Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

RoD set-up for the TileCal testbeam, 2003 period. 9th Workshop on Electronics for LHC Experiments Amsterdam, 30 september 2003 Jose Catelo, Cristóbal Cuenca,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
June 2006Juan A. Valls - FPA Project1 Producción y validación de los RODs Read-Out Driver (ROD)
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Commissioning TileCal with Cosmic Ray Muons J. Pilcher University of Chicago.
LKr readout: present and future R. Fantechi 30/8/2012.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Control in ATLAS TDAQ Dietrich Liko on behalf of the ATLAS TDAQ Group.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Development of UW Pixel DAQ System Final Report : Winter 2015 Jimin Kim University of Washington Department of Mathematics/Physics March 20 th 2015.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
News on GEM Readout with the SRS, DATE & AMORE
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
The ATLAS Tiles Hadronic Calorimeter
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Nov. 2005Calorimeter Commissioning R. Teuscher 1 Calorimeter Commissioning in : Testbeam 2: Installation, Cosmic Ray Commissioning.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
MobiDAQ progress Paulo Vitor da Silva, Gerolf Schlager.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
TDAQ status and plans for 2008 Carlos Solans TileCal Valencia meeting 17th December 2007.
Status of NA62 straw electronics and services
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Institute of Nuclear Physics Polish Academy of Sciences
PyBAR Firmware Structure and Operation Experience
VME Pixel ROD Setup in UW Pixel Lab B050
Injectors BLM system: PS Ring installation at EYETS
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
Online Software Status
TileCal ROD Commissioning Counting Room Installation
RPC Detector Control System
UK CMS Oversight Committee Mtg
RoD set-up for the TileCal testbeam, 2003 period.
RPC Detector Control System
Presentation transcript:

Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager

Tilecal week / Sept 04Gerolf Schlager (Cern) Introduction Mobile DAQ test bench for commissioning of Tilecal in the pit Test up to 8 drawers simultaneously 2 main functionalities: –Test package using “DVS” –Data taking using “play_daq” Weekly status report in Commissioning Meetings Dedicated homepage – link on commissioning page ( Cooperation with TDAQ & Infrastructure (ESS) group

Tilecal week / Sept 04Gerolf Schlager (Cern) Hardware Overview Hardware: –5 VP110 (CCT) –8 SSP & ODIN cards –1 TTCvi –1 TTCex –1 Readout Buffer –4 CAEN ADC –1 1:16 optical splitter –1 moveable VME rack –8 external power supplies –Many cables

Tilecal week / Sept 04Gerolf Schlager (Cern) 8 Tilecal modules VP110 (CCT) Odin card TTCex TTCvi Readout Buffer CAEN ADC MobiDAQ – VME crate 8x G-Link 8x TTC commands Odin card VP110 (CCT) Odin card VP110 (CCT) Odin card VP110 (CCT) Odin card CANbus CAEN ADC 8x Trigger cable Trigger Board MobiDAQ layout VP110 (CCT)

Tilecal week / Sept 04Gerolf Schlager (Cern) Setup in pit UX15 USA15 8 External PS Mobi DAQ Preliminary cables (TTC, G-Link, CAN, Trigger, HV,…) Tilecal racks

Tilecal week / Sept 04Gerolf Schlager (Cern) Support for LV power supply manufactured Can now be mounted on Tilecal finger Advantages: –No scaffolding needed –Minimal interference with other activities

Tilecal week / Sept 04Gerolf Schlager (Cern) Software Overview Created mobidaq account Setup Mobidaq ROD Crate DAQ –based on Tiledaq RCD made by Oleg Developed additional RCD hardware libraries –Readout Buffer, CAEN card Developed HV control program Working on test package Scope –Data taking a la Testbeam (using Run Control) Save raw data in files (Athena?, Database?) Use Monitoring to display results (CIS, pedestal noise,…) In future also take cosmics data –Functionality check with DVS Using test package Result “Ok” or “Failed” (Store results in Database?) Easy to use & fast check Final Atlas?

Tilecal week / Sept 04Gerolf Schlager (Cern) DVS (Detector Verification System) ATLAS TDAQ subsystem Run tests without expert knowledge Standalone tests (Test Package) Hierarchical structure Functionality: –Verify status –Detect problems –Diagnose problems Feedback given to developers

Tilecal week / Sept 04Gerolf Schlager (Cern) Test Package Standalone tests adopted from the established tests from Mobidick & Ahab Tests are written for final DAQ framework and can be used in final ATLAS Tests will be performed using DVS TTC communication CANbus communication ~ADC integrator linearity ~ADC functionality ~BCID tests digitizer ~CRC test digitizer ~Pedestal noise xADC firmware version xCIS (2 gains) xL1A at 100 kHz xLED test xHV test Ready~ In progressx Not started

Tilecal week / Sept 04Gerolf Schlager (Cern) HV control program New by Giorgi Arabidze Using Linux & Readout Buffer Full functionalities: –Set HV –Read applied HV –Read HV order –Reset HV_MICRO card –Read addresses –Set new HV SW address Already used to set addresses of all drawers in pit

Tilecal week / Sept 04Gerolf Schlager (Cern) Possible hierarchical structure Drawer 1 TTC communication CANbus comm. ADC Linearity CIS Pedestal noise L1A 100kHz ADC Firmware Version BCID / CRC ADC functionality Drawer 2

Tilecal week / Sept 04Gerolf Schlager (Cern) Low Voltage Power Supply 3.5 kg Ca. 20 x 25 x 7 cm Full user configurability from 1.45 to 28 V Commercial switching power supply Price: 849 US$ p.p. Noise expected to be better than with Finger supplies – dedicated tests with one supply before final order

Tilecal week / Sept 04Gerolf Schlager (Cern) Last minute Update Possible Pilot Project with Infrastructure group – ESS (contact Markus Joos) Use of VP110 (CCT) instead of RIO Advantages Better software & hardware support Easier software development Newer system Cooperation in system installation and development To be decided…