Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.

Slides:



Advertisements
Similar presentations
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Advertisements

1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
New I-65 Interchange at Worthsville Road Welcome!.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
COG / TPB Regional Analysis: Impacts of the U.S. Department of Defense (DoD) Base Realignment and Closure (BRAC) Recommendations For the Metropolitan Washington.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Longmeadow Parkway Fox River Bridge Corridor
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
Flintstone-Oldtown Planning Region Comprehensive Plan Kick-Off Meeting June 23, 2010 Insert pictures.
I-394 MnPASS Technical Evaluation Preliminary Findings March 23, 2006 Doug Sallman – Cambridge Systematics, Inc.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Recreational Trails Program Federal Requirements.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
REMOTE SENSING and the CSX RAIL RELOCATION EIS NCRST-E GICAP 2002 Workshop Session 3.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Context Sensitive Solutions Focus Group Session Lynn Purnell Parsons Brinckerhoff Prosperity Church Road Corridor December 8, 2005.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Integrating Transit and Highway Solutions In High Volume Corridors
Four Winds Condominium Association August 2, 2017
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status & Right-of-Way Acquisition
The Oakton Condominium Association September 12, 2017
Draft Transportation Element September 6, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Presentation transcript:

Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008

Regional Transportation Improvements

Growth and Travel Demand Change in Land Use and Travel Forecasts ( ) 0% 20% 40% 60% 80% 100% 120% 140% Population Employment Transit Trips Vehicle Trips Vehicle Miles Traveled Lane Miles Lane Miles of Congestion (Morning Rush Hour)

Base Alignment and Closure (BRAC)

Proposed I-95 DAR Ramps

Purpose and Need ■ Improve accessibility to the EPG site ■ Relieve traffic congestion in the area transportation network surrounding the site ■ Provide adequate capacity for the proposed 8,500 employees to access and exit the EPG site during the peak periods ■ Accommodate forecasted future growth in area traffic ■ Alleviate queues that result from the weaving sections between back-to-back ramps and minimize back-ups onto both I-95 and the Parkway ■ Improve operations at the I-95 / Fairfax County Parkway interchange and on the Parkway itself (which would serve as a primary entrance route to the EPG) ■ Improve accessibility to the EPG site ■ Relieve traffic congestion in the area transportation network surrounding the site ■ Provide adequate capacity for the proposed 8,500 employees to access and exit the EPG site during the peak periods ■ Accommodate forecasted future growth in area traffic ■ Alleviate queues that result from the weaving sections between back-to-back ramps and minimize back-ups onto both I-95 and the Parkway ■ Improve operations at the I-95 / Fairfax County Parkway interchange and on the Parkway itself (which would serve as a primary entrance route to the EPG)

Project Development Process

Environmental Considerations ■ Land Use ■ Socio-Economics ■ Air Quality ■ Noise Levels ■ Natural Resources ■ Aesthetics ■ Cultural Resources ■ Land Use ■ Socio-Economics ■ Air Quality ■ Noise Levels ■ Natural Resources ■ Aesthetics ■ Cultural Resources

Environmental Assessment

Summary of Impacts Resource / IssueImpactsRemarks Land UseNone Project is consistent with federal and local comprehensive plans. Displacements1 Business One commercial property will be affected and the business relocated in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policy Act of Air QualityNone Project is not expected to interfere with attainment or maintenance of National Ambient Air Quality Standards. NoiseNone No sensitive noise receptors in the immediate vicinity of the project. Water Quality Minor impacts to ground water Crossing of Field Lark Branch Pollutant loads are expected to increase in proportion to additional impervious area. Runoff impacts will be minimized through vegetated slopes, stormwater management provisions and effective construction specifications. Field Lark Branch will be carried beneath the roadway in a culvert. The culvert will be countersunk below the stream bottom profile to enable reestablishment of a natural stream bottom inside the culvert. Wetlands and FloodplainsNone Proposed alignments avoid encroachment upon these natural resources. Threatened and Endangered Species None Single recorded occurrence of small-whorled pogonia is well within EPG and far removed from project. Hazardous MaterialsNone Issues related to two previous spill sites and unexploded ordinance will be resolved in accordance with federal and state regulations. Historic and Archeological Resources None No recorded historical properties or significant archeological sites in the immediate vicinity of project.

Project Development Process

Next Phases ■ Southbound I-95 Ramp - Start Design - Build Fall Complete Construction Winter 2010 / 2011 ■ HOV Bridge - Complete Design Summer Start Construction Winter 2009 / Complete Construction Fall 2011 ■ Southbound I-95 Ramp - Start Design - Build Fall Complete Construction Winter 2010 / 2011 ■ HOV Bridge - Complete Design Summer Start Construction Winter 2009 / Complete Construction Fall 2011

PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008 Conclusion