I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Claudio Grandi INFN Bologna CMS Operations Update Ian Fisk, Claudio Grandi 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
5 November 2002J.Pater - Systemtest Report1 Endcap Systemtest Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules.
Chris Booth Sheffield 29th March 2006
End-cap Mechanics FDR Overview of the Project
MICE Target Report Video Conference 29/11/07
Status of works on the Collaboration Contract between IHEP and FAIR
Activities Status and Plan for the week
Mini-drawers, FE-ASIC , Integrator
Design of the He and HB ODU
Introduction Software is becoming very expensive:
TRENTON Casing Filler Presentation
Presentation transcript:

I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL

I Wilmut CCLRC2 Where we are l Disk 9 is finished and dispatched to Liverpool (April 04) l Disk 8 is finished and dispatched to Liverpool (Aug 04) l Disk 7 is almost finished, and will be dispatched this month l Disk 6 and 5 are in progress, »Disk 6 is 60% complete »Disk 5 is 10% complete l Disk 4 is due to begin this week. l As of this week we have 3 full time technicians building disks. l NIKHEF has all services for disk 9A and 8A. They have started both. l NIKHEF is soon to receive services for 7A

I Wilmut CCLRC3

I Wilmut CCLRC4

I Wilmut CCLRC5 Cooling circuit production l We go through lows and highs with circuit production! l Circuit production rate is sufficient…. Just. l Problems encountered and resolved include:- »Incorrect pipes delivered »Huge difficulty bending pipe from UTI (new pipe due soon) »Block supply complicated and intermittent. »Block reaming proved very problematic »Various cleaning problems. l Presently we have 3 contactors, 1 DL lab tech, making circuits and circuit components. We also have money for 1 more contractor if we start to fall behind schedule.

I Wilmut CCLRC6 Grounding and Shielding l Everything on disk is grounded accept opto harness wrap, these will be grounded once opto harnesses have passed testing. l Pipe to foil joints will be finally made after precise placement. This is proved to work on top of pipe sleeves. l Grounding finger makes disk assembly more difficult, but not impossible. l Patch panels grounded with foil fingers. l Disk grounded to support cylinder via foil tabs. l Foil plating varies in quality, Foils are only used if they can be easily tinned.

I Wilmut CCLRC7 Tapes and Opto l Oxford and Glasgow are ahead in tape supply. l Recent problem with w2 tapes, looks like it has been solved l NIKHEF is having problems with tape failiures (new cover layer) this is yet to be resolved. l Opto harness supply looks very good. RAL has harness ready down to disk 3C. l Tapes for spare disks ordered l No real worries with tapes any more.

I Wilmut CCLRC8 Bottom line l We are quite close to meeting the sheadule laid down by SH in May this year. l The final stages of disk assembly take longer than the schedules suggest. l Very few new problems are presenting them selves.

I Wilmut CCLRC9

I Wilmut CCLRC10