1 9 th Oct. 2008 Design and Construction of Main & Crescent Bridges.

Slides:



Advertisements
Similar presentations
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Advertisements

ODOT Structure Project Manager Training
SEMINAR ON SEGMENTAL CONSTRUCTION OF BRIDGE
Actions and Retrofit of Post Earthquake-Damaged Bridges
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
St. Croix River Crossing S. P
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
TEQIP-II Institutions
SHRP2 Project R04 Bridge Designs for ABC
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Introduction Dubai previously earned most of its income through oil. But oil is not ever lasting. So Prince Sheikh Md. proposed construction of a unique.
ENG-1010 Lecture 16 Bridge Design.
NGfL CYMRU GCaD STRUCTURAL TIMBER FRAMING.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Chapter 34 Bridge Construction.
POWERPOINT PRESENTATION
Totally Precast Concrete Bridges
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Ure đ aji za montažu Transporteri, lansirne rešetke.
 Project Delivery  Design Considerations  Lessons Learned.
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
St. Anthony Falls Bridge By: Timothy Brewer St. Anthony Falls Bridge Backround Location: Minneapolis, Minnesota Design: Steel Truss Arch Bridge I-35.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Oakland Jr. High – STEM Classes – Project Update and 3D Printing March 26, 2015.
Spliced Girders A Producer’s Perspective
By George C. Lee University at Buffalo
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
Bridge Engineering (9-1) Suspension Bridges I. *Components: Anchorage (blocks or tunnel type), towers, main cables, hangers, stiffened (box) girder and.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Generating Construction Drawings from RM Bridge
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
There are 2 Types of Bridge Inspectors – Class B and Class A.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Design of Crane Components
Empowering Your Business Infrastructure CORPORATE PROFILE PRESENTATION.
Selection Criteria For Short-Span Bridges Construction Methods
Construction Methodology for Suramadu Approach Bridge
Construction Methodology for Suramadu Main Bridge.
Totally Precast Concrete Bridges
YOUR BEST CONNECTIONS All parties concerns and interests combined
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Offsite manufactured Bridges
Posting Bridges for Specialized Single-Unit Trucks
Required Drawings and Info for Formwork or Scaffold Design
Advisor: Dr. Bilal El Ariss
There are 2 Types of Bridge Inspectors – Class B and Class A.
Danube Bridge Vidin – Calafat
Ness Bridge Construction
Construction Examples in Japan High Capacity Micropile
Chapter 5: Substructure
A New Precast, Pre-stressed Bridge Deck System
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Concrete Structures DR. Nabil Dmaidi.
STRUCTURAL TIMBER FRAMING
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
Western Europe – Western China motor road “Almaty-Khorgos”
CMS Gantry for Detector Lowering
Totally Precast Concrete Bridges
The Great Belt East Bridge
Chapter 6 Erection Manual Format
5.07_Edaphic Mechanics & Substructure - Types of foundation
Presentation transcript:

1 9 th Oct Design and Construction of Main & Crescent Bridges

2 Dubai Waterfront Palm Jebel Ali Palm Jumeirah The World Palm Deira Location

3 Trunk Frond C1 L=380m 3Lanesx2 L=380m 3Lanesx2 M1 L=1,200m 4Lanesx2 L=1,200m 4Lanesx2 C3 L=380m 2Lanesx2 L=380m 2Lanesx2 C4 L=380m 3Lanesx2 L=380m 3Lanesx2 M3 L=1,450m 4Lanesx2 L=1,450m 4Lanesx2 A = 11,600,000 m 2 Nakheel Site Office PC Yard Site Office PC Yard Site Office Site Layout

4 Main and Crescent Bridges Project, Palm Jebel Ali ~ (44months) US$ 350,286,921 (AED 1,285,553,000) NAKHEEL PARSONS PTG Halcrow International Partnership Item Main BridgesCrescent Bridges Sum M1M3C1 / C4C3 Total Length1,200mx21,450mx2380mx2x2380mx27,580m Steel Rebar (Dia.16~40mm) 15,295ton19,421ton14,385ton5,540ton54,641ton Concrete (Strength 40~50Mpa) 82,538m 3 100,601m 3 61,361m 3 23,898m 3 268,398m 3 Design & Build (Lump Sum) Project Name Construction Period Contract Amount Employer Consultant Designer Contract COWI 3 rd Party Checker Contract

5 23.5m Main Bridge

m Crescent Bridge

7 Description Detail Design M1 Bored Piling Substructure Superstructure (PSM) M3 Bored Piling Substructure Superstructure (PSM) C1 Bored Piling Substructure Superstructure (FSM) C4 Bored Piling Substructure Superstructure (FSM) C3 Bored Piling Substructure Superstructure (FSM) Pavement Utility Progress ( %)12.6 %44.7 %82.4 %100.0 % 32% Work Programme

8 Casting Cell (Mould) Steel Shop Gantry Crane Rebar Jig Steam Curing Chamber Batch Plant PC Yard area : 700m x 200m Office Stock yard Workshop Launching Girder Seg Transporter DescriptionQty Casting Cell Typical Seg.6set Pier Seg.2set Gantry Crane 180 ton2nos 30ton1nos Tower Crane3nos SteamCuring Chamber8set PC Production / PC Yard Layout

9 Casting Mould Match Casting Rebar Jig Steam Curing Gantry Crane Batching Plant Workshop Manipulator PC Production / PC Yard Overview

10 PC Erection / Transport - Self weight of transporter : 44ton - Carrying capacity : 170ton - Length : 27.1m - Width : 4.68m - Carrying speed : 3km/hr 1500m 800m 1600m 850m M1 M3 Transporter Hydraulic cylinder 27.1m Carrying Path Transporter

11 Plan View Lateral ViewWinch Group Typical Section 127m (1023 ton) Image of Launching Girder PC Erection / Launching Girder

12 Daily Manpower On Site Manger / Engineer Operator Electrician / Mechanic ,353 Tool Box MeetingRefreshing Shelter Worker / Etc.1,128 Supervisor / Foreman 55 Manpower Nationality Bangladesh 719 Thailand 84 India 219 Pakistan 25 Philippines 35 1,353 China / Etc. 271 Worker Camp Progress / Manpower

13 SEGMENT PRODUCTION YARDSEGMENT TRANSPORTATION SEGMENT ERECTIONMAIN BRIDGE 1 SPAN 24 Progress

14 CON’C BATCH PLANT ABUTMENT BORED PILE CRESCENT BRIDGE 1 BRIDGE PIER HEAD Progress

15 THANK YOU