DMAIC A FIVE STEP METHODOLOGY TO PROBLEM SOLVING 1.

Slides:



Advertisements
Similar presentations
Lean Six Sigma Project Presentation Template
Advertisements

Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Roberto lopez LSSMBB DMAIC project template.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
© All Rights Reserved TreQna 2005 Six sigma Orientation.
OXFORD SOFTWARE ENGINEERING Software Engineering Services & Consultancy Slide 1© OSEL  - and its application to software development UK SPIN May.
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
Define Measure Analyze Improve Control 1 Project Title BB Candidate Name Define.
Six Sigma What is Six Sigma?
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
“Safety is a Measure of Success”
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
Project Title Team Leadname Team MembersMember names Process Ownername Championname Insert your company logo here.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Practical Assessment Project Template
Project Title GB or BB name: XYZ. Define Phase D D M M A A I I C C.
Define Tollgate Checklist
Copyright © Six Sigma Academy International LLC All Rights Reserved Introduction To Measure.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Lean Six Sigma Project Briefing Type Briefer Organization Here
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Project Title GB or BB name: XYZ.
Project Storyboard (Page 1 of 2)
Confidential, , MBX Template Book Confidential, ,
CONFIDENTIAL Six Sigma – What, Why & How?. CONFIDENTIAL 2 What is Six Sigma? Six Sigma combines a system and set off tools designed to improve processes.
Six Sigma by Aranyos Attila for MSc. Mérnök Informatika Production and Process Management class held by Vida Csaba.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
A data-driven improvement technique A science An organizational phenomenon A total quality improvement philosophy A management philosophy A problem- solving.
Practical Assessment Project Template
Name: Project: March – April 2017
CPI Event / Project Tollgate Template
Practical Assessment Project Template – DMADV
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template

The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Continuous Improvement Projects
Improving Existing Products & Services
Name: Project: March – April 2017
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Name: Project: MSD IT – December 2017
Practical Assessment Project Template
DMAIC Project Template
Framework for Success: DMAIC
Certification Project Template
Project Title Date Location of Kaizen Author.
LEAN SIX SIGMA PROJECT TEMPLATE
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Certification Resources Workbook
Six Sigma DMAIC Process
Six Sigma DMAIC Process
Name: Project: MSD IT – December 2017
Practical Assessment Project Template – REV. 5.2
OPEX DMAIC Routemap Slides
CPI Event / Project Tollgate Template
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Six Sigma DMAIC Process
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

DMAIC A FIVE STEP METHODOLOGY TO PROBLEM SOLVING 1

DEFINE 2 DMAIC

PROJECT CHARTER 3 Project TitleProject Type YB/GB/ BB Business Case Problem Statement Goal Statement In scopeOut Scope

SIPOC 4 SUPPLIER CUSTOMERPUTPUTPROCESSINPUT

PROCESS MAP 5 xxxx xxx xxxx

CTQ TREE 6 xxxx

DEFINE TOLLGATE 7

MEASURE 8 DMAIC

MEASUREMENT PLAN 9 Continuous Data Target USL LSL Discrete Data Unit Defect Number of Opportunities List of Opportunities for defect

MEASUREMENT PLAN 10 Measure of Performance Data source and location Sample SizeWho will collect data Closure DateData Period

BASELINE CALCULATION FOR DESCRETE DATA 11

BASELINE CALCULATION FOR CONTINEOUS DATA 12

MEASUREMENT SYSTEM ANALYSIS 13

MEASURE TOLLGATE 14

ANALYSE 15 DMAIC

ROOT CAUSE ANALYSIS 16

HYPOTHESIS TESTING SUMMARY 17 X’s IdentifiedData Normal?Hypothesis test performed P- ValueIs X significant?

HYPOTHESIS TESTING 18 Continuous Discrete Continuous 1 Sample t 2 Sample t ANOVA Correlation & Regression Chi-Square Log-Regression Y X

ANALYSE TOLLGATE 19

IMPROVE 20 DMAIC

IMPROVEMENT IDEAS 21 S.NIdentified root cause SolutionsPerceived BenefitsCost / Risk

IMPROVEMENT ACTION PLAN 22 Improvement actions ResponsibilityAction planTimeline

BASELINE CALCULATION POST IMPROVEMENT FOR DISCRETE DATA 23

BASELINE CALCULATION POST IMPROVEMENT FOR CONTINUOUS DATA 24

IMPROVE TOLLGATE 25

CONTROL 26 DMAIC

CONTROLLING X S 27 Standard operating procedures changed Visual controls Mistake proofing

PROCESS CONTROL PLAN 28

CONTROL CHART 29

FMEA 30

CONTROL TOLLGATE 31

PROJECT CLOSURE 32 PROJECT CLOSURE Project highlights Project CTQUnit of Measurement Before Project After ProjectTarget set Statistically proven improvement ? Yes/ No Benefits – Hard or Soft ; $ / Year Participants Presented by Financial Validation completed ?