Presentation is loading. Please wait.

Presentation is loading. Please wait.

2040 Regional Transportation Plan Sparks Citizens Advisory Board

Similar presentations


Presentation on theme: "2040 Regional Transportation Plan Sparks Citizens Advisory Board"— Presentation transcript:

1 2040 Regional Transportation Plan Sparks Citizens Advisory Board
November 10, 2016

2 2040 RTP Community Outreach to Date
Youth Forum – February 29th Economic Development Forum – March 8th Regional Rail and Bus Transit Forum - March 14th Freight Forum – March 31st Senior & ADA Transportation Forum – April 14th Veterans Transportation Forum - April 19th UNR-TMCC Millennials Forum – May 2nd Community Workshop – June 28th Community Workshop – August 4th

3 2040 Regional Transportation Plan Population & Employment Projections
Washoe County Consensus Forecasts (TMRPA, 2016) Population to reach 565,402 by 2040 Increase of 120,671 Employment to reach 360,898 by 2040 Increase of 93,568 TRI Center Employment Forecasts (Storey County, 2016) Employment to reach 33,564 by 2040 Increase of 28,464

4 Proposed Schedule for Major Projects
I-80/I-580/U.S. 395 Spaghetti Bowl Improvements Design: ROW/NEPA: Construct: U.S. 395 Widening ROW/NEPA: Construct: West Sun Valley Arterial Pyramid Highway – U.S. 395 Connector Construct: (Phase 1); (Phases 2-9) Incorporate technical analysis Consensus forecasts Cost estimates Travel demand model forecasts

5 SouthEast Connector 5.5 Mile Roadway with Four Lanes
Includes Paved Walking Path More than 600 New Trees New 80 Acre Wetland Complex

6 SouthEast Connector Scheduled for Substantial Completion in Dec. 2017
Recent Paving Activities 40% Complete with Final Phase Planned Closed of Pembroke Drive Next Two Weeks

7 SouthEast Connector Mira Loma Drive Intersection Simulation

8 SouthEast Connector Mira Loma Bridge Simulation

9 SouthEast Connector Huffaker Narrows Bridge over Alexander Lake Road Simulation

10 Pyramid/McCarran Adding Through-Lane in Each Direction on Pyramid
Dedicated Turning Lanes on Pyramid and McCarran Paved Multi-Use Path High-Crash Location

11 Pyramid/McCarran

12 Pyramid/McCarran Paving Activities
On-Schedule for Spring 2018 Completion Business Access Preserved Business Support Program pyramidmccarran.com

13 4th Street/Prater Way New All-Electric Bus RAPID Transit Line
Links Downtown Reno and Downtown Sparks Improve Sidewalks and Landscaping Underground Utilities New Bike Lanes Breaks Ground in Early 2017

14

15 Your RTC. Our Community.


Download ppt "2040 Regional Transportation Plan Sparks Citizens Advisory Board"

Similar presentations


Ads by Google