Winchester Medical Center Campus Expansion June 21, 2011.

Slides:



Advertisements
Similar presentations
Hospital of the Future Construction Update as of Dec. 3, 2010.
Advertisements

FourFront Design, Inc. WDT Project Update August 3, 2012.
February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
FP- Level 0FP- Level 1FP- Level 3FP- Level 4FP- Level 5FP- Level 6FP- Level 7 INTERIOR Dining 2 Dining 1 Admitting FLOORPLANS EXTERIOR Site Plan Overall.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013.
Campus signage – Internal
Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update.
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
U-M Construction Forecast; April 2013 U-M Construction Forecast Spring – Fall 2013 As of April 25, 2013 Prepared by AEC Preliminary & Advisory.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
June 24, 2010 Sarasota Memorial Health Care System Projects Update Neighborhood Advisory Council June 24, 2010.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Elevations.
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
UWF BOARDS STRATEGIC PLANNING JUNE 3, 2009 UWF-Facilities Development & Operations-May 2009.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Space Planning and Construction. LDR Room Renovations Completed on August 21, 2013 Microbiology Lab Reorganization Completed on October 9, Willard.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
Office of Highway Safety Boston, Massachusetts July 10, 2006.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Learning, Health, and Safety Capital Project Alternates and Change Order
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.
Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council March 13, 2012.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
City Manager Report – May, 2016 Presented to: Minot City Council City Manager Report – May, 2016 Presented to: Minot City Council Lee Staab, City Manager.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Construction and Transportation Update Bayside Demo: ▸ Cut and capped utilities ▸ Demolished appendage building on the waterfront ▸ Demolition continues,
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
Aerial of the full site facing northeast taken on March 1, 2016.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
San Luis Potosi – New plant April 24th 2015
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
FRESNO COUNTY WEST ANNEX JAIL
Penn Medicine Chester County Hospital
Minuteman Vocational Technical Regional High School Progress
Carleton College Summer 2018 Science and Campus Construction Plan
Progress Report 11/10/11.
Steam Plant Rehabilitation Building and Smokestack
Minuteman Vocational Technical Regional High School Progress
Capital Outlay Workshop
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
The Anschutz Health Sciences Building Construction Update 8 April 2019.
Mandeville Center Upper Level West: Interior Inaccessible Element
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Winchester Medical Center Campus Expansion June 21, 2011

CONTENTS 1.PROJECT UPDATE 2.EXTERIOR CONSTRUCTION 3.INTERIOR CONSTRUCTION 4.LOOK AHEAD SCHEDULE (3 Months) VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion June 21, 2011

1.Heart and Vascular – Phase II, III and IV interior renovation underway 2.Laboratory – complete 3.North Tower – canopy steel forthcoming, exterior close-in nearing completion, interior gwb ongoing 4.Loading Dock – all bays open, new walls almost complete, new ceiling install forthcoming PROJECT UPDATE VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion AERIAL FROM NORTH June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion AERIAL FROM WEST June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion AERIAL FROM SOUTHEAST June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion AERIAL FROM NORTHWEST June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion TOWER ELEVATION June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion MAIN ED ENTRY PROGRESS June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion OBS UNIT OVER ED June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion PEDESTRIAN BRIDGE TO EAST June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion LDR CABINETRY MOCK-UP June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion ICU CORRIDOR AT NURSES STATION June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion ICU NURSES STATION June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion ICU ROOM PROGRESS June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion LOOK AHEAD SCHEDULE June 2011 continue exterior window installation continue elevator installation continue above ceiling work in ED complete above ceiling and utility work at Loading Dock continue interior renovation of Heart and Vascular wk of 6/6/11 begin interior wall close-in wk of 6/6/11 begin erection of canopy steel wk of 6/6/11 turn on new AC units wk of 6/13/11 begin exterior skin of ED and Boiler Plant wk of 6/20/11 begin sitework at ED wk of 6/20/11 begin curtainwall installation at stairs June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion LOOK AHEAD SCHEDULE July 2011 complete exterior window installation continue elevator installation continue above ceiling work in ED continue interior renovation of Heart and Vascular complete exterior of ED and Boiler Plant complete curtainwall installation at stairs continue canopy installation wk of 7/11/11 begin interior finish install June 21, 2011

VALLEY HEALTH - WINCHESTER MEDICAL CENTER WMC Campus Expansion LOOK AHEAD SCHEDULE June 21, 2011 August 2011 continue elevator installation continue above ceiling work in ED continue interior renovation of Heart and Vascular continue interior finish install continue canopy installation wk of 8/22/11 start final ED wk of 8/15/11 begin medical equipment ED