Presentation is loading. Please wait.

Presentation is loading. Please wait.

Snow Collider-Accelerator Department 12-22-2009 Take 5 for Safety.

Similar presentations


Presentation on theme: "Snow Collider-Accelerator Department 12-22-2009 Take 5 for Safety."— Presentation transcript:

1 Snow Collider-Accelerator Department 12-22-2009 Take 5 for Safety

2 C-AD Procedures Related to Snow  OPM 1.23 addresses working extended hours ... 4.2 Work Planners, Technical Supervisor, Group Leaders, or higher management, shall consider hazardous weather conditions (e.g. snow) when calling in staff for...  OPM 2.35 addresses snow removal and priority for clean-up  F&O cannot guarantee cleanup priority for storms > 6 inches  OPM 3.0 addresses the local emergency plan and includes natural phenomena 2

3 OPM Search 3

4 Culprits Caught on Film… 4


Download ppt "Snow Collider-Accelerator Department 12-22-2009 Take 5 for Safety."

Similar presentations


Ads by Google