Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

FPGA Configuration. Introduction What is configuration? – Process for loading data into the FPGA Configuration Data Source Configuration Data Source FPGA.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
Lesson 18 – INSTALLING AND SETTING UP WINDOWS 2000 SERVER.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Maintaining and Updating Windows Server 2008
70-293: MCSE Guide to Planning a Microsoft Windows Server 2003 Network, Enhanced Chapter 14: Problem Recovery.
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky TIM OVERVIEW1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
Configuring the MagicInfo Pro Display
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
F.F. - 18/07/ User Guide of the Input Trigger Multiplexer unit with input signal rate counters.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
R. Fantechi. DAQ tools My feelings Not dealing with readout stuff No TEL62, no CREAMS, etc But the auxiliary software needed to run the experiment After.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
The Patti Board Gianluca Lamanna (INFNPisa) TEL62 workshop – Pisa –
TTC for NA62 Marian Krivda 1), Cristina Lazzeroni 1), Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava, Slovakia 3/1/20101.
Clock and Trigger T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University Bratislava M. Krivda University of Birmingham.
Linux Operations and Administration
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
NA 62 TTC partition timing T.Blažek, V.Černý, R.Lietava, M.Kovaľ, M.Krivda Bratislava, Birmingham We are developing procedures for timing parameter adjustment.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
SL-PGA firmware overview M. Sozzi Pisa - January 30/31, 2014.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
“TALK board status” R.Fantechi, G.Lamanna & D.Gigi (CERN)
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
XML scheme for configuration data V.Černý on behalf of the Bratislava group Initiated by Marco’s call:...a software layer for implementing the handling.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
“The Dry Run” Gianluca Lamanna (CERN) TDAQ - NA62 Siena Meeting
Maintaining and Updating Windows Server 2008 Lesson 8.
Preparing software for LTU T.Blažek, V.Černý, M.Krivda, R.Lietava, M.Mojžiš Bratislava, Birmingham TDAQ working group meeting, CERN, March 24,
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Online clock software status
Status of NA62 straw readout
(ZCO) ZIMBRA Connector for Outlook User Manual
Michal Koval (CERN) Straw WG Meeting
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Vito Palladino Straw Working Group 23/3/2015
ATF/ATF2 Control System
Commissioning the SIS3316 Digitizer
TDCB status Jacopo Pinzino, Stefano Venditti
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
Online Software Status
Trigger system Marián Krivda (University of Birmingham)
M. Krivda for the ALICE trigger project, University of Birmingham, UK
Configuration Of A Pull Network.
The Performance and Scalability of the back-end DAQ sub-system
Presentation transcript:

Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 1

Outline Dry run setup TALK – LTU/TTCex – TEL62 Connection tests and Timing issues Software status Future Plans 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 2

L0 trigger system and distribution 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 3 TALK board LTU + TTCex LTU + TTCex LTU + TTCex LTU + TTCex 40 MHz clock + SoB + EoB signals TTC partition TTCrx Trigger inputs QPLL FEE BUSY/ ERROR Triggers Clock + Triggers + SoB, EoB TEL62

LTU – Dry run setup 1 VME processor + 6 TTC partitions + 3 TTCit boards LTU & TTCit boards in VME crate: 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 4 LTU numberLTU nameTTCit number 0x830000LTU_CEDAR0x8a0000 0x831000LTU_CHANTI- 0x832000LTU_MUV0x8a2000 0x833000LTU_LAV0x8a1000 0x834000LTU_CHOD- 0x835000LTU_LKR-

Connection tests LTU global mode: TALK -> LTU -> TEL62 ok LTU standalone mode: LTU -> TEL62 ok – connection tested also with TTCit SoB / EoB signals and triggers ok Choke/error – problem with connectors on LTUs – it will be fixed by Marian 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 5

Dry run - timing issues TALK – LTU connection(solved) – LVDS cable termination problem – termination resistor only at the last LTU in daisy chain TTCex phase instability after power off/on – known problem of TTCex MKII boards – dry run setup: 6x TTCex - 3 are OK, 3 are unstable →need for automatic procedure of phase measurement (in cooperation with TALK) Counter synchronization after SoB signal – 10 BC clock constant offset between TALK and TEL trigger counters – stable offset → not a problem in normal run of experiment 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 6

Software status – LTU LTUdirect software (running on the VME processor) new features: choke/error support enable/disable SoB/EoB support for emulations more friendly counter observing batch running to configure LTU’s and TTCit’s color signaling of the Run-control type of state 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 7

Software status – LTU LTUDIM software (running anywhere) functionally identical to LTUdirect communicating with LTU via DIM needs common NA62 DIM name server running, currently by Nicolas at PCNA62DCS02.cern.ch identifies LTU board not by its VME address (like 0x832000), but by its DIM name (like LTU_MUV) 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 8

30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 9

Software status – LTU DIM servers support for Run Control (tested ok) support for remote RESTART/SHUTDOWN (tested ok) – currently operated only via Did (universal DIM client) – to be decided whether to be included into Nicolas‘ or Valeri’s software added boot scripts to configure all LTU and TTCit boards in crate and start all DIM servers currently, we do not have remote access to crate power, however we do need it, can we get help? (e.g. remote customer window in Valeri’s software?) 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 10

30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 11 Did screenshot of running LTU servers

30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 12 Run Control Reboot Shutdown Did – list of LTU services

Software status – TTCit TTCitdirect software (running on the VME processor) GUI concept similar to LTUdirect added counter inspection improved snapshot memory (SSM) display we shall prepare the TTCitDIM version (similar concept to LTUDIM) 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 13

30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 14 TTCit snapshot memory window

Software status – Twiki twiki.cern.ch/twiki/bin/view/NA62/LTUrelatedSoftware download LTUdirect, LTUDIM, TTCitdirect software download manuals – installation guides – updated LTU user guide check for updates 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 15

Future plans Automatic phase measurement procedure TTCitDIM software LTU snapshot memory Improved LTU emulation: – handling of full emulation sequence in firmware (currently implemented in software) SoB – SoBT – triggers – EoB – EOBT – triggering of emu sequence by external signals SoB/EoB 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 16

Summary Local Trigger Unit (LTU) is working well Most of the issues have been resolved Software updates -> check our Twiki page Work to be done before technical run: – auto phase measurement, TTCitDIM, LTU SSM, emulation… – remote access to VME crate power 30/08/2012 NA62 Collaboration Meeting in Siena - TDAQ LTU status 17