Take 5 for Safety E. Lessard June 2, 2015. Conduct of Operations Agreement 2  An updated set of practices for mission success and safe operation of large.

Slides:



Advertisements
Similar presentations
Computer Security ISO / OHSAS Registration Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Advertisements

TurnKey Project Management Services Capabilities Briefing.
NSF Audit Accelerator Safety Envelopes Picture of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
RHIC Run th Time Meeting Tuesday 8 May 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 05/08/2012 Time Meeting, Run 12.
Best Practice Guidelines for Timber Treatment. Current Code published in February 1994.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Sensation! Park Quality and Commitment. Our Mission To provide our guests with an experience in which family and friends can enjoy quality recreational.
Take 5 for Safety Conduct of Operations – Control of Equipment and
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Configuration Management Publications at IAEA
Configuration Management During Shutdown Picture of the Week Collider-Accelerator Department Take 5 for Safety.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Type B Report - Draft Facts for Startle Hazard Event Collider-Accelerator Department Take 5 for Safety.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Snow Collider-Accelerator Department Take 5 for Safety.
7 Variable Model to Manage Things Collider-Accelerator Department Take 5 for Safety.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Safety Interlock Refresher Collider-Accelerator Department Take 5 for Safety.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
July LEReC Review July 2014 Low Energy RHIC electron Cooling (LEReC) Alexei Fedotov Project Management.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Work Planning Human Performance Ray Karol May 2010 EBIS ARR.
1 Configuration Management Publications at IAEA Presented By: Kent Freeland WorleyParsons.
1 1. Some recent views ( ) 2 Linac tunnel
September 19-20, 2007 E. Lessard EBIS Safety EBIS Project Safety Ed Lessard September 19-20, 2007 DOE Annual Review.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
RHIC Run 12 7 th Time Meeting 21 February 2012 WELCOME Safety SP's slide Experiments and Machine, status 1 02/21/2012 Time Meeting, Run 12.
ISM at the Savannah River Site
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alex Zaltsman Power Amplifiers and LLRF.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
EbiTrack Architecture Version 1.0 September 24, 2012.
Take 5 for Safety E. Lessard February 24, Tips on Procedures Responsibilities  Procedures should have a separate section listing responsibilities,
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
Take 5 for Safety E. Lessard January 13, Readiness for High Consequence Risks: Accelerator Operations  Implementing procedures tie responsible.
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
Presented to: By: Date: Federal Aviation Administration Pending FAA Reauthorization Impact on Foreign Repair Stations Maintenance Information Session 2008.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
Accelerator Support and Maintenance Startup for Run 13.
Chicago Area Facilities (CAF) Electrical Safety Program.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
Brookhaven Science Associates 2006 RHIC & AGS Annual Users’ Meeting June 5-9, 2006 Sam Aronson Interim Director.
Standard Design Process Overview
Ray Karol 2/26/2013. Annual Audit Next week BNL is conducting the annual internal assessment of our environmental and safety programs and compliance assessments.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
By: Mark Reed.  Protecting information and information systems from unauthorized access, use, disclosure, disruption, modification, or destruction.
1 RHIC NSRL LINAC Booster AGS Tandems STAR 6:00 o’clock PHENIX 8:00 o’clock 10:00 o’clock Polarized Jet Target 12:00 o’clock RF 4:00 o’clock (AnDY, CeC)
Take 5 for Safety E. Lessard January 19, Credited Controls  Credited controls: controls determined through safety analysis to be essential for.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
Time Meeting April 2, 2013 Agenda Safety Schedule Machine and system reports 04/02/2013Time Meeting, Run 131.
Planning for Succession
The ORR/RA and the Authorization Basis May 2005 Revision
BigPanDA Technical Interchange Meeting July 20, 2017 Hong Ma
Identification/control of permanent SSCs which are outside of Design Control DESIRED OUTCOME: This session is an opportunity to benchmark programs for.
Air Transport Technical Authority Agreement and Operations Manager Approval for Rowan Gorilla Crane-Helicopter SIMOPS.
TRTR Briefing September 2013
CV-SALTS Beneficial Use and Objective Study
Mayor & Council June 9, 2014.
Presentation transcript:

Take 5 for Safety E. Lessard June 2, 2015

Conduct of Operations Agreement 2  An updated set of practices for mission success and safe operation of large DOE facilities is expected to be approved this summer  Over 700 practices are in this DOE-CAD agreement, which governs the “how its done” portions of C-AD OPM technical procedures; most practices were implemented in the 1990s (e.g., Authorization Practices, Logkeeping, LOTO …)  C-AD facilities covered include: RHIC, AGS, Booster, NSRL, Linac, EBIS, ERL, ATF, ATF II, TVDG, BLIP, STAR, PHENIX, RRPL, TPL, UED, CeC, LEReC

Configuration Management Effectiveness Review – September 2015  Lines of inquiry will be on engineering and design practices for structures, systems and components that comprise both the plant and the research infrastructure  Outside auditors led by McCallum-Turner  Most engineering and design practices at C-AD are mature; however, need to update List of Systems Engineers (e.g., ATF, TPL, BLIP, ATF II) R2A2s and JTAs of Systems Engineers and Chief Engineers

Mirror Problem and Human Performance 4

Photo of the Week: Un-genius 5