 A.Tauro
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
TC meeting P2 planning wks 9&10 A.Tauro
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
TC meeting P2 planning wks 5&6 A.Tauro
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
DCal-ALICE integration and installation plan and status A. Tauro.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
ELENA installation progress F. Butin / ELENA collaboration.
ALICE 5 o’clock meeting Wk 51.
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
ELENA installation and commissioning status
LS1 planning meeting
Gas system Commissioning procedures and status
ALICE 5 o’clock meeting Wk
TS1 preparatory meeting
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
ALICE 5 o’clock meeting Wk
TPC Detector Control System
Experimental Areas – LS2 planning
Presentation transcript:

P2 status, LS1 planning A.Tauro - W.Riegler

Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions 21/6/12P2 status, LS1 planning - A.Tauro2

TS2 (25 th to 29 th June) – detector activities DetectorIntervention SDDCheck pressure sensor (PP4) SSDReplace LVPS (A and I side racks). Install thermostatic valve (cooling plant) TPCRR cooling: replacement & rotation of the pump TPC laserInvestigate problem with RS232 communication with Laser 2 TRDInstallation hardware for the ethernet multiplexer. LV connection check. Check TRD pretrigger TTCex board. Fix gas leak in SM6 TOFReplacement DC/DC converters in several sectors SPDElectronics check. SR3 and 8 will not be drilled MTGMaintenance electronics & RPC gas check. Decrease C 2 H 2 F 4 consumption MTKReplace Wiener LVPSs PHOAdd freon to the cooling plant (RP check) EMCCommissioning of the 1/3 size EMCal supermodules (RO) T0Investigate width problem, inspection laser system, repair one amplifier ACOCheck electronics BCM-BPTXChecks 21/6/12P2 status, LS1 planning - A.Tauro3 TC meeting tomorrow:

LS1 LS1: Nov.24 th 2012 to Sept.1 st 2014  92 weeks. There are no official plans to delay the LS1 start date. There is an option to start LS1 one week earlier, i.e. on Nov.17 th, because in this way the LHe can be fully recovered before Xmas. The final decision will be taken in August. Beyond that time it will be more and more difficult and costly to move the LS1 start date (F.Bordry). LHC commissioning with beam: Sept. 1 st 2014 to Nov (no access to UX25). It is not planned to have a stop of LHC beam operation at Christmas 2014 (1 week of standby for LHC & Injectors). 6/15/12ALICE LS1 plans - A.Tauro4

What is LS1? Not a project, but a time-frame (Nov-2012 to Sept-2014) Numerous projects and activities:  SMACC (Superconducting Magnets And Circuits Consolidation)  R2E  Massive shutdown maintenance after more than 3 years of operation  Several major consolidations  A lot of projects (Linac 4, HIE-Isolde, Elena, LIU, HL-LHC, 107, ….) Compared to previous shutdowns, an exceptional number of …  Simultaneous activities (co-activities) – Planning and safety  Non-CERN workers (FSU, collaborations, contracts,…)- Logistics: Registration, training, transport, parking, access, film badge, EPI, catering, accommodation,…) Expt. Areas (Isolde, nTof, AD, East & North areas,…) 5 F.Bordry – LS1 day

S 12 S 23 P2P2 S 34 P3P3 S 45 P4P4 S 56 P5P5 S 67 P6P6 S 78 P7P7 S 81 P8P8 Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. EN Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. Jan. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. Jan P1P TeV Complete LHC schedule 6 Cool-down W-Up Splices Cool-down W-Up CSCM W-Up Beam Commissioning M M M M K.Foraz LS1 day

ALICE plans for LS1 Baseline sequence (MNF will not be removed): –Add 5 TRD modules –Add 6 DCal supermodules and 2 1/3 supermodules –Add 1 PHOS module Many things on top of this sequence: –LV consolidation (TRD/TPC cables BKF) –SAA3 extension –CO 2 and N 2 fire extinguisher systems consolidation –New outlets for redundancy of Ethernet cables –… Services interruptions (detailed plan still under discussion): –EN-EL: 66vK and 18kV consolidation  several equipment off for 8w –CV maintenance and upgrade  2-4 months no cooling 2013 –L3: ventilation and cooling upgrades –UPS upgrade  no UPS power (DAQ, DCS, cooling plant…) 6/15/12ALICE LS1 plans - A.Tauro7

ALICE now vs. LS1 21/6/12P2 status, LS1 planning - A.Tauro8

6/15/12ALICE LS1 plans - A.Tauro9 Two TRD modules ready in Aug. PHOS ready end- 2013

Central systems availability in DAQ. Several interventions foreseen: –Infrastructure (new racks, fibers, new UPS electrical distribution) –Network (replace central router) –Computers (new LDCs)  DAQ down for most of 2013! Logbook will not be shut-down HLT. Computer farm replacement in early Old farm will be working at all times (except during power interruptions) DCS. Plan not yet discussed with TC. Possibility to keep a minimum of services operational at all times (e.g. monitoring,…) 21/6/12P2 status, LS1 planning - A.Tauro10

ALICE recommissionig plan in 2014 (proposal) March-April: standalone recommissioning May-June: global recommissioning July-August: 24h operation 1 st September: LHC beam commissioning Requests for running the central systems outside these periods should be discussed individually 21/6/12P2 status, LS1 planning - A.Tauro11

LS1 activities  TC reviews: ITS, TRD, TPC, Muons  Reviews next week: T0, PMD, ZDC, FMD, HMP, PHO and TOF 21/6/12P2 status, LS1 planning - A.Tauro12

ITS SPD: –Minor interventions (FEE) –Replace pump in cooling plant, reuse old inlet pipes, recalibrate T-P sensors,… SDD: –Replace ISEC HV boards (drift problem) –Install SuperCarlosRX cards  need DAQ for testing –Replace plastic pipes on cooling plant manifold (tbc) SSD: –CAEN LVPS modification (decrease CM)  ~120 PS in total –Cooling plant: remove heaters (tbc), drain water (N2 permanent flush?) 21/6/12P2 status, LS1 planning - A.Tauro13

TRD SM production: –All electronics will be produced by end 2012 –Two SM ready by August 2013 (installed on top sectors) –Three (bottom) SMs ready before end of LS1 (but not in 2013) Other activities: –20 HV problematic chambers  possibility to take out one SM for repair –Replace LV patch panels for all sectors –New tank water cooling plant Gas: cryogenic recovery/cleaning at start of LS1  store Xe –Operate the detector for most of LS1 with Ar-CO2 (70-30) –Refill with Xe at some point in 2014 –Find better CO2 analyzer, new gas chromatograph (TRD-TPC) 21/6/12P2 status, LS1 planning - A.Tauro14

TPC FEE consolidation: –Replace FECs –Install and commission redundant ethernet system HV consolidation: –Maintenance Read Out Chambers –Possibly inspection of containment volumes in field cage Interventions on RR and FEE cooling plants Gas. New CO 2 analyser and gas chromatograph, drift velocity monitor consolidation One upgrade option foresees an improvement of the readout capability with the current ROCs and FEE (under discussion): –Replace all RCUs with new ones (possibly) in CR1 –Additional cabling and fibers between TPC and CR1 21/6/12P2 status, LS1 planning - A.Tauro15

Muons Muon TRK: –Occupancy problem: repair slats (busbar connections): 90 slats to be repaired will take ~10 months in 2013 (DAQ, DCS and gas needed) –Replace one quadrant ST2 Muon TRG: –Ordinary FEE and gas tightness maintenance –Replacement of a few RPCs, if needed –Full campaign of survey and photogrammetry –Gas modification to re-circulate freon (tbd) 21/6/12P2 status, LS1 planning - A.Tauro16

André Augustinus Perturbations at P2  Relatively stable operation for ALICE No (primary) cooling perturbations, no Level3 alarms  Several electrical perturbations [since last TB: 20/05 (2x), 26/05, 03/06, 06/06, 07/06, 08/06, 10/06, 11/06, 12/06, 13/06] Propagated from perturbations on French 400kV power grid (thunderstorms) Typically up to 10% drop on one or two phases for 2-4 cycles Typically triggers beam dump, but LHC recovers relatively quick 20/05 and 13/06 caused ALICE dipole trip, no other effects  Solenoid magnet: 1 rampdown for access, 1 trip (16/06) due to failing Pt100 transducer (during stable beams, LHC did not loose/dump beam)  Dipole magnet: 1 rampdown for access, 2 trips (electrical perturbations) ALICE Technical Board21 June 2012

SXL2 doors, crane… The replacement of the SXl2 big doors will start on July 16 th, and will take approximately 2 weeks –Nobody inside cleanroom (TRD people informed) –Cleanroom A/C probably off during work –Evacuation of material outside cleanroom New SXL2 crane foreseen for September 2012 (weeks 36-37) 2 nd floor 3294 will be built in October 2012 –12 new offices (12m 2 each) and 2 conference rooms (24m 2 each) 21/6/12P2 status, LS1 planning - A.Tauro18 SXL2 door

ALICE official schematics/photos Available on CDS (thanks to Julie): (Schematics) (Saba’s photos) (Saba’s photos) 21/6/12P2 status, LS1 planning - A.Tauro19

Conclusions Several activities in TS2 – planning meeting tomorrow morning 9:00 at P2 LS1: Nov 2012 to September ALICE plan to complete the TRD and install DCal – several other activities on top The ITS, TRD, TPC and Muon activities during LS1 have been presented. The plans for the other detectors will be presented in the next TB Services interruption during LS1: LHC plan still under discussion, we will be able to give more details in the coming weeks (restart weekly planning meetings) As a general consideration: –2013  detector & central systems upgrade – several service disruptions –2014  restart standalone and global commissioning 21/6/12P2 status, LS1 planning - A.Tauro20