1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.

Slides:



Advertisements
Similar presentations
June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Advertisements

Former NAS Moffett Field
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
McClellan Reuse: Successes & Challenges 2006 Update Jeanette M. Musil, M.S. Deputy Director Kathy Broderick Senior Reuse Coordinator Sacramento County.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
DOE 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010 Loren W. Setlow, CPG Office of Radiation and.
U.S. EPA Regulations Review Update: Subpart W NESHAPS (40 CFR 61) Uranium and Thorium Mill Tailings (40 CFR Part 192) Andrea Cherepy, Phil Egidi, Reid.
Colorado River Protection Activities on the Moab UMTRA Project Ken Pill, Hydrogeologist Technical Assistance Contractor CMU Upper Colorado River Basin.
1 Long-Term Stewardship of Uranium Mills in the United States – Regulatory Issues Keith McConnell, Deputy Director for Decommissioning and Uranium Recovery.
2010 Long-Term Surveillance and Maintenance Conference Old Rifle Title I Processing Site, Rifle, Colorado What Are They Doing on My Site? Richard Bush,
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
SRI Webinar September 30,  Purpose of Pre-Feasibility Study  Site Background  Regional Context  Site Reuse Goals  Renewable Energy Assessment.
Ecological Revitalization: Turning Contaminated Properties Into Community Assets Michele Mahoney EPA Office of Superfund Remediation and Technology Innovation.
BLM and DOE Coordination through the Uranium Leasing Program Presented by Mitchell Leverette, Bureau of Land Management Washington, DC.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Cleanup of Uranium Legacy in Southeastern Utah
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
NAVAJO UMTRA LTSM UPDATE Madeline Roanhorse Navajo AML / UMTRA Department 2010 Long-Term Surveillance and Maintenance Conference Grand Junction, Colorado.
2010 Long-Term Surveillance and Maintenance Conference Lessons Learned from Small Sites Transitions Tracy Ribeiro U.S. Department of Energy Office of Legacy.
Martin County Coal Spill
Production Operations U.S. Department of the Interior Bureau of Land Management November 2006.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Tier II: Module 1C CERCLA 128(a): Tribal Response Program.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
2011 TRB Workshop Camp Withycombe Small Arms Firing Ranges Green Remediation-Case Study Sunrise Corridor Project 1 Presented by: Len Farr AMEC Earth &
UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Remediation of the Tuyuk Suu Tailings Pond “Appraisal of the Minkush.
Balancing Institutional Controls and Beneficial Reuse at U.S. Department of Energy Office of Legacy Management Sites Steven R. Schiesswohl U.S. Department.
Colorado Division of Reclamation, Mining & Safety Idarado Natural Resource Damage Remediation Project CDRMS Office Locations Denver Grand.
REUSE AT THE OHIO RIVER PARK SITE Chris Thomas, Region 3 Superfund Redevelopment Coordinator.
Sears Point ACEC: SEZ Regional Mitigation Site Thomas Jones Asst. Field Manager Bureau of Land Management Yuma Field Office November 14, 2014.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
New Mexico Uranium Exploration & Mining BLM Uranium Workshop August 12, 2008 Salt Lake City, Utah Holland Shepherd, Program Manager Mining Act Reclamation.
2010 Long-Term Surveillance and Maintenance Conference Beneficial Reuse of Legacy Management Sites and Renewable Energy Initiatives John Elmer, S.M. Stoller.
1 Integrated Safety Management Workshop Safety Incentives and Worker Involvement Don Metzler, DOE-EM Federal Project Director Joe Legare, S.M. Stoller.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
Weldon Spring Site: Past, Present, and Future
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Nuclear Waste Storage in Utah!. Clive Storage Facility (Energy Solutions)  In 1990 Energy Solutions was permitted to treat and dispose of Class A low.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Regulatory Framework for Uranium Production Facilities in the U.S.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Real Estate Status Bill Montaña, U.S. Department of Energy Office of Legacy Management.
East Tennessee Technology Park Emergency Management Program (Vision 2020) Darryl Bonner UCOR Emergency Management October 15, 2015.
Fairfax County ParkwayJuly 2011TRB Workshop CERCLA 120(h) CERCLA §120(h) imposes several requirements on all transfers of federal real property to non-federal.
Green Infrastructure at Butterworth Landfill Tom Bloom, EPA Region 5 and Jay Steffen, Grand Rapids, MI.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Financial Assistance 101 Planning for Brownfields Redevelopment Gregory M. Firely, BCES Senior Project Scientist.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Proposed Plan for No Further Action
Utah Division of Radiation Control
South Carolina Perspective on Part 61 Proposed Revisions
Nuclear Waste Storage Current Status and Plans
West Valley Demonstration Project Status Update
Moab UMTRA Uranium Mill Tailings Remedial Action
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
Nebraska Water Infrastructure Funding and Financing Programs
Allen Chan U.S. Government Accountability Office October 2, 2018
Uranium, Radon, and Radiation Outreach
Moab UMTRA Uranium Mill Tailings Remedial Action
Presentation transcript:

1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S. Department of Energy Office of Environmental Management Moab Federal Project Director

2 Moab Site Background Former uranium-ore processing facility ( ) Transferred to DOE ownership in acre site; 130 acres covered by uranium mill tailings pile Largest uranium mill tailings pile (16 million tons) in the world to be relocated Regulated by U.S. Nuclear Regulatory Commission (NRC)

3 Project Scope Relocate 16 million tons of uranium mill tailings and other contaminated materials from the Moab site by rail to Crescent Junction, Utah, for permanent disposal Being remediated under Title I of Uranium Mill Tailings Radiation Control Act Actively remediate ground water at the Moab site Remediate vicinity properties that exceed regulatory standards

4 Moab UMTRA Project Site Arches National Park Rail Load Out N Moab Colorado River Tailings Pile U.S. Highway 191

5 Status Currently shipping up to 144 containers per train, two trains per day, Monday through Friday Through October 2010, about 2.5 million tons of mill tailings (15.5 percent of the total) shipped and disposed Project end date currently at 2025; substantial additional annual funding required to meet 2019 legislated end date Crescent Junction disposal cell

6 Moab Site Cleanup Requirements Surface (soils) remediation Moab site soils are being cleaned up to U.S. Environmental Protection Agency (EPA) standards in 40 Code of Federal Regulations (CFR)192 –5 picocuries per gram (pCi/g) in top 6 inches and 15 pCi/g in subsurface Ground water remediation Biological Opinion identifies a limit of 0.3 mg/L ammonia in surface water Anticipate active ground water remediation to be complete concurrent with surface remediation

7 Supplemental Standards 40 CFR 192 allows the development of alternate cleanup levels, or supplemental standards, based on an assessment of risk to human health and the environment for specific exposure scenarios At Moab site, may be applied along utility corridors, under roadways, and for ground water

8 Current Activities with Future in Mind Tamarisk removal Near ground water well field Erosion control Along hillside up to rail load out area To assist with storm runoff from U.S. Highway 191 and Moab Wash Revegetation of disturbed areas with native species Fauna study

9 End State Vision Land ownership and use DOE will transfer ownership at completion of cleanup –Water rights on Colorado River―Could be sold separately Park-like setting Coordination with stakeholders Other federal agencies –National Park Service and Bureau of Land Management –Discussing possible land transfer mechanisms and infrastructure and facilities disposition NRC, U.S. Fish and Wildlife, Corps of Engineers Local government and community groups –Mill Tailings Project Steering Committee will likely act as reuse organization to represent community’s interests

10 Crescent Junction Disposal Site Land withdrawal 2008: 500 acres permanently transferred to DOE 2009: 20-year renewal of 936 acres held in temporary withdrawal, remaining 864 acres returned to public domain Cell aligned in a east-to- west direction and roughly rectangular, about 5,200 feet long by 2,400 feet wide

11 Crescent Junction Site Specifications Cell excavated in phases; second phase begun in January Tailings thickness: 25 feet below the surrounding grade and 25 feet aboveground Up to 10-foot-thick, multi-layered cover composed of native soils and rock

12 Crescent Junction Site LTS&M Planning Permanent land transfer area will be fenced Disposition of 28-mile construction waterline from Green River Standpipes to be installed in tailings material to monitor transient drainage Observation wells to be installed around cell perimeter

13 Moab Project Information gjem.energy.gov/moab