D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector.

Slides:



Advertisements
Similar presentations
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Advertisements

Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Beam Position Monitors MICE CM Harbin January, 2009.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE CM 16 October 8, 2006.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
/t/ / I d/ /d/ Try Again Go on /t/ / I d/ /d/
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
Main Injector at Fermilab. Silicon Vertex Tracker Integrated system of barrels and disks ~ 800k total channels.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Miniature Centrifugal Compressor Development Kevin Finney Ray Zhou Dr. Kapat Dr. Chow October 18, 2002.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
EC Cu-LMTs -Status Report- Ulrich Parzefall Universität Freiburg.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Normal text - click to edit MAPD/MPPC Characterization & Axial PET 1.
D0 PMG 4/19/01 Completed Reportable Milestones MilestoneBaselineActualVar. H Half-Wedge Fabrication 20% Complete 10/15/99 0 w 3 Chip Ladder Fabrication.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
3D PUZZLE PYRAMID Example Text This is an example text.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Lukens - 1 Contingency Reduction Review – 27 May 2005 The Run IIb CDF Detector Project Contingency Reduction Discussion Patrick T. Lukens Fermilab 27 May.
SciFi option for neutrino target tracker
Tracker Outer Barrel Silicon
Presentation transcript:

D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector  Curved Optical Connectors u New CNC machine in operation at Village Shop u Barrels 8,7,6,2 done s Currently, working on 1 and 5 u Should finish before Christmas  Kuraray Fiber Order u They are ahead of schedule u We should not be paced by fiber deliveries  Manpower u Lost two contract employees recently u Will try to replace ASAP s Points to difficulty with this type of help

D0 PMG 12/2/99 Fiber Tracker Status  Ribbon Production u Continues

D0 PMG 12/2/99 Fiber Tracker Status  Ribbon Mounting u Continues s 8 Axial complete today s Rate improving s 8 Stereo should go much better u Extrapolation from today s 1 week delay in schedule for completion

D0 PMG 12/2/99 Fiber Tracker Status  8b - RMS position resolution of mounted Axial ribbons

D0 PMG 12/2/99 Fiber Tracker Status  VLPC Cassettes u Hope to get next batch of Flex next week. s Last shipment - 8 circuits (about 40% yield at vendor) –7/8 tested good here Single shift operation