12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

ATLAS Module building at Glasgow
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
ESODAC Study for a new ESO Detector Array Controller.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Mechanical Status of ECAL Marc Anduze – 30/10/06.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
Target Controller Electronics Upgrade Status P. Smith J. Leaver.

Production and Testing Status V. Fisch, T. Kiss, T. Tölyhi, V. Veszprémi BPIX Supply Tube Electronic Boards.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
A multi-chip board for X-ray imaging in build-up technology Alessandro Fornaini, NIKHEF, Amsterdam 4 th International Workshop on Radiation Imaging Detectors.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
21 Nov 2013 Juergen Thomas: ATLAS Tracker Upgrade: Hybrid Production and Test Setup at Birmingham 1 ATLAS Tracker Upgrade: Hybrid Production and Tests.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
WP3_Bham; 29May 2014; John Wilson1 Heated plate curing Tests with 130nm hybrids and glass ASICs the glue thickness is controllable. i)Room temp curing.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
US stavelet update 12th April PPB2s on serial power side 12 Apr SAMTEC connector (floating) Bond pad (connected to EoS through WB + bus tape.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Making a 24hr Timer.
Berkeley status Aug 10th, 2012.
Cold Temperature Test Jig
→ need to guide UV light into gap; also beware temp effects
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Hybrid Issues.
ITK Strip Module Meeting; 12st October 2015
Equipment for Assembly – UK Experiences
Group meeting, 2nd Sept, 2013; JAW
Presentation transcript:

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture was taken have added stronger cooling fan (12cm, 12V, 0.4A) above hybrid. Simple handheld IR temperature measurement tool shows: ~36C at chip - Power supplies CPX200 for hybrid, HSIO (12V) and cooling fans. Test system with Hybrid (1)

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 2 Test-Hybrid from Liverpool with 20 chips (‘Chip6 not working’ sticker) One hybrid on panel, panel screwed onto bonding plate. Powered 3.3V DC (actually should be 2.5V, but then don’t get data transmission. Same behaviour with or without LVDS Adaptor board.) Current drawn: A Test system with Hybrid (2)

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 3 Hybrid on panel from Liverpool initially didn’t draw any current. Microcope inspection: No wires between hybrid and panel. -> Simon added those using our Hesse wire- bonder. Top image: Power input side. Bottom pads are on hybrid, top side is panel. Wire-boding hybrid to panel Bottom Image: Data-lines (LVDS) side. Bottom pads are on hybrid, top side is panel. Some wire-pads not to be connected. Our connections are correct (Simon send picture to Ashley in Liverpool to verify)

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 4 Hybrid power-up: ‘st_nmask’ test -SCTDAQ s/w setup modified to run in ‘Hybrid’ mode (before: Single-Chip testboard mode) Thanks again to Bruce and Peter at RAL. -Running:.x NoBCCSetup.cpp -‘st_nmask’ shows: All 20 chips responding -> Now can start running more serious tests...

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 5 First Hybrid test: ‘StrobeDelay0.4’ Left: Screenshot of ‘ScanData’ histo window of ‘StrobeDelay 0.4’ test (Faulty ‘Chip6’ showing ?) Below: $SCTVAR/ps/ABCNHybrid_F02_ StrobeDelayPlot_ _ ps

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 6 Glue Tests (1) Image: Glass ASICs on hybrid test cured overnight. Top hybrid: Earlier attempt, Middle hybrid: latest attempt. Visible improvement “There is one die (Top, 5th fromright) that is on the limit but it would pass, there is no glue touching the bond pads. In the image there is an example at the top of a previous glass ASIC test that had too much glue that spread onto the bond pads, this makes a good comparison.” Next: One more Glass ASIC test, then use real ASICs.

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 7 Glue Tests (2) … the same image after some Photo Editor treatment … Top hybrid: Earlier gluing attempts, bottom hybrid: latest attempt.

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 8 Back-up Slides

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 9 Single-Chip Testboard (1) -Test mode: “CaptureBurst”. One of ABC-N chip’s ‘self-test’ modes. -Left side of signal pattern: Data header. Right side: area should be very close to full height. Indicating ABC-N internal analogue voltage circuitry is active (this required jumper switch) -Location of entries indicates clocks are ok (HSIO at same frequency as ABC-N chip)

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 10 -Histogram: Test mode: ‘st_nmask’: Black triangle means ‘Good’. One triangle per chip. -Scope screenshot: ‘DelayScan’. LEMO output from HSIO (after transformation LVDS->TTL inside Xilinx FPGA, ie ‘by definition nice signals’) Single-Chip Testboard (2)

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 11 Top-right: HSIO and Interface Board. Bottom-left: One-hybrid- panel from Liverpool. Flat-ribbon cable carries ‘Clk, Control, Gnd and Dataout’ signals (4 LVDS-pairs) HSIO at Poynting basement Test system with Hybrid (1)

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 12 The Hybrid under test (Cooling fan moved away) Left-hand connector: Datalines (8 LVDS channels). Extra power input for LVDS drivers (3.3V, 0.26A) Right-hand connector: Power input 3.3V (drawing A). Serial powering. Test system with Hybrid (3)

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 13 Simon‘s Work in the Clean-Room: Gluing and Curing Gluing: Simon has performed a large number of tests applying glue using mechanical jigs from Liverpool. Problems encountered: Too much or too little glue at each chip, esp glue unequally distributed, in worst case leaking - could touch wire-bonds !. Simon visited Liverpool in July. One crucial problem identified: One jig was slightly bent, now replaced. Procedure needs to be ‘learned’, esp how to swipe over jig to distribute glue (current best results: ‘one chip(-pair) at a time, back and forth once’) Now: Gluing ‘Glass-ASICs’ (same size and similar weight to real ASIC). “Curing (chemistry): From Wikipedia, the free encyclopedia Curing is a term in polymer chemistry and process engineering that refers to the toughening or hardening of a polymer material by cross-linking of polymer chains, brought about by chemical additives, ultraviolet radiation, electron beam or heat.”

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 14 Ideas for improvement of curing procedure With current materials (two vacuum jigs available, which can’t be put next to each other on a panel due to clearance), only two hybrids could have chips to be glued to them at the same time (ie 2 out of the 8 on each module). Then follows a 24h curing period at room temperature under continuous vacuum ! Simon is thinking about how this can be optimised. Method called ‘Soft Cure’, for 2 hours: Glue still ‘soft’ inside (pokeable), but hard enough to support chips (ie not easily movable under sheer force). Helped by ‘lightly’ heating to 30C-40C, using heating plate to be made in our workshop. Ideally could shorten time needed for one module from 4 days (with long waits) to 1 day (with much less waiting). Sheer-testing very useful to quantify curing stage (“epoxy crosslink”) Info from Liverpool: New hybrids are ‘copper balanced’, ie ‘heavier on the sides’, so don’t bend as much. May not even need vacuum during curing.

12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 15 Next Steps Simon is soon moving to gluing and curing real ASICs – we have a lot of ‘old’ prototypes, ABC-N 250, cut as dies (from Glasgow) Continuing with test system setup for hybrid, esp run more complex tests, called ‘StrobeDelay’ and ‘3PointGain’. Discuss results with experts (at RAL, Liverpool) Probably connect and test one of the hybrids we’ve assembled in B’ham Further production preparations on-going: New power-supply units purchased by the UK groups (remote- controllable: TTI CPX400DP), B’ham will receive one, needs to be integrated into HSIO test system, s/w can then control voltage/current. Simon’s ideas for curing process optimisations under discussion with UK colleagues John and Juergen are offering a Yr4 project on hybrid tests, ie practical part of that project to start January ’14 Next Generation ABC-N chip on its way: ABC-N 130. In Birmingham about end of year ? UK colleagues are designing new testboards, hybrids, s/w interface.