The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.

Slides:



Advertisements
Similar presentations
CBM - Straw Tube Tracker
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
IEEE Nuclear Science Symposium October 27 th 2005 The BaBar LST detector High Voltage system Design and implementation Gabriele Benelli K.Honscheid, E.A.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
CaRIBOu Hardware Design and Status
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Status of NA62 straw electronics Webs Covers Services Readout.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
MICE RF System Power Supplies, Control and Monitoring Status report
Mini-drawers, FE-ASIC , Integrator
Front-end electronic system for large area photomultipliers readout
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
The IFR Online Detector Control at the BaBar experiment at SLAC
Limited Streamer Tube Project Summary
Rack installation and local tests for the MEBT Chopper Rack
Quality Control Infrastructure
Presentation transcript:

The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University

K. Honscheid, Ohio State University, LST Readiness Review May 2004 This presentation will cover High Voltage Power Supply High Voltage Cable HV Connector HV Box (tube end) HV Board (HV capacitor, wire signals)

K. Honscheid, Ohio State University, LST Readiness Review May 2004 LST High Voltage Power Supplies

K. Honscheid, Ohio State University, LST Readiness Review May 2004 High Voltage Power Supplies 4 HV channels 80 Current Monitor Channels 320 Outputs (80 LST tubes) CANbus Interface Ethernet Interface External Signals & Interlocks

K. Honscheid, Ohio State University, LST Readiness Review May 2004 Requirements 3 HV supplies per sextants –6 for 2004 –18 total (+ spares) “Hospital” to re-condition bad LST tubes

K. Honscheid, Ohio State University, LST Readiness Review May 2004 Status Mechanics25 units ready Digital Board25 units ready HV Mother board20 units ready 30 assembled Current monitor800 units ready 1200 assembled Backpanel23 units assembled Complete HV Power Supplies7

K. Honscheid, Ohio State University, LST Readiness Review May 2004 System Architecture (BaBar) 2x 10KV Interlock Re-use RPC CAEN 127 System 1 A328 (10 KV, 2 mA, dual channel) pod per OSU HVPS RPC uses 3 A328 modules per sextant We will use 3 OSU HVPS per sextant Interlock allows HVPS box to disable corresponding A328 module CAEN SY127 OSU HVPS

K. Honscheid, Ohio State University, LST Readiness Review May 2004 High Voltage Cable Purchased multi-wire HV cable from Kerpen First shipment (2 sextants) at Colorado State (CSU) 2 nd Shipment arrived in Oakland Cable assembly at CSU –Banana plugs on power supply end (available) –In-line HV connector (prototype) –HV PC board (available)

K. Honscheid, Ohio State University, LST Readiness Review May 2004 HV Connector (Dave Warner at CSU) Injection Mold designed, samples available Passed electric safety committee Final mold complete ~10 cable assemblies by mid-may Cable production will follow module arrival schedule –½ sextant June 1 st –½ sextant mid-June –1 sextant July 1 st

K. Honscheid, Ohio State University, LST Readiness Review May 2004 HV Box Injection mold designed and parts ordered Expected to arrive at Ohio State May 5 Will go to CSU for conformal coating/potting

K. Honscheid, Ohio State University, LST Readiness Review May 2004 HV PC Board HV Capacitors in hand 1500 PC boards in hand 400 PC boards assembled 100 PC boards tested automatic test setup ready will go to CSU for potting and final assembly

K. Honscheid, Ohio State University, LST Readiness Review May 2004 HV Software Complete HV application implemented –server for built in microcontroller –Qt and Ethernet/TCPIP based User Interface –Built in support for QC operation database LST tube conditioning long term test CANbus interface tested –works with BaBar IOC –sufficient bandwidth (50ms to readout one HV supply) To do: –replace tcpip interface in server with CANbus –EPICS panels, User Interface

K. Honscheid, Ohio State University, LST Readiness Review May 2004 HV Win Screen Shots

K. Honscheid, Ohio State University, LST Readiness Review May 2004 Summary All components of the High Voltage system are in production All components will be tested in CEH as part of the ongoing QC effort Ready for installation in August