I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Great Western Corridor Feasibility Study
Harlan to Hazard Study Public Workshop #2 Harlan to Hazard Study Public Workshop #2 Harlan, Leslie, & Perry Counties, KY December 2003 Harlan, Leslie,
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Santa Maria River Bridges Widening. Project Location.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
New I-65 Interchange at Worthsville Road Welcome!.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
I-69 Strategic Planning Corridor Study: Fulton To Eddyville, KY Fulton, Hickman, Graves, Marshall, Livingston, Lyon Counties Public Meeting November 15,
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Project Background STIP update - City requests cancellation of US101 at Logan Road EA and proposes new modernization project: US101 at 32nd Street.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No New Hanover and Brunswick Counties, North Carolina October.
Good Afternoon/Introductions. Missoula’s LRTP Process Missoula Growth Workshop Base Case Scenario Envision Missoula Workshops Vision Scenario Envision.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
PROJECT UPDATE PUBLIC OPEN HOUSE #5 MARCH 12 4:00 PM – 6:00 PM Northern Service Center.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
New Interchange at I-69 and 106 th Street Fishers City Hall Auditorium Thursday, September 10, 2015.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Planning and Environmental Linkages MPO/COG Conference February 24, 2016.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
The I-465 West Leg Reconstruction Project
Chapin Town Hall Meeting
Project Management Team Meeting #3
HSM Applications to Multilane Rural Highways and Urban Suburban Streets Safety and Operational Effects of Geometric Design Features for Two-Lane Rural.
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
S.R. 26 Road Rehabilitation in Clinton County
Wakulla County Airport
2040 Regional Transportation Plan Sparks Citizens Advisory Board
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004

7 Sections of Independent Utility Seven Independent Studies 2nd Tier

 Route 19 (MP 174) to Lake St. Louis Blvd (MP 214)  40 miles in length, 13 Existing Interchanges  Current ADT: 29,000 to 68,000  Year 2030 Projected ADT: 74,000 to 98,000 SIU #7 2nd Tier

Conceptual Corridor Reevaluation Rural Area Widening Alternatives Analysis Urban Area Widening Alternatives Analysis Interchange Alternatives Evaluation Environmental Impact Statement Public Involvement Program Major Study Components

Conceptual Corridor Reevaluation Existing I-70 Corridor South Conceptual Corridor Near North Conceptual Corridor Far North Conceptual Corridor

Conceptual Corridor Reevaluation Criteria Compatibility with Local and Regional Planning Goals Local and Regional Economic Impacts Impacts on Natural Resources Preliminary Construction and Maintenance Costs Transportation Impacts

Local and Regional Land Use and Transportation Planners 30 Participants from Warren, St. Charles and St. Louis Counties Generally opposed to new corridors Land Use Forum 2nd Tier

Travel Demand Modeling for Conceptual Corridor Reevaluation GEC’s Statewide Travel Demand Model EWGCC St. Louis Region Model Evaluate “Downstream” Traffic Impacts on St. Louis County

Rural Area Widening Alternatives Evaluation Western Terminus (MP 174) to just west of Warrenton (MP 189) Widen to North or South Considered Displacements, Cultural Resources, Wetlands, Floodplains, Crossovers Documented in Technical Memorandum

Urban Area Widening Alternatives 4 Through Lanes in Each Direction 12-foot Inside Shoulders Separated by Barrier Room for Future 5 th Lane Reserved to Outside Offset from Existing Centerline Varies

Interchange Alternatives Evaluation Brainstorming / Sketching Study Team Review – Constructibility, Driver Expectation Interchange Workshops with Locals Screening based on Engineering, Traffic Operations, Socioeconomic and Natural Environment Impacts

Traffic Operations Analysis Multiple levels of analysis = Multiple ‘tools’  Conceptual Corridor Evaluation: HCS  Design Support: SYNCHRO, aaSIDRA  Alternatives Evaluation: VISSIM

VISSIM  Allows for system analysis  9 PM Peak Hour models 3 per county: existing, 2030, and 2030 alternate Mainline Interchanges  System to System  Diamond  Diamond with roundabouts  SPUI Crossroads  Some frontage road intersections

Current Status of Study Draft Environmental Impact Statement Final Review Next Week Public Hearing on Draft EIS November/December, 2004 Final EIS Early 2005 Record of Decision for SIU 7, Spring 2005