Phoenix Convention Center Phoenix, Arizona District or Distributed Integrated EnergyDistrict Heating and Cooling Robert McMillin Siemens Industry, Inc.

Slides:



Advertisements
Similar presentations
September Wood to Warmth – Heat Networks Michael Beech TV Energy.
Advertisements

Low Cost, High Innovation Efficiency in the Built Environment Brandon Fletcher, CFA Co-Founder Green Analytics.
Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
VSE Corporation Proprietary Information
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Geothermal Heat Pumps in residential and commercial HVAC systems Dan Winters 4/18/11.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Alabama Department of Economic and Community Affairs.
Team 2: Kelly Foster Chad Mills Lirjon Llusho Dave Rosso September 30, 2009.
RETScreen® Energy Efficiency Projects
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
GPAEE November 20, 2014 Combined Heat and Power Overview & CHP Technical Assistance Bill Valentine DOE Mid Atlantic CHP Technical Assistance Partnership.
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Active Solar Heating By: Atif Mian. The objective is to teach everyone more about active solar heating systems and what its advantages are.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Overview of Energy Efficiency & Renewable Energy (Draft version) Prepared by Natural Resources Canada in association with Indian and Northern Affairs Canada.
Energy Inc. E&P Division Adding to the Bottom Line: The Use of IT for E&P Companies.
Green Building Demonstration Project Adam Saling City of San Diego.
Complying with Boiler MACT using CHP as a Manufactured Product Presented by: George Voss, President Sustainability Business Management, LLC
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Co- and Poly- generation Martin Hannemann Andi Prah Nuri Feichtinger Paul Polterauer.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona Art and Science of Energy Management Agency Energy Manager The Art and Science of Energy Management Butch Wallace.
Phoenix Convention Center Phoenix, Arizona Federal Water Efficiency Sustainability TrackWater Efficient Operations Kate McMordie Stoughton Pacific Northwest.
Phoenix Convention Center Phoenix, Arizona CHP using Combustion Turbines Track 6 Integrated Energy“Combined Heat & Power” Chris Lyons Solar Turbines Incorporated.
1 Mary Medeiros McEnroe Acting Public Benefit Program Coordinator Silicon Valley Power August 20, 2008 Energy Efficiency Resources for Industrial Customers.
Phoenix Convention Center Phoenix, Arizona Energy Integration [Track Title][Session Title] Jeff Dominick DOE NREL [August XX, 2015]
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
Name of Building(s) or Project Speaker(s) Organization(s)
Challenges of Localized Cooling Systems
Phoenix Convention Center Phoenix, Arizona Metering Guidance & Best Practice Integrated EnergyMetering Strategies Saralyn Bunch Federal Energy Management.
HandiChem ™ Solid Water Treatment System (1M107).
Phoenix Convention Center Phoenix, Arizona Integrative Design: Deep Energy Approach Track 6: Integrated Energy Session 5: Integration of the Energy Industry.
Phoenix Convention Center Phoenix, Arizona Retained Energy Savings: A Success Story Track 1 Retained Energy Savings: Putting It into Practice Don JUHASZ,
Phoenix Convention Center Phoenix, Arizona Taking a Holistic Approach to Energy Strategy Integrated Energy TrackIntegration of the Energy Industry Chris.
Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost Analysis for large projects Agency Energy ManagerLife-Cycle Cost Methodology Jeanette Fiess,
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Phoenix Convention Center Phoenix, Arizona Retrofits of Existing Distributed and District Systems: Case Studies [Track Title][Session Title] Robert R.
Phoenix Convention Center Phoenix, Arizona. Energy Exchange : Federal Sustainability for the Next Decade Energy Efficiency, then Renewable Energy (EERE)
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Phoenix Convention Center Phoenix, Arizona HVAC Technologies Track 3: Energy Technologies August 12, 2015.
DISTRICT HEATING District heating is an infrastructure which allows heat generated in a centralized location to be distributed to residential homes and.
Phoenix Convention Center Phoenix, Arizona Integrated Assessment for Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS)
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Energy Conservation Building Upgrades Alma School District.
Phoenix Convention Center Phoenix, Arizona Case Studies of Institutional Change at the Campus Level Track 9: Institutional Change August 13, 2015.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Lecture Objectives: Learn about thermal storage systems
The Data Center Challenge
HYDRONIC HVAC: The Most Comfortable and Efficient System
Energy Savings Projects
UMCP Learning Objectives
Greenhouse Structures, Covering Materials, and Climate Controls
HYDRONIC HVAC: The Most Comfortable and Efficient System
HVAC EQUIPMENT General
Maniks high efficiency Desuperheater for efficient heat transfer
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Friday 8 am St. Edward's University
Michigan Energy Summit | April 25, 2019
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona District or Distributed Integrated EnergyDistrict Heating and Cooling Robert McMillin Siemens Industry, Inc. August 12, 2015

Energy Exchange : Federal Sustainability for the Next Decade Introduction Master Planning New Construction – Best time to choose a direction 2 – Likely higher first cost, but lower future cost Retrofit – Expensive – Adding to plants serving functional clusters – Diversity of building types

Energy Exchange : Federal Sustainability for the Next Decade Qualification Identify what you do and where you do it Prioritize your goals 3 Understand your capabilities and resources

Energy Exchange : Federal Sustainability for the Next Decade Identify what you do and where you do it Sometimes the decision is made for you – McAlester Army Ammunition Plant – USDA Field Office – GSA facilities in downtown San Antonio 4

Energy Exchange : Federal Sustainability for the Next Decade Prioritize your goals Cost Risk/Reliability Energy Security Environmental Energy reductions Aesthetics 5

Energy Exchange : Federal Sustainability for the Next Decade Prioritize you Goals – Cost Installation Costs Utility Costs Operations & Maintenance Cost – Fewer and more hardy equipment in plants – Fewer but higher qualified personnel in plants – Consolidation of maintenance costs and activities Replacement Cost – Longer lives and less pieces in plants – Emergency/ongoing replacements in distributed 6

Energy Exchange : Federal Sustainability for the Next Decade Prioritize you Goals – Risk/Reliability & Energy Security Redundancy – n+1 for district, n+# of bldgs for distributed Piping vs Equipment Combined Heat and Power 7

Energy Exchange : Federal Sustainability for the Next Decade Prioritize you Goals – Energy Reductions/Environmental Transmission losses Steam vs hot water Central equipment vs unitary equipment Water cooled vs air cooled Water usage and water treatment ESPC 8

Energy Exchange : Federal Sustainability for the Next Decade Prioritize you Goals – Aesthetics Central plants and storage are not necessarily the most beautiful facilities Space requirements may dictate long transmission systems and overhead lines are not “pretty” Noise Quality of Life 9

Energy Exchange : Federal Sustainability for the Next Decade Understand your Capabilities and Resources Labor Pool Available utilities and fuels Available rates 10

Energy Exchange : Federal Sustainability for the Next Decade Benefits of Distributed Systems 11 Lower first installation costs Total facility shutdown Less stringent labor force requirements Severability – Potentially more attractive as a resale property – The loss of one facility, the plant, does not shut down the campus

Energy Exchange : Federal Sustainability for the Next Decade Improve existing systems Controls Re-commissioning/Retrocommissioning Cooling – Temperature resets – Plant optimization programs – Equipment efficiency improvements Heating – Temperature and pressure reset – Plant optimization routines – Equipment efficiency improvements Variable pumping and fan speed 12

Energy Exchange : Federal Sustainability for the Next Decade Conclusions Multiple facilities/campus environment Accurately compare all costs and benefits when evaluating options Improve plant efficiency regardless of district or distributed if financially viable. Consider transferring risk to a third party 13

Phoenix Convention Center Phoenix, Arizona Contact Information Integrated EnergyDistrict Heating and Cooling Robert McMillin Siemens Industry, Inc