1 Danube Bridge Vidin – Calafat
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications Danube Bridge Vidin – Calafat Integrating Bulgaria into Europe

2 The bridge links Vidin (Bulgaria) and Calafat (Romania)
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications The bridge links Vidin (Bulgaria) and Calafat (Romania)

3 This corridor is essential to link Bulgaria to Central Europe
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications This corridor is essential to link Bulgaria to Central Europe The Bridge itself is vital for the economy of the region of Vidin, currently hidden in a corner of the Bulgarian map and isolated from the rest of Europe by the Danube

4 Republic of Bulgaria Ministry of Transport, Information Technologies and Communications
Main features 4 lanes motorway + single track railway + bike & pedestrians lane Total length: 1391 m (main bridge) m (railway approach) Maximum deck width: m Maximum span: 3 x 180 m over the navigable channel Highest point over average Danube level: 54 m

5 Cross section – Navigable Channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications Cross section – Navigable Channel

6 Cross section – Non-navigable Channel &Railway approach span
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications Cross section – Non-navigable Channel &Railway approach span

7 Republic of Bulgaria Ministry of Transport, Information Technologies and Communications
TECHNICAL MILESTONES FOUNDATION made of Ø 2 m bored piles up to 80 m deep Main bridge deck core made up of PRECAST SEGMENTS EXTRADOSSED deck in the navigable channel Pile test on Romanian Bank, June 2009

8 FOUNDATION in Navigable Channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications FOUNDATION in Navigable Channel Rigs placed on floating pontoons 18 m steel cases inserted 3 m deep in the clay layer Up to 80 m pile depth required state-of-the art equipment to be mobilized Pile caps 40 x 13 m cast on precast slabs welded to steel cases, supported on 24 piles

9 FOUNDATION in Navigable Channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications FOUNDATION in Navigable Channel

10 FOUNDATION in Navigable Channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications FOUNDATION in Navigable Channel 24 piles Ø 2 m per pier Up to 80 m pile depth required state-of-the art equipment to be mobilized Pile caps 40 x 13 m cast on precast slabs welded to steel cases Special vessel impact protection precast elements

11 FOUNDATION in Navigable Channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications FOUNDATION in Navigable Channel

12 Republic of Bulgaria Ministry of Transport, Information Technologies and Communications
PRECAST SEGMENTS Deck core is divided in pieces (segments) perpendicular to the longitudinal axis Segments are precast at a precast yard No longitudinal rebars. Segments are joint together by means of prestressing cables Side deck cantilevers are either precast or cast in situ in a second stage

13 PRECAST SEGMENTS Non-navigable channel Navigable channel 2.15 m long
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications PRECAST SEGMENTS Non-navigable channel 2.15 m long 70 to 90 Tons Navigable channel 4.19 m long 240 Tons

14 PRECAST SEGMENTS at the precast yard
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications PRECAST SEGMENTS at the precast yard Every new segment is cast against the previous one to ensure perfect fitting Extremely low tolerances require high accuracy equipment

15 Segments erection in non-navigable channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications Segments erection in non-navigable channel Sequence of erection by means of a launching girder

16 Segments erection in non-navigable channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications Segments erection in non-navigable channel By means of a movable launching girder

17 Segment erection in navigable channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications Segment erection in navigable channel Segments in the midlle of span Segments close to pier

18 Segment erection in navigable channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications Segment erection in navigable channel

19 Precast segments advantages
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications Precast segments advantages Prefabricated construction allows improved quality of the deck Quicker deck construction due to 4 simultaneous precast lines segments = 480 m erected in 150 days Competitive cost

20 EXTRADOSSED DECK in navigable channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications EXTRADOSSED DECK in navigable channel Extradossed cables contribute to prestressing No need for high pylons Cheaper than other solutions (i.e. cable stayed deck)

21 EXTRADOSSED DECK in navigable channel
Republic of Bulgaria Ministry of Transport, Information Technologies and Communications EXTRADOSSED DECK in navigable channel State-of-the-art extradossed system BBR Hiex Cona

22 Republic of Bulgaria Ministry of Transport, Information Technologies and Communications
Благодаря