A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.

Slides:



Advertisements
Similar presentations
Medium-Voltage Switchgear - Then and Now -
Advertisements

ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Frankfurt am Main (Germany), June 6-9, 2011 Design and Implementation of an Innovative Telecontrol System in the Vattenfall Medium- Voltage Distribution.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
Schutzvermerk / Copyright-Vermerk SION Vacuum Circuit-Breaker For Standard Applications Siemens Medium Voltage Sector Energy, Business Unit Medium Voltage.
Frankfurt (Germany), 6-9 June 2011 EN voltage dips and swells classification as an instrument for responsibility sharing Maurizio Delfanti Department.
FIPTMV Medium Voltage Technology
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
Multi-function apparatus for secondary distribution
DET 310 UNDERGROUND CABLES
Frankfurt (Germany), 6-9 June 2011 Gerhard Theil Technical University Vienna Institute of Energy Systems and Electric Drives
Frankfurt (Germany), 6-9 June 2011 Economic assessment of PQ solutions Helge SELJESETH – Norway – RT 2b – Economic assessment of PQ solutions.
Pole Mounted Switch Disconnector NPS
Frankfurt (Germany), 6-9 June 2011 Achim Hobl – Germany – RIF Session 1 – 0352 – p 1 Nexans' Superconducting Fault Current Limiters for medium voltage.
Frankfurt (Germany), 6-9 June 2011 V Ramesh – India – Session 1: Network components – 1096 Integrated Switching Devices (ISD) V.RAMESH ABB Limited, Nashik,
Frankfurt (Germany), 6-9 June 2011 M.Sc. Terje Pynten, Dr. Jan Andor Foosnæs, M.Sc. Johan G Hernes, M.Sc. Erling Tønne NTE Nett AS Paper 0696 Finding maintenance.
Circuits and Electronics. Circuits A circuit is a closed path through which a continuous charge can flow. A circuit is a closed path through which a continuous.
MNS Sprint - A Market Driven Solution
What makes substation work?
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Frankfurt (Germany), 6-9 June 2011 Hans-Erik Olovsson – Sweden – Session 1 Network Components – Paper 0453 Innovative Compact 145/12 kV Indoor Air Insulated.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
All rights reserved Gas-insulated Switchgear (GIS)
Endesa Colombia Our Distribution System In Front Of The Development Of Colombia.
Frankfurt (Germany), 6-9 June 2011 Simone Botton, Fabio Cazzato, Marco Di Clerico, Domenico Di Martino, Federico Marmeggi – Enel Distribuzione SpA Simone.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
1200 kV AC Substations - Products and Integrated Solutions International UHV Symposium New Delhi, 29. January 2009 Edelhard Kynast Siemens AG, Energy.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
Frankfurt (Germany), 6-9 June 2011  In the future, traditional fuse based over- current protection of LV networks will not be applicable for LV microgrids.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
EE 445 Course Presentation Power System Protection
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –
Frankfurt (Germany), 6-9 June 2011 Mark Davies Trevor Charlton Denis Baudin Mark Davies – UK – Session 2 – Paper 0376 New Design Methods to Achieve Greater.
PowerIT Air Insulated Cubicle Uniswitch
Frankfurt (Germany), 6-9 June 2011 KOSTIAINEN– FI – S3– 0622 Paper 0622 TOWARDS SELF-HEALING POWER DISTRIBUTION BY MEANS OF THE ZONE CONCEPT  Antti Kostiainen,
Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks.
Advanced Sensors for the Smartgrid
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Submitted to: Submitted by:
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
Submitted To:- Submitted By:- Mr.
S. MELQUIOND France Session 1 – Block 1 – Question 1- 5 Barcelona May Question 1-5 Is the transformer protection by mean of protection switch.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
What makes substation work?
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
ECE 498HZ: Power Distribution System Analysis
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
6 Week industrial Training Presentation
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Experiences on location of earth faults and short circuits
SMART GRID BASED FAULT IDENTIFICATION SYSTEM
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Fault Statistics – Quo Vadis Günther Brauner AT
ELECTRICAL POWER-II Electrical engineering sixth semester
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
Its strengths, your benefits
23.2 Applications of Circuits
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Substation Equipment's
© 2018 Global Market Insights, Inc. USA. All Rights Reserved Medium Voltage Switchgear Market Growth | Trends Analysis Report 2025.
Presentation transcript:

A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1

Main content Italian AEEG regulation scenario Main strategies Limits of current switchgear Overcome apparatus limits New approach State of the Art: DY900 Results Developments Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 2

Italian AEEG regulation scenario Italian Authority for Electrical Energy and Gas (AEEG) > 3 minutes CUMULATIVE DURATION OF LONG LASTING SUPPLY INTERRUPTION PER LV CUSTOMER Planned Accidental with fault localization Accidental without fault localization Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 3

Italian AEEG regulation scenario FRAME REGULATION DURATION OF LV CUSTOMER SUPPLY INTERRUPTIONS WITHOUT NOTICE NUMBER OF SUPPLY INTERRUPTIONS WITHOUT NOTICE PER LV CUSTOMER INDIVIDUAL REGULATION NUMBER OF CUSTOMER SUPPLY INTERRUPTIONS (FOR MV CUSTOMERS ONLY) LONG LASTING INTERRUPTIONS (LV AND MV CUSTOMERS) Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 4

Italian AEEG regulation scenario FOCUS DURATION OF LV CUSTOMER SUPPLY INTERRUPTIONS NUMBER OF SUPPLY INTERRUPTIONS WITHOUT NOTICE PER LV CUSTOMER Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 5

Main strategies REDUCE THE TIME NECESSARY TO FIND AND ISOLATE THE FAULT KEEPING IT AS SHORT AS THE 3 MIN DEADLINE MINIMIZE THE NUMBER OF CUSTOMERS AFFECTED BY THE FAULT Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 6

Limits of current switchgear SWITCH DISCONNECTORS MAIN LIMITS OPERATION TIME MAKING AND BREAKING CAPABILITY ELECTRICAL AND MECHANICAL ENDURANCE Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 7

Overcome apparatus limits THE GOAL TO OVERCOME THE SWITCH DISCONNECTOR LIMITS WHILST FINDING A GOOD TRADE-OFF BETWEEN THE NEED FOR THE EXPECTED PERFORMANCE AND LIFETIME COSTS Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 8

Overcome apparatus limits CIRED WIEN 2007 CIRED PRAGUE 2009 Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 9 9

Overcome apparatus limits With ICS DY800 Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 10 10

New approach Compact RMU with circuit-breaker per each line with disconnector and grounding switch Configuration: 2LineCB + 1PT Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 11

State of the art: DY900 High perfomance Highly reliable in polluted networks Underwater immersion resistant Compatible with remote control smart units Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 12 12

Results DY900 is fast, accurate, reliable and easy to adapt into existing systems. 10% - 15% reduction of the cumulative duration of long lasting supply interruption per LV customer. 40% reduction of the number of interruptions per customer. Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 13

Results High level of performance and economy Adoption of SF6 insulated solutions Reliability and operational safety Environmental issue Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 14 14

Next developments Two additional configurations: 3LineCB + 1PT and 3LineCB. Device for MV customer connection SF6 insulated with current and voltage transformer inside. Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 15

Next developments Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 16

THANKS FOR YOUR ATTENTION Luca GIANSANTE – ITALY – Session 3 – Paper ID0468 17