WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli.

Similar presentations


Presentation on theme: "WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli."— Presentation transcript:

1 WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

2 Homologation of track machines for delivery to customers – experience of manufacturer, Mr. Franz Messerli, Assistant to the Managing Director, MATISA Purpose of the presentation Franz Messerli EFRTC General Meeting, Paris, 11th June 2010

3 Purpose Purpose of this presentation Explain the evolution of the homologation process over the last 15 years Show some recently made experiences EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

4 Track maintenance machines Homologation process in the nineties Today's homologation process Experiences made with today’s homologation process Outlook Summary Questions Content Franz Messerli EFRTC General Meeting, Paris, 11th June 2010

5 Track maintenance machines EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

6 Track maintenance machines On-track machines look more and more similar to freight wagons, passenger coaches or locomotives ? EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

7 Track maintenance machines They are built as standard railway vehicles that can be incorporated in a train formation or for example tamping machines can transit on the track under their own power. EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

8 Track maintenance machines But other than conventional rolling stock who transport passengers or carry freight the main purpose of track maintenance machines is to maintain and renew the tracks. They are manufactured in small numbers, tailored to customers and market requirements thus almost never at 100% identical to another machine. EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

9 Homologation process in the nineties EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

10 B 66 U for DB in 1993 BZA 82 in Munich One handwritten page A4 of requirements Homologation process in the nineties Franz Messerli EFRTC General Meeting, Paris, 11th June 2010

11 Today's approval process EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

12 Today’s approval process Basic requirements are covered by the European Standard EN14033-1/-2/-3 “Rail bound construction and maintenance machines ” EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

13 Today’s approval process The following documents, calculations and proof must be delivered to the Railway Authorities Machine and bogie frame strength Proof of strength of mounted parts Resistance to longitudinal compressive load Powered and idle wheel set calculations Demonstration of safety against derailment Demonstration of running safety Demonstration of brake performances Demonstration of electrical contact resistances Demonstration of equipment to be monitored (pressurised tanks such as brake air reservoir, fuel tanks, diesel, hydraulic, pressure valves) Etc. EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

14 Some experiences made by MATISA Some experiences made by MATISA with today’s homologation process EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

15 Some experiences made by MATISA Over the last 15 years the MATISA internal amount of effort and cost for a European machine approval has been multiplied by big factors. For MATISA Switzerland the numbers are as follow: 1993 = 0.5 person for homologation 2010 = 10 people in testing and approval department 5 people in calculation department Design engineers spend 20 % of their time for the elaboration of approval related documents. Not counted management efforts used to overcome almost daily new problems and requirement. EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

16 Some experiences made by MATISA Cost comparison B 66 UC Salcef, 2005, under old approval process B 66 UC Fourchard, 2009, under today’s approval process, 12 times more in external cost EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

17 Some experiences made by MATISA Largely dependant on the person which signs off approval Interpretation of standard Know-how Experiences Background EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli Difficulties to keep up with the huge number of EU Standards

18 Some experiences made by MATISA Request of independent reviews by external certified testing bodies for: Brake testing EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

19 Some experiences made by MATISA Safety against derailment EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

20 Some experiences made by MATISA Running safety (UIC 518) EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

21 Some experiences made by MATISA Testing proof of safety against derailment for a 3 point suspension system, external cost of more than € 30K EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

22 Some experiences made by MATISA Machine and bogie frame calculations EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

23 Some experiences made by MATISA Wheel sets calculations EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

24 Some experiences made by MATISA EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli Little difference made between on-track machines and Locomotives/Rolling stock Tamping machine, re-testing of brake performance in the country of destination = nearly impossible WTM S+C carrying wagons 10 WTM approved for Germany 39 WTM delivered into 3 different countries, including Germany No known safety issue over last 10 years of operation To approve latest 3 for Germany it becomes necessary to go through whole new process again.

25 Some experiences made by MATISA Approval bodies do not care about cost, efforts and delivery delays due to the complexity of the homologation. EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

26 Outlook EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

27 Outlook Future homologation will be covered by TSI’s which are EU law Notified bodies (NoBos) will carry out approval against standards and elaborate technical file for submission to the national authorities The national authorities of a 3rd country should accept verification against a standard that had been carried out by the NoBo of another country EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

28 Outlook The TSI Noise has already to be applied for the approval in certain countries. The conditions have been made easier. Some of the conditions today are: No rain No snow Little wind Approved track (shape of the countryside, track material, rail roughness 1000 km travelled EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

29 Summary EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

30 Summary Efforts and cost for approval have dramatically risen over the last years. It seems very likely that the introduction of the TSI will further increase efforts, expenses and delivery times. On-track machines should not be put into the same category as locomotives or freight wagons. On-track machines are often manufactured in small numbers tailored to customer needs EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

31 Summary On-track machines travel much less over then network than other rolling stock The resistance of the national approval bodies and external independent experts will in our view still prevent the application of the Interoperability principle with the explanation that national specifications and procedures still apply. EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

32 Questions EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli

33 Tank you very much for your attention Franz Messerli EFRTC General Meeting, Paris, 11th June 2010


Download ppt "WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli."