ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Detectors and HV Channels in combined TB. HEC front modules (1-4) 32 HV channels HEC front modules (5-8) 32 HV channels HEC rear modules (1-8) 32 HV.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Some cryostat scintillator slides for Monday’s meeting Michigan State University.
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
Tracker Summary Alan Bross MICE CM October 10, 2007.
HEC Parameters from As-Built knowledge HEC is a homogeneous detector and any mechanical tolerances are well below any significance for physics..... this.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
The HCAL barrel absorber structure
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
The HEC Wheel Assembly Equipment (Mechanical) Chris Oram for Jan Soukup & Roy Langstaff.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
The Simulation of the HEC What is presently in the description in GeoModel as presented by Joe Boudreau versus What should be in…
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
2005-Apr-04MPI Calorimeter Plans for SLHC1 ATLAS at SLHC Calorimeter R&D at MPI Three possible routes being investigated: Verify feasibility for high intensities.
First Wall Panel - Overview
Florian Buchsteiner (HEPHY Vienna)
Planning for Proto-DUNE PD Installation and Cabling at CERN
BSS Prep work at CERN and Acceptance of Parts
News about the WA104 Programme
Status of the PANDA Solenoid Magnet Production in BINP
Status of the PANDA Solenoid Magnet Production in BINP
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001

HEC Management Positions Convenor Oram CERN ActivitiesSchacht Cold CERNChekulaev Chief Engineer Mechanical: Langstaff (Soukup) Electrical: Fent QC Wielers

HEC Organisation, during LARG Week HEC General Meeting (Oram) HEC/FWD Test Beam Meeting (Schacht) HEC QC Meeting (Wielers) HEC Group Representatives Meeting (Oram/Schacht) HEC Decision s LARG Steering HEC: Oram Test beam: Schacht HEC Discussio n HEC Institute Tasks, QC Test Beam Tasks, Analysis Report Oram Schacht Report s HEC Action List Trip Reports Report s

LARG Organisation (in ppt)

Deliverables Institutes & Responsibles Deliverable Responsible LARG Convenor HEC Convenor Bi-weekly Report LAMB Reports PPT LAMB Minutes HEC Org Outside LARG Week Convenor Site Visits Trip Report

GAP Components (simplified) Final Cut CLKapton for PAD & EST’s C.Oram TRIUMF 100% Etched CuCKapton for PAD’s L. Koepke MAINZ 100% PAD Boards without pins 100% C.Oram TRIUMF PAD’s with pins 50% C.Oram TRIUMF PAD’s with pins 17% L.Koepke MAINZ PAD’s with pins 33% A. Komar LPI EST’s 80% A. Komar LPI EST’s 20% C. Oram TRIUMF Honeycomb Mats cut to shape 100% C.Oram TRIUMF <95% Finished>95% Finished

HV and Signal Wiring Components (P. Schacht MPI) Module Side-Wiring Signal Harness 100% Module Side-Wiring HV Harness 100% Pre-Amplifier/Summing Boards Mounting Materials 100%

FRONT Module Stacking (33/33) TRIUMF (C.Oram) Module Stacking 50% Copper Plate Machining Alberta J. Pinfold Module Stainless Steel Components Shipping frames Test and Ship

Front Module Stacking MPI (4/13) (P. Schacht) Module Stacking 50% Copper Plate Machining(7) Alberta J. Pinfold Module Stainless Steel Components Dubna M. Kazarinov Shipping frames Dubna M. Kazarinov Test and Ship Copper Plate Machining Dubna/Minsk M. Kazarinov

Front Module Stacking Dubna (6/21) (M. Kazarinov) Module Stacking 50% Copper Plate Machining Dubna/Minsk Module Stainless Steel Components Dubna Shipping frames Dubna Test and Ship

Rear Module Stacking (9/33) TRIUMF (C. Oram) Module Stacking 50% Copper Plate Machining Alberta J. Pinfold Module Stainless Steel Components Shipping frames Test and Ship

Rear Module Stacking MPI (10/12) (P. Schacht) Module Stacking 50% Copper Plate Machining Protvino A.Moiseev Module Stainless Steel Components Protvino A.Moiseev Shipping frames Denisov/Moiseev Test and Ship Copper Plate Machining ISTC S. Denisov Module Stainless Steel Components ISTC S. Denisov

Rear Module Stacking Protvino (11/22) (Denisov/Moiseev) Module Stacking 50% Copper Plate Machining Protvino A.Moiseev Module Stainless Steel Components Protvino A.Moiseev Shipping frames Test and Ship Copper Plate Machining ISTC S. Denisov Module Stainless Steel Components ISTC S. Denisov

Wheel Assembly (B180) Stand Canada C.Oram Table Canada C.Oram Rotator Canada C.Oram Crane Canada H.Stenzel Cleanroom CERN P.Fassnacht T6 Cryostats P.Pailler Wheel Assembly HEC P.Schacht (Mech: R. Langstaff) (Elec: Wolf Cwienk)

Module Testing at CERN Mechanical Size Test Box Canada C.Oram Stands for Cold Test Canada C.Oram Cryostat, Cables, Electrical Test Gear, etc MPI P.Schacht Cold Test (7/8 th ) Institute,Schacht,Chekulaev Beam Test (1/8 th ) Institutes,Schacht,Chekulaev Modules 50% Canada,17% MPI,17% Dubna,17% Protvino Database TRIUMF M.Wielers This is our Central MODULE QC

Electronics & Miscellaneous Materials for Wheel Assembly Shims for under Inner Tie Bars Protvino A. Moiseev Shims for under Connecting Bars Dubna M.Kazarinov Inner Tie Bars MPI P.Schacht Sliders and Key Slot TRIUMF C.Oram Pre-Amplifiers Boards MPI P.Schacht Patch panel Kosice D.Bruncko Quadrant Cabling MPI P.Schacht

Summary of Previous Reviews and Planned Reviews (Mech): HEC (Internal) Module Design Review TDR PRR Modules Covered Modules including Kaptons HEC (Internal) Wheel Assembly Review (Marseille) PRR Wheel Assembly Equipment Stand Table Rotator (shared with EMEC, provided by HEC) PAR Module Assembly (written)

Summary of Previous Reviews and Planned Reviews (Mech): Our procedure has been to take the recommendations of these reviews… move them onto the HEC ACTION LIST… Causing them to be discussed in the Open Meetings and Group representatives meeting However the HEC ACTION LIST gets up-dated each LARG week, and the history gets lost I propose to become more formal in storing of, and reviewing of recommendations of reviews

Production Status 50% Modules Made (all production sites past 25%) 45% Modules Cold Tested 60% PAD boards Made 60% EST boards made 97% Cold Electronics made and tested Mid-July contract for Table, Stand, & Rotator let +3% clause for early delivery -0.5% clause for late delivery BLG 180 Clean room “ready” Clean room crane not ordered yet

Production Status… Canadian & European Modules Front Modules Made(Cold CERN)/Allocation TRIUMF 33(33)/33 Dubna 6(6)/20 MPI4(4)/13 Rear Modules TRIUMF9(3)/33 Protvino11(11)/22 MPI10(10)/12

Production Schedule : Canadian & European Modules Front Modules Finish Delivery Date/Finish Cold Test date TRIUMF Finished Dubna Limited by Copper Delivery and Machining ($) MPI Awaiting Alberta to finish TRIUMF plates and start machining front MPI plates Rear Modules TRIUMF Limited by Container Shipping Schedule to 6/11 weeks Protvino Copper purchase an issue ($) MPI All but finished