Appendix 8b. PUBLISHED STANDARDS RELATED TO OUR ACTIVITY.

Slides:



Advertisements
Similar presentations
Ministry of Foreign Affairs, Latvia 1 EC Cooperation with Third Countries Typology of EC Service Contracts prepared by Mauro Napodano
Advertisements

Pre qualified Contractors or Professional Contractors: Role of BPP in stopping quackery in the Water Industry Presented by Engr. Emeka Ezeh OFR Director-General,
. Report from the 5thmeeting of the Safety & Security Committee Report from the 5th meeting of the Safety & Security Committee Paris, April 29 th 2010.
THE MAINTENANCE PLANNING OF SERBIAN RAILWAY INFRASTRUCTURE IN ACCORDANCE WITH EUROPEAN STANDARDS University of Belgrade, Faculty of Civil Engineering University.
Contractor Safety Management
PAWEL MAGDZIAREK IRREGULARITIES DETECTED DURING IMPLEMENTATION OF THE REGIONAL OPERATIONAL PROGRAM FOR WIELKOPOLSKA REGION.
WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli.
Serbia and Montenegro Council of Ministers Ministry of Internal Economic Affairs REGULATORY RULES TODAY AND TOMORROW Analytical overview: Mr Alija Haskic,
Future Defence Aviation Safety Regulation Module 3 EMAR Part M – Continuing Airworthiness Requirements May 2015.
The European Railway Agency in development
China Compulsory Product Certification System- CCC Mark.
EFRTC welcome & presentation EC project, AUTOMAIN workshop, Paris, 4 th October 2012 Imrich Korpanec, EFRTC Secretary General.
‘RAILSAFE’ A Harmonised System for Education, Qualification and Certification of Railway Track Welders Developed in a Leonardo da Vinci Project Appendix.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
"certification service provider" Electronic Signatures
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
Conditions and Peculiarities of Submission of Complaints in Ukraine. Typical Errors/Infringements Relating to Submission of Complaints Kyiv, April.
Report about controlling activity and its results in the programme in 2013 TOP Monitoring Committee Meeting
. Cooperation of railway construction companies in Europe within EFRTC Joseph H.M. Urlings EFRTC Vice-President.
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
CEN TC 256/SC 1 Brief from plenary meeting Brussels, EFRTC General Meeting Prague, 22 nd June 2012 Imrich KORPANEC, EFRTC Secretary General.
DG Research - Directorate B - Unit 03: “Research Infrastructures” Brussels, 12th of November NOT LEGALLY BINDING - Page n°1 Presentation made by.
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
EFRTC and Czech Technology platform “Interoperability of railway infrastructure” Imrich Korpanec EFRTC Secretary General.
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
Zürich 27 May 2011 EFRTC Policy & Research Committee Market Strategy Report Jeremy Candfield Chairman.
Singapore, January Mr. A. Sánchez Director, TCB Why ICAO?
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
Roma, 1 decembre 2006 Meeting between Rete Ferroviaria Italiana and EFRTC Ing. Michele Elia.
Modernisation of EU public procurement policy Proposal of the Commission Directive on public procurement (replacing Directive 2004/18/EC) NB: The information.
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
The 4 th Railway Package: Impact for the keepers Clio Liégeois.
Public Procurement Uinsinn Finn Galway County Council Roads, Transportation, Marine.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
EFRTC General Meeting Welcome Jo Urlings, President EFRTC Zoetermeer, November 18 th, 2011.
1 Standardisation, Assessment, and Certification Legal Framework, Standards  Measurement Instrument Directive (2004/22/EC)  Interoperability Directive.
Support for the Modernisation of the Mongolian Standardisation system – EuropeAid/134305/C/SER/MN Training on standardisation Support to the Modernisation.
General Meeting Zurich Imrich KORPANEC CEN TC 256/SC 1 Brief from plenary meeting Brussels,
General Meeting Florence Secretary General report on Items 5 of the agenda Imrich KORPANEC.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Office of Procurement Services.  Vendor Application Website: 
The renewables Directive 1.Sets mandatory national targets for renewable energy shares, including 10% biofuels share, in 2020 (Articles 3 and 5) 2.Requires.
General Meeting Zurich Markus HOFMANN Chairman of OTM Task Force On Track Machine (OTM) autorisation and x-acceptance.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – Energy – Upstream Hydrocarbons.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 6 – Company Law Bilateral screening:
The Central purchasing in Bulgaria: Current status and prospective TAIEX Seminar 9-10 December 2015 Ivanina Beleva Director of the Central Purchasing Body.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
REGULATORY RULES TODAY AND TOMORROW
NAB/RB Training Workshop In Valenciennes, April 2016
Content of Tender Dossier Instructions to Tenderers
Evaluation Grids Evaluation Grids.
Health and safety organization on construction site
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Low temperature chiller Market Survey
Meeting of the WG on Rail Transport Statistics 2-3 April 2009
Road Maintenance and Monitoring of Road Condition in Lithuania
COHESION FUND MONITORING COMMITTEE
MINISTRY OF ECONOMY AND FINANCE
Presentation transcript:

Appendix 8b

PUBLISHED STANDARDS RELATED TO OUR ACTIVITY

Qualification System for Railway Trackwork Contractors EFRTC in collaboration with EIM – European Infrastructure Managers have as objective an open European market for all railway track works. For this the actions to take are:  Harmonisation of procurement procedures;  Introduce the application of the European Standard EN Qualification system for Railway Trackwork Contractors in the TSI on high speed and conventional lines in order that the standard becomes mandatory;  European List of qualified Railway Trackwork Contractors for the type of activity and by size of contract;  Short list where national conditions are applied on technical requirements of trackwork equipment;  Short list to meet the scope of the standard EN 14969, i.e. identify the trackwork contractors that can be invited for tendering trackwork contracts.

REVIEW OF THE STANDARD EN The main points of review are:  Administrative and legal obligation:  Registration number Chamber of Commerce; legal status; year of founding  Declarations concerning the company’s and managing directors legal behaviour  Proof that the applicant has not suspended his business, is not the subject of insolvency procedure and is not bankrupt  Overview of taxes in the last three years  Financial criteria for qualification:  Statement by an authorised accountant that the information supplied is correct unless formally published annual accounts of the last three years are supplied  In case the applicant is a daughter company, these data can be supplied by the parent company, together with a declaration concerning financial guarantees by the parent company

 Technical criteria for qualification:  Type of activity: the In-track welding must be incorporated in the activities of maintenance and track laying or renewal  Qualification by activity and size of contracts: annual turnover in each category for the past three years. For each project declaration by the IM of acceptance of works in accordance with EN “Plain line”, EN “Switches and crossing”, EN “Grinding and milling”  Qualification of personnel: key personnel must be proper personnel and speak local language  Equipment: the heavy equipment must be in accordance with the standards prEN Part 1 – 3 “Railbound construction and maintenance machines” and with circulation certificate realised by the national safety authority according directive 2004/49/EC  Qualification certificate:  Qualification body: national Infrastructure Manager  Qualification validity: three years  Review period: three years, in cases of changed or series complaints at once  Quality index: introduce an index of the Infrastructure unavailability imputable to the contractor

The second step to the review of the EN Qualification system for Railway Trackwork Contractors, is the qualification of the personnel for Railway Trackworks. For this we have the following:  EN : Qualification of aluminothermic welders, approval of contractors and acceptance of welds;  prEN xxxxx: Safety protection on the track during work;  Standards to elaborate  Qualification of Drivers of railbound construction and maintenance machines  Qualification of Technical Supervision Personnel & Technical Engineers of Trackworks

THANK YOU FOR YOUR ATTENTION